Contributions
�[�Source:�Robert Bosch GmbH�]��� |
�
|
Number�
|
Title
|
Source
|
Date
|
|
[ 428 ]
�
� |
Proposed modification to Attachment 6 of Annex 5 to TG 1/8 Chairman's Report - Studies related to the impact of devices using ultra-wideband technology on systems operating within the Earth exploration-satellite, space research service
�
� |
Siemens A.G.
,
Robert Bosch GmbH
� |
2005-10-05 |
|
[ 427 ]
�
� |
Amendment regarding apportionment of interference from ultra-wideband devices to the Earth exploration-satellite service in Attachment 6 to Annex 5 to Document 1-8/347
�
� |
Siemens A.G.
,
Robert Bosch GmbH
� |
2005-10-05 |
|
[ 421 ]
�
� |
Insertion of the activity factor of 24 GHz short range radars in studies related to the impact of devices using ultra-wideband technology on systems operating within the fixed service in Attachment 2 to Annex 5 to Document 1-8/347
�
� |
Robert Bosch GmbH, Siemens AG
� |
2005-10-05 |
|
[ 420 ]
�
� |
Elimination of language regarding separation distance and deactivation requirement for SRR devices operating in the 77 to 81 GHz range in Attachment 6 to Annex 5 to Document 1-8/347
�
� |
Robert Bosch GmbH, Siemens AG
� |
2005-10-05 |
|
[ 418 ]
�
� |
Traffic density study for use in compatibility studies between SRR devices around 24 GHz and earth exploration satellites (EESS)
�
� |
Robert Bosch GmbH, Siemens AG
� |
2005-10-04 |
|
[ 198 ]
�
� |
Proposed changes to [Document 1-8/TEMP/81] working document toward a preliminary draft new Recommendation ITU-R SM.[UWB.CHAR]
�
� |
Robert Bosch GmbH, Siemens AG
� |
2004-10-26 |
|
[ 197 ]
�
� |
Proposed changes to Chapter 7.10.7 of [Document 1-8/TEMP/68] on compatibility studies between UWB devices around 24 GHz and radiocommunication services
�
� |
Robert Bosch GmbH, Siemens AG
� |
2004-10-26 |
|
[ 196 ]
�
� |
Compatibility between earth exploration satellites (EESS) and ultra-wideband short range radars for automotive applications in the bands around 24 GHz
�
� |
Robert Bosch GmbH
� |
2004-10-26 |
|
[ 194 ]
�
� |
Proposed changes to Chapter 7.10.9 of [Document 1-8/TEMP/68] and to [Document 1-8/TEMP/75] on compatibility studies between UWB devices around 24 GHz and radiocommunication services
�
� |
Robert Bosch GmbH, Siemens AG
� |
2004-10-26 |
|
[ 193 ]
�
� |
Proposed changes to Chapter 7.10.6 of [Document 1-8/TEMP/68] on compatibility studies between UWB devices around 24 GHz and radicommunication services
�
� |
Robert Bosch GmbH, Siemens AG
� |
2004-10-26 |
|
[ 104 ]
�
+Ann.1-2� |
Compatibility analysis of 24 GHz vehicular short-range radar (SRR) devices and passive microwave Earth remote sensing satellites in the 23.6 to 24.0 GHz range
�
� |
Robert Bosch GmbH
,
Siemens A.G.
� |
2004-06-02 |
|
[ 88 ]
�
� |
24 GHz short-range radars (SRR) emissions into incumbent fixed service frequency bands - Comments on Chapter 3.3.7 of the Chairman's Report (Doc. 1-8/59, Annex 5)
�
� |
Robert Bosch GmbH
,
Siemens A.G.
� |
2004-05-31 |
|
[ 87 ]
�
� |
Comments from a fixed link planner's perspective on parameter sets for compatibility issues between short range radar systems and fixed service in the frequency range from 20 GHz to 30 GHz
�
� |
Robert Bosch GmbH, Siemens AG
� |
2004-05-28 |
|
[ 54 ]
�
� |
Compatibility analysis of 24 GHz vehicular short range radar (SRR) devices and passive microwave earth remote sensing satellites in the 23.6-24.0 GHz range
�
� |
Robert Bosch GmbH
� |
2003-10-24 |
Results:14 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):