Contributions
�[�Source:�WP�]��� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 271 ]
�
� |
Liaison statement to Joint Rapporteur Group 8A-9B (copy to Working Party 8A) - Preliminary draft new Recommendation ITU-R F.[FS/NWA sharing] - Protection criteria for point-to-point fixed wireless systems sharing the same frequency band with nomadic wireless access systems in the 4 to 6 GHz range
�
� |
WP 9D
� |
� |
2003-04-29 |
|
[ 270 ]
�
� |
Liaison statement to Working Parties 7C and 8A - Studies pertaining to Question ITU-R 113-1/9 in the band 36-37 GHz
�
� |
WP 9D
� |
� |
2003-04-28 |
|
[ 269 ]
�
� |
Liaison statement to WP 8A and JRG 8A-9B - Draft revision of Recommendation ITU-R.1401 - Frequency bands for fixed wireless access systems and the identification methodology
�
� |
WP 9B
� |
� |
2003-04-28 |
|
[ 268 ]
�
� |
Liaison statement to WP 8A - Update of ITU-R Recommendation for Vocabulary
�
� |
WP 8F
� |
� |
2003-04-25 |
|
[ 267 ]
�
� |
Liaison statement to Task Group 6/8 (and for information to Working Parties 1A and 8A) - Protection of fixed wireless systems from digital video broadcasting systems
�
� |
WP 9D
� |
� |
2003-04-24 |
|
[ 266 ]
�
� |
Liaison statement to the Chairman, WP 8A - Proposed Liaison statement from WP 8A and WP 8F to ITU-D Study Group 2, Question 18/2
�
� |
WP 8F
� |
� |
2003-04-15 |
|
[ 265 ]
�
� |
Liaison statement to WPs 6E, 7D, 8A, 8B and 9D
�
� |
WP 6S
� |
� |
2003-04-11 |
|
[ 264 ]
�
� |
Liaison statement to WPs 8A and 8F, and ISO TC204 and its WP 10 - Preliminary draft new Report on broadcasting of multimedia and data applications for mobile reception
�
� |
WP 6M
� |
45/6
� |
2003-03-28 |
|
[ 263 ]
�
� |
Liaison statement to Working Parties 8A, 8B and 9D - Terrestrial digital sound broadcasting system a in the VHF band interfered with by other services than broadcasting
�
� |
WP 6E
� |
� |
2003-03-24 |
|
[ 250 ]
�
+Corr.1� |
Liaison statement to ITU-D SG 2, ITU-T SSG and ITU-R WP 8A - Strategy for migration of mobile networks to IMT-2000 and beyond
�
� |
WP 8F
� |
� |
2002-11-01 |
|
[ 249 ]
�
� |
Liaison statement to TG 1/8, copied to SG 8 and WPs 8A, 8B and 8D - Compatibility between devices using ultra-wideband (UWB) technology and IMT-2000 systems and beyond
�
� |
WP 8F
� |
� |
2002-10-17 |
|
[ 248 ]
�
� |
Report of the thirteenth meeting of WP 8A (Geneva, 17-23 Sep. 2002)
�
� |
Chairman, WP 8A
� |
� |
2002-10-10 |
|
[ 245 ]
�
� |
Liaison statement to Task Group 1/8, copied to Study Group 8 and Working Parties 8A, 8D and 8F - Compatibility between devices using ultra-wideband (UWB) technology and the maritime mobile, aeronautical mobile and radiodetermination services
�
� |
WP 8B
� |
� |
2002-09-24 |
|
[ 234 ]
�
� |
Response from WP 6E to liaison statements from WP 4A, WP 6S and TG 6/8 and liaison statement to WP 7D, WP 8A, WP 8B, WP 8D and WP 9D
�
� |
WP 6E
� |
268/11
� |
2002-09-10 |
|
[ 218 ]
�
� |
Liaison statement to WPs 1A, 7D, 8A, 8B, 9C and TG 6/7 - Response to Liaison statement to WP 6E and TG 6/7 concerning compatibility between radiocommunication systems and high data telecommunication systems using electricity power supply or telephone distributing wiring (ITU-R Q. 221/1)
