International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : TG1/9 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�TG1/9� C�

ITU-R�TG1/9

Compatibility between passive and active services

Results:33 total items.
Contributions �[�Source:�WP�]���Documents / Contributions

Number
Title Source Date
[ 187 ]
Liaison statement to Task Group 1/9 and Working Party 1A - Mathematical inconsistency when linking the FSS OoB domain mask of Annex 5 of Recommendation ITU-R SM.1541 and the FSS spurious emission limit of RR Appendix 3 � WP 4A 2006-09-11
[ 145 ] �
Liaison statement to TG 1/9 - Information relating to WRC-07 Agenda item 1.20 � WP's 9B and 9D 2006-07-24
[ 144 ]
Liaison statement to WP's 1A, 1B, 4A, 4-9S, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and TG 1/9, and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336 � WP 9D 2006-07-19
[ 141 ]
Liaison statement to TG 1/9 and WP 7C - Response to request for additional 1 215-1 400 MHz radar system information and comments on proposed limit for radar emission levels in the 1 400-1 427 MHz band � WP 8B 2006-04-24
[ 126 ]
Liaison statement to Task Group 1/9 - Proposed draft CPM text for WRC-07 agenda item 1.20 (Resolution 38 (WRC-03), 30-31 GHz and 50.4-51.4 GHz bands) � WP 4A 2006-04-18
[ 107 ]
Liaison statement to Task Group 1/9, copy to WP 7C for information - Agenda item 1.20 (WRC-07) � WP 4A 2006-04-18
[ 105 ]
Liaison statement to Task Group 1/9 - Request for clarification on roll-off filter characteristics for FSS uplink post-modulation filtering described in Document 4A/199 � WP 4A 2006-04-13
[ 101 ]
Liaison statement to TG 1/9 - 21 GHz BSS system characteristics � WP 6S 2006-03-29
[ 100 ]
Reply to liaison statement from TG 1/9 - Compatibility analysis between RAS (22.21-22.5 GHz) and BSS (21.4-22.0 GHz) � WP 6S (SWG 6S-1) 2006-03-29
[ 99 ]
Liaison statement to WPs 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to TG 1/9 and to JTG 6-8-9 - Revision of Recommendation ITU-R F.1336 � WP 9D 2005-12-21
[ 98 ]
Liaison statement to TG 1/9 - FSS models for use in compatibility studies relating to WRC-07 Agenda item 1.20 � WP 4A 2005-12-09
[ 97 ]
Draft Liaison statement to WP 1A and TG 1/9 - Comments regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20) � WP 4A 2005-12-09
[ 95 ]
Liaison statement to Working Party 6E and Task Group 1/9 - Sharing criteria and regulatory provisions for protection of terrestrial services in the band 620-790 MHz from BSS networks and systems, in accordance with Resolution 545 (WRC-03) � WP 7D 2005-11-22
[ 94 ]
Liaison statement to Working Party 8B and for information to Task Group 1/9 - Characteristics of EESS passive sensors in the 23.6-24 GHz band to be used in compatibility studies involving aeronautical mobile telemetry (AMT) systems under Agenda item 1.5 (WRC-07) � WP 7C 2005-11-22
[ 93 ]
Liaison statement to WP 7D and TG 1/9 - Sharing criteria and regulatory provisions for protection of terrestrial services in the band 620-790 MHz from BSS networks and systems, in accordance with Resolution 545 (WRC-03) � WP 6E 2005-10-18
[ 92 ]
Liaison statement to Working Parties 7B, 7C and 7D and for information to TG 1/9 - Compatibility studies involving aeronautical mobile telemetry (AMT) systems � WP 8B 2005-10-07
[ 91 ]
Liaison statement to Task Group 1/9 for action - Copy to Working Parties 4A and 8D for information - Comments regarding the use of the OoB domain masks in Recommendation ITU-R SM.1541 within the compatibility analyses conducted within Task Group 1/9 (Agenda item 1.20) � WP 1A 2005-09-28
[ 62 ]
Liaison statement - Representations of unwanted emission spectra for use in compatibility studies between active satellite services and passive services � WP 4A 2005-06-20
[ 61 ]
Liaison statement - Parameters for compatibility analyses between the fixed-satellite service and the inter-satellite service with the Earth exploration-satellite service (passive) � WP 4A 2005-06-20
[ 60 ]
Liaison statement to TG 1/9 - Representation of unwanted emission spectra and transmitter deployment models for use in compatibility studies between active and passive services � WPs 9B and 9D 2005-05-16
[ 59 ]
Liaison statement to Task Group 1/9 - Methodology for compatibility analysis between RAS (22.21-22.5 GHz) and BSS (21.4-22.0 GHz) � WP 6S 2005-05-05
[ 58 ]
(Rev.1)
Reply to liaison statement from Task Group 1/9 - Representation of unwanted emission spectra for use in compatibility studies between active and passive services � WP 6S 2005-05-05
[ 57 ]
Liaison statement to Working Parties 1A, 1B, 4A, 6E, 6M, 6S, 7B, 7C, 7D, 8A, 8B, 8D and 8F and to Task Groups 1/8 and 1/9, and Joint Task Group 6-8-9 - Revision of Recommendation ITU-R F.1336 � WP 9D 2005-05-02
[ 56 ]
Liaison statement to Working Party 7D and Task Group 1/9 - Frequency sharing in the band 620-790 MHz between the broadcasting-satellite service and terrestrial services � WP 6E 2005-04-14
[ 29 ]
Liaison statement to Task Group 1/9 (copy to Working Parties 4A and 8D) - Computer simulation of unwanted emission spectra for use in compatibility studies between active and passive services � WP 6S 2004-11-19
[ 28 ]
Liaison statement to TG 1/9 - Representations of unwanted emission spectra for use in compatibility studies between active and passive services � WP 4A 2004-11-08
[ 27 ]
Liaison statement to Task Group 1/9 - Parameters for compatibility analyses between the fixed-satellite service or the inter-satellite service and the Earth exploration-satellite service (passive) for frequency band pairs above 20 GHz � WP 4A 2004-11-08
[ 26 ]
Liaison statement to TG 1/9 - Apportionment of interference criteria of Recommendation ITU-R SA.1029-2 � WP 7C 2004-10-06
[ 25 ]
Liaison statement to Task Group 1/9 - Computer simulation of unwanted emission spectra for use in compatibility studies between active and passive services � WP 7C 2004-10-06
[ 24 ]
Joint liaison statement to Task Group 1/9 - Computer simulation of unwanted emission spectra for use in compatibility studies between active and passive service � WPs 9B and 9D 2004-10-05
[ 23 ]
Liaison statement to Task Group 1/9 - Response to liaison statement from Task Group 1/9 regarding computer simulation of unwanted emission spectra for use in compatibility studies between active and passive services � WP 8B 2004-09-30
[ 22 ]
Liaison statement to Task Group 1/9 - Agenda item 1.17, Resolution 745 � WP 8D 2004-09-24
[ 3 ]
Liaison statement to Task Group 1/9 - Resolution 738 (WRC-03) under WRC-07 Agenda item 1.20 � WP 7C 2004-03-29
Results:33 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-23