International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient orbit/spectrum utilization

Results:21 total items.
Contributions �[�Source:�WP 4-9S�]���Documents / Contributions

Number
Title Source Date
[ 548 ]
Liaison statement to WP 4A - Request for additional information on the characteristics of HEO fixed-satellite service systems in the 4, 11/12 and 18 GHz bands � JWP 4-9S 2003-05-12
[ 482 ]
Liaison statement to WP 4A - Simplified coordination and recording of assignments of earth stations of high density systems in the FSS � WP 4-9S 2001-10-03
[ 476 ]
Note to the Chapter 3 Rapporteur for the draft CPM Report - Text for Sections 3.7.2.2 and 3.7.3.5 of the draft CPM Report (WRC-03 Agenda item 1.37) � WP 4-9S 2001-10-03
[ 475 ]
Liaison statement to Working Party 8B for comments and Working Parties 4A and 6S for information - Proposed use of the 17.3-18.1 GHz band for the FSS (earth-to-space) and its possible implications on the radiolocation service � WP 4-9S 2001-10-03
[ 365 ]
(Rev.1)
Liaison statement to Working Parties 4A, 6S, 7E, 7B, 8D, 9A, 9B and 9D - A draft new Recommendation and a draft new revision of Recommendations dealing with sharing bewtween the FS and FSS operating in the band 37.5 to 42.5 GHz � WP 4-9S 2001-10-03
[ 364 ]
Draft liaison statement to ITU-D Study Group 1 and ITU-R Working Parties 4A, 6S and 9D � WP 4-9S 2001-10-03
[ 358 ]
Liaison statement from WP 4-9S - Preliminary draft CPM text for WRC-03 Agenda item 1.37 � WP 4-9S 2001-10-03
[ 357 ]
Liaison statement to WP 4A, WP 6S, WP 8A, WP 8F, WP 9D and the Special Committee on The current regulatory situation of typical FSS and BSS earth stations � WP 4-9S 2001-10-03
[ 354 ]
Liaison statement to Working Party 4A - Implementation of GSO FSS earth stations without individual site coordination � WP 4-9S 2001-10-03
[ 124 ]
Liaison statement to Working Parties 4A and 4B - The percentage of time during which fixed-satellite service nominal clear-sky power flux-density levels may be exceeded to overcome fading conditions, while protecting the fixed service, and permitting operation... � WP 4-9S 2001-10-03
[ 121 ]
Liaison statement to Working Party 4A - Sharing criteria between the fixed-satellite service using highly elliptical orbits and the fixed service � WP 4-9S 2001-10-03
[ 118 ]
Liaison statement to Working Parties 4A, 4B, 9A and 9B - Fixed service and fixed-satellite service parameters and characteristics in the 38 GHz and 40 GHz bands to be considered under agenda item 1.32 (WRC-03) � WP 4-9S 2001-10-03
[ 116 ]
Liaison statement to WP 4A - Characteristics of earth stations on board vessels � WP 4-9S 2001-10-03
[ 115 ]
Liaison statement to WP 4A � WP 4-9S 2001-10-03
[ 114 ]
Liaison statement to Working Parties 4A, 8A and 8B - Use of frequencies by Earth stations on board vessels transmitting in the 14 GHz band allocated to the Fixed-Satellite Service � WP 4-9S 2001-10-03
[ 97 ]
Liaison statement to WP 4A - Modifications to Recommendation ITU-R S.1257 � WP 4-9S 2001-10-03
[ 86 ]
Liaison statement to ITU-R Working Party 4A - Methodology for interference evaluation, technical parameters and operational techniques for frequency sharing between the FS using high altitude platform stations (RR FN S5.537/S5.SSS) and the FSS in. � WP 4-9S 2001-10-03
[ 85 ]
Liaison statement to WP 4A concerning Studies performed by WP 4-9S regarding Mitigation techniques proposed for fixed-satellite service (FSS) to facilitate sharing with fixed service (FS) in the band 17.7-19.7 GHz � WP 4-9S 2001-10-03
[ 84 ]
Liaison statement to Working Party 4A - Characteristics of Earth stations on-board vessels operating in the FSS frequency bands 3 700-4 200 MHz and 5 926-6 425 MHz � WP 4-9S 2001-10-03
[ 83 ]
Liaison statement to Working Parties 9A, 9B and 4A - A new methodology to be used for the evaluation of the impact of space-to-Earth interference from the fixed-satellite service on the fixed service in frequency bands where ... � WP 4-9S 2001-10-03
[ 79 ]
Liaison statement to Working Parties 4A, 8A and 8B - Use of earth stations on board vessels operating in the 11/14 GHz bands � WP 4-9S 2001-10-03
Results:21 total items.
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2025-1-10