International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : CACE : Circulars : 875 Recently posted�-� Search Meeting Documents
[875]� Proposed adoption of 3 draft new ITU-R Recommendations and 6 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) and the Proposed suppression of 1 ITU-R Recommendation

Format

Size

Posted

English

Word

57512 bytes 2018-11-21 [875]�

PDF (acrobat)

499375 bytes 2018-11-21 [875]�
Arabic

Word

63675 bytes 2018-11-21 [875]�

PDF (acrobat)

396904 bytes 2018-11-21 [875]�
Chinese

Word

60344 bytes 2018-11-21 [875]�

PDF (acrobat)

465150 bytes 2018-11-21 [875]�
Espa�ol

Word

57521 bytes 2018-11-21 [875]�

PDF (acrobat)

601843 bytes 2018-11-21 [875]�
Fran�ais

Word

63960 bytes 2018-11-21 [875]�

PDF (acrobat)

591302 bytes 2018-11-21 [875]�
Russian

Word

63752 bytes 2018-11-21 [875]�

PDF (acrobat)

574199 bytes 2018-11-21 [875]�

Document :

ITU-R�CACE� Circular� 875

Title :

Proposed adoption of 3 draft new ITU-R Recommendations and 6 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with � A2.6.2.4 of Resolution ITU R 1-7 (Procedure for the simultaneous adoption and approval by correspondence) and the Proposed suppression of 1 ITU-R Recommendation

Date :

2018-11-01

Source :

SG 6

Access :

Public Document

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-01-22