International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP7C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP7C� C�

ITU-R�WP7C

Earth-exploration satellite systems and meteorological elements

Results:12 total items.
Contributions �[�Source:�WP 4A�]���Documents / Contributions

Number
Title Source Date
[ 266 ]
Liaison statement to WPs 7C and 7D, and JRG 8A-9B - Preliminary draft revision of Recommendation ITU-R S.1427 � WP 4A 2003-04-08
[ 219 ]
(Rev.1)
Liaison from WP 4A � WP 4A 2002-02-11
[ 218 ]
(Rev.1)
Liaison statement to TG 1/7, WPs 7C and 7D on band-by-band studies � WP 4A 2002-02-11
[ 217 ]
(Rev.1)
Liaison statement to Working Party 7C and Task Group 1/7 on technical parameters of the ISS systems in the band 22.55-23.55 GHz � WP 4A 2002-02-11
[ 216 ]
(Rev.1)
Liaison to WPs 1A/6S, 7B, 7C, 8D, Satellite Backlog Action Group - Development of software requirements for automating the examination of space filings for compliance with Article 5 � WP 4A 2002-02-11
[ 214 ]
(Rev.1)
LS on compatibility analysis between the EESS (passive) in the band 50.2-50.4 GHz and a possible new allocation to the GSS (space-to-Earth) in parts of the band 47.2-50.2 GHz � WP 4A 2002-02-11
[ 134 ]
(Rev.1)
Liaison statement to WP 7C and JTG 4-7-8-9 - Earth exploration-satellite service (active) allocation in the band 5 140-5 250 MHz � WP 4A 2002-02-11
[ 125 ]
(Rev.1)
Liaison to Working Parties 1A, 6S, 7B, 7C, 8D, Satellite Backlog Action Group and the Radiocommunications Bureau - Development of specifications for automating Article S5 and other provisions of the radio regulations � WP 4A 2002-02-11
[ 124 ]
(Rev.1)
Liaison Statement to the Special Committee, Working Parties 1A, 6S, 7B, 7C and 8D and Note to the Director, Radiocommunication Bureau � WP 4A 2002-02-11
[ 122 ]
(Rev.1)
Liaison statement to Task Group 1/7, Working Parties 6S, 7C, 7D, 7E, 8D and 9D - Methods under consideration regarding WRC-03 agenda item 1.8.2 � WP 4A 2002-02-11
[ 104 ]
(Rev.1)
Liaison statement to Working Parties 1A, 6S, 7C, 8D and the BR - Automating Article S5 and other provisions of the Radio Regulations � WP 4A 2002-02-11
[ 38 ]
(Rev.1)
Liaison statement from Working Party 7C to Task Group 1/5, and Working Parties 7C and 7D concerning the band-by-band study � WP 4A 2002-02-11
Results:12 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-23