International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient orbit/spectrum utilization

Results:12 total items.
Contributions �[�Source:�WP 7D�]���Documents / Contributions

Number
Title Source Date
[ 498 ]
Liaison statement to Task Group 1/7 and Working Parties 4A and 6S - Compatibility between FSS/BSS systems operating below 42.5 GHz and RAS antenna operating in the band 42.5-43.5 GHz � WP 7D 2002-10-09
[ 497 ]
Liaison statement to JWP 4-9S, WP 4A and TG 1/7 - Compatibility issues between the radio astronomy service and possible new allocations to the fixed-satellite service (space-to-Earth) � WP 7D 2002-10-09
[ 379 ]
Liaison statement to Working Parties 6S, 4A, 8D and Task Group 1/7 � WP 7D 2001-10-03
[ 378 ]
Liaison statement to Working Party 4A and Task Group 1/7 - CPM text for Agenda item 1.32 (Resolution 128) � WP 7D 2001-10-03
[ 377 ]
Liaison statement to TG 1/7 and WPs 4A, 6S and 8D - Comments on the preliminary annexes on band-by-band studies to the TG 1/7 Chairman's Report dealing with radio astronomy frequency bands � WP 7D 2001-10-03
[ 375 ]
Liaison statement to TG 1-7 and WPs 4A and 6S - Measurements of unwanted emission levels from geostationary systems of the fixed-satellite service in the radio astronomy frequency band 4 990-5 000 GHz � WP 7D 2001-11-05
[ 374 ]
Liaison statement to Task Group 1/7 and Working Parties 4A, 6S and 8D - Comments on the preliminary draft CPM text developed by Task Group 1/7 � WP 7D 2001-10-03
[ 216 ]
Draft liaison statement to WP 4A and TG 1/7 concerning Characteristics of radio astronomy receivers relevant to the rejection of emissions in adjacent and nearby bands � WP 7D 2001-10-03
[ 212 ]
(Rev.1)
Liaison statement to Working Parties 4A, 8D and Task Group 1/7 - Development of the epfd methodology for modelling interference by non-GSO satellite systems to stations in the radio astronomy service � WP 7D 2001-10-03
[ 211 ]
Liaison statement to Working Parties 4A, 7E and 8D concerning Agenda item 1.11 of WRC-03 � WP 7D 2001-10-03
[ 8 ]
Liaison statement to Working Party 4A - Working Document on methodology for interference calculations between radio astronomy telescopes and NGSO satellite systems � WP 7D 2001-10-03
[ 6 ]
Liaison statement to Working Party 4A - Proposal for interference calculations between radio astronomy telescopes and non-GSO satellite systems � WP 7D 2001-10-03
Results:12 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-10