�
� |
WP 6E
� |
32/6, 221/1
� |
2002-09-06 |
|
[ 214 ]
�
� |
Use of out-of-band and spurious domains
�
� |
WP 1A
� |
� |
2002-08-06 |
|
[ 213 ]
�
� |
Liaison statement to Working Parties 7C, 7D, 6E, 6S, 4A, 9D, 8A and 3J - Ultra-wideband emissions
�
� |
WPs 1A and 1B
� |
� |
2002-07-31 |
|
[ 210 ]
�
(Rev.1)� |
Liaison statement from WP 8F to WP 6S and JRG 6S-8F - Creation of a Joint Rapporteur Group 6S-8F
�
� |
WP 8F
� |
� |
2001-10-22 |
|
[ 209 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Party 8A regarding adaptive antennas
�
� |
WP 8F
� |
� |
2001-10-22 |
|
[ 208 ]
�
(Rev.1)� |
Liaison statement to WP 8A - Methods for point-to-area predictions for terrestrial services in the frequency range 30-3 000 MHz: Recommendation ITU-R P.1546
�
� |
WPs 3K and 3M
� |
� |
2001-10-22 |
|
[ 205 ]
�
(Rev.1)� |
Report of the twelfth meeting of Working Party 8A (Geneva, 8-14 May 2002)
�
� |
Chairman, WP 8A
� |
� |
2001-10-22 |
|
[ 204 ]
�
(Rev.1)� |
Liaison statement to Working Party 8A concerning WRC-03 Agenda Item 1.3
�
� |
WP 8D
� |
� |
2001-10-22 |
|
[ 203 ]
�
(Rev.1)� |
Liaison statement to the Chairman, Study Group 8, and to WP 8D and 8A for information - Compatibility between devices using ultra-wideband (UWB) technology and the mobile, radiodetermination, amateur and related satellite service
�
� |
WP 8B
� |
� |
2001-10-22 |
|
[ 185 ]
�
(Rev.1)� |
Transport information and control systems (TICS)
�
� |
Chairman, WP 8A2
� |
� |
2001-10-22 |
|
[ 173 ]
�
(Rev.1)� |
Liaison statement to WPs 8A and 8B for information
�
� |
WP 9C
� |
� |
2001-10-22 |
|
[ 156 ]
�
(Rev.1)� |
Liaison statement to TG 6/8 and, for information, to WPs 1A, 1B and 8A - Sharing and compatibility between the broadcasting service and the fixed service in the VHF and UHF bands
�
� |
WP 9D
� |
� |
2001-10-22 |
|
[ 155 ]
�
(Rev.1)� |
Liaison statement from WPs 9B and 9D - Responsibilities of JRG 8A-9B
�
� |
WPs 9B and 9D
� |
� |
2001-10-22 |
|
[ 154 ]
�
(Rev.1)� |
Liaison statement to ITU-R JTG 1-6-8-9
�
� |
JRG 8A-9B and WP 9B
� |
� |
2001-10-22 |
|
[ 152 ]
�
(Rev.1)� |
Liaison statement to WP 4-9S - Proposed elements of the CPM texts on Agenda item 1.13 (Resolutions 122 and 734)
�
� |
WP's 9B AND 9D
� |
� |
2001-10-22 |
|
[ 151 ]
�
(Rev.1)� |
Liaison statement to Working Parties 4A, 4-9S, 6S, 8A, 8D, 8F and the Speical Committee - The current regulatory situation of typical FSS and BSS earth stations
�
� |
WP 9D
� |
� |
2001-10-22 |
|
[ 146 ]
�
(Rev.1)� |
Liaison statement to Working Party 8A - Methodology for determining the availability loss of terrestrial mobile base stations due to satellite interference
�
� |
WP 6S
� |
� |
2001-10-22 |
|
[ 144 ]
�
(Rev.1)� |
Objectives for the 12th meeting
�
� |
Chairman, WP 8A
� |
� |
2001-10-22 |
|
[ 143 ]
�
(Rev.1)� |
Reply to liaison statement from WPs 8A, 8F and 9D - Working docs towards a PDNR: Blockage factors to be considered in sharing and PFD threshold studies
