International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : SG01 : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�SG01� C�

ITU-R�SG01

Spectrum management

Results:18 total items.
Contributions �[�Source:�WP 1B�]���Documents / Contributions

Number
Title Source AI/Question
Date
[ 150 ]
Executive Report to Study Group 1 � Acting Chairman, WP 1B 2007-06-15
[ 149 ]
(Rev.1-2)
Draft Report in response to Resolution 951 (WRC-03) - Options to improve the international spectrum regulatory framework � WP 1B 2007-06-15
[ 148 ]
Review of Resolution ITU-R 22-1 � WP 1B 2007-06-15
[ 125 ]
Executive Report to Study Group 1 � Acting Chairman, WP 1B 2006-10-13
[ 110 ]
Draft new Report ITU-R SM.[GUID_REGUL_FRAM] - Guidance on the regulatory framework for national spectrum management � WP 1B 2006-10-12
[ 108 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1599 - Determination of the geographical and frequency distribution of the spectrum utilization factor for frequency planning purposes � WP 1B 66/1 2006-10-12
[ 82 ]
Executive Report of Working Party 1B � Chairman, WP 1B 2005-10-19
[ 70 ]
(Rev.1)
Draft new Recommendation ITU-R SM.[EML] - An optional methodology for the evaluation of the effect of interference between radiocommunication networks operating in a shared frequency band � WP 1B 2005-10-05
[ 69 ]
(Rev.1)
Draft modification of Recommendation ITU-R SM.1538-1 - Technical and operating parameters and spectrum requirements for short-range radiocommunication devices � WP 1B 213/1 2005-10-05
[ 68 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1046-1 - Definition of spectrum use and efficiency of a radio system � WP 1B 47/1 2005-10-04
[ 56 ]
Liaison statement from ITU-R Study Group 1 to ITU-D Study Group 1 � WP 1B 2004-10-15
[ 55 ]
(Rev.1)
Draft revision of Recommendation ITU-R SM.1413-1 - Radiocommunication Data Dictionary (RDD) � WP 1B 65/1 2004-10-15
[ 54 ]
Draft new Report ITU-R SM.[Doc.1/54] - Guidance on the regulatory framework for national spectrum management � WP 1B 223/1 2004-10-15
[ 53 ]
Executive report of the Chairman of Working Party 1B � Chairman, WP 1B 2004-10-15
[ 23 ]
Executive report from Working Party 1B � Chairman, WP 1B 2003-11-05
[ 15 ]
Liaison statement to WPs 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9A, 9B and 9D - Working material towards a draft new Recommendation ITU-R SM.[...] - Criteria for the evaluation of interference between radiocommunication networks operating in a shared frequency band � WP 1B 2003-11-05
[ 13 ]
Draft new Question ITU-R [SPEC.FRAME] - Improving the international spectrum regulatory framework � WP 1B 2003-11-05
[ 9 ]
Draft revision to Question ITU-R 209/1 - Parameters of radio systems and equipment required for spectrum management and the efficient use of the radio spectrum � WP 1B 2003-11-05
Results:18 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-9