International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP9B : Contributions : 219 Recently posted�-� Search Meeting Documents
[219]� Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003)

Format

Size

Posted

English

Word

46592 bytes 2003-05-01 [219]�Annex 12 - Liaison statements

Word

398848 bytes 2003-05-01 [219]�Annex 11 - Preliminary revision of the output from JRG 8A-9B on technical characteristics of broadband FWA systems conveying Internet Protocol (IP) packets or asynchronous transfer mode (ATM) cells

Word

125952 bytes 2003-04-30 [219]�Annex 10 - Working document toward preliminary draft new Recommendation ITU-R F.[9B/AOEP] - Analysis and optimization of the error performance of digital fixed wireless systems for the purpose of bringing into service and maintenance

Word

246784 bytes 2003-04-30 [219]�Annex 9 - Preliminary draft new Recommendation - Spectrum vision for the fixed service

Zip (Document)

1334825 bytes 2003-04-30 [219]�Annex 8 - Preliminary draft new Recommendation ITU-R [9B/F.IMT-2000 ISN] - Use of the fixed service in the deployment of IMT-2000 infrastructure networks

Word

57344 bytes 2003-04-30 [219]�Annex 7 - Preliminary draft revision of Recommendation ITU-R F.1568 - Radio-frequency block arrangements for fixed wireless access systems in the range 10.15-10.3/10.5-10.65 GHz

Zip (Document)

588619 bytes 2003-04-30 [219]�Annex 6 - Working document toward preliminary draft new Recommendation ITU-R F.[HAPS-RRS] - Interference evaluation from fixed service system using high altitude platform stations (HAPS) to radio-relay system in the bands above 3 GHz

Zip (Document)

308224 bytes 2003-04-30 [219]�Annex 5 - Preliminary draft revision of Recommendation ITU-R F.1609 - Interference evaluation from fixed service systems using high altitude platform stations to conventional fixed service systems in the bands 27.5-28.35 and 31.0-31.3 GHz

Word

135168 bytes 2003-04-29 [219]� - Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003) including Annex 1 - Structure of the work, Annex 2 - Questions assigned to WP 9B, Annex 3 - List of temp. docs., Annex 4 - Summary of draft Recs.

Document :

ITU-R�WP9B� Contribution� 219

Title :

Chairman's Report of the Working Party 9B meeting (Geneva, 7-14 April 2003)

Date :

2003-04-29

Source :

Chairman, WP 9B

Access :

Restricted to TIES users�[ITU-R]

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2003-05-15