�
� |
WP 6S
� |
� |
2001-10-22 |
|
[ 142 ]
�
(Rev.1)� |
Reply to liaison statements from Working Party 8A and Working Party 8F - Average antenna gain at fixed elevation angle for consideration in terrestrial and satellite system sharing studies
�
� |
WP 6S
� |
� |
2001-10-22 |
|
[ 140 ]
�
(Rev.1)� |
Report of the interim meeting of Working Group 3 of Working Party 8A
�
� |
Chairman, WG 3 - WP 8A
� |
� |
2001-10-22 |
|
[ 138 ]
�
(Rev.1)� |
Liaison statement to Working Party 8A
�
� |
WP 6M
� |
� |
2001-10-22 |
|
[ 137 ]
�
(Rev.1)� |
Liaison statement to WP 8A and WP 9C (WRC-03 Agenda item 1.36)
�
� |
WP 6E
� |
� |
2001-10-22 |
|
[ 136 ]
�
(Rev.1)� |
Liaison statement to Working Party 8A (copy to Working Party 9C)
�
� |
WP 6E
� |
� |
2001-10-22 |
|
[ 133 ]
�
(Rev.1)� |
Liaison statement to ITU-R JTG 1-6-8-9, WP's 1B, 6E, 6M, 8A, 9B and JRG 8A-9B
�
� |
WP 8F
� |
� |
2001-10-22 |
|
[ 132 ]
�
(Rev.1)� |
Liaison statement to WP 8A - Response to request for information for Public Protection and Disaster Relief Communications (PPDR)
�
� |
WP 8F
� |
� |
2001-10-22 |
|
[ 131 ]
�
(Rev.1)� |
Liaison statement to WP 8A - Response to request for information for Public Protection and Disaster Relief communications (PPDR)
�
� |
WP 8F
� |
� |
2001-10-22 |
|
[ 130 ]
�
(Rev.1)� |
Liaison statement to WP 8A - WP 8F input on the CPM text for Agenda item 1.3 of WRC-03 on Public Protection and Disaster Relief (PPDR)
�
� |
WP 8F
� |
� |
2001-10-22 |
|
[ 127 ]
�
(Rev.1)� |
Liaison statement to WP 8A (copy to WP 7E for information) - Preliminary draft revision to Recommendation ITU-R SA.1260 and draft CPM text for WRC-03 Agenda item 1.38
�
� |
WP 7C
� |
� |
2001-10-22 |
|
[ 126 ]
�
(Rev.1)� |
Liaison statement to WPs 9D and 8A - Sharing studies pertaining to Question 232-1/7 on the band 36-37 GHz
�
� |
WP 7C
� |
� |
2001-10-22 |
|
[ 124 ]
�
(Rev.1)� |
This document has been withdrawn
�
� |
WP 9B
� |
� |
2001-10-22 |
|
[ 123 ]
�
(Rev.1)� |
Liaison statement to WPs 7C, 7D, 8A, 8B and 9D - Elements for proposed draft CPM text regarding non-GSO MSS feeder-link allocations near 1.4 GHz
�
� |
WP 8D
� |
� |
2001-10-22 |
|
[ 122 ]
�
(Rev.1)� |
Liaison statement to WP 8A - Public protection and disaster relief communications (PPDR)
�
� |
WP 8D
� |
� |
2001-10-22 |
|
[ 121 ]
�
(Rev.1)� |
Liaison statement to WP 4A, WP 6S, WP 8A, WP 8F, WP 9D and the Special Committee on The current regulatory situation of typical FSS and BSS earth stations
�
� |
WP 4-9S
� |
� |
2001-10-22 |
|
[ 120 ]
�
(Rev.1)� |
Proposed liaison statement from WP 1B - Response concerning radio regulation radio service definitions to accommodate terrestrial wireless interactive multimedia (TWIM) systems
�
� |
WP 1B
� |
� |
2001-10-22 |
|
[ 119 ]
�
(Rev.1)� |
Liaison statement to Working Parties 4A, 6E, 6S, 7A, 7B, 7C, 8A, 8B, 8D, 8F and 9B - Definitions of the spectral properties of transmitter emissions
�
� |
WP 1A
� |
� |
2001-10-22 |
Results:101 total items. Result page:�
1 -
2 -
3
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):