Circulars
�[�Destination:�T22-SG15�]�
|
�
|
Number�
|
Title
|
Source
|
Destination
|
Date
|
|
[ 230 ]
�
� |
ITU Workshop on "Evolution of Optical Networks for IMT2030 and Beyond" (Hong Kong, China, 20 November 2024)
�
� |
TSB
� |
SG15
� |
2024-09-04 |
|
[ 224 ]
�
� |
Approval of Recommendations ITU-T G.9930, G.9941 and G.9942
�
� |
TSB
� |
SG15
� |
2024-07-25 |
|
[ 212 ]
�
� |
ITU Workshop on "The Evolution of Transport and Access Networks to Support IMT 2030/6G (7 July 2024) & Fourth Joint ETSI ISG F5G, BBF, CCSA TC6 and ITU-T SG15 Workshop on "FTTR" (Fibre to the room), (10 July 2024) Montreal, Canada
�
� |
TSB
� |
SG15
� |
2024-06-10 |
|
[ 201 ]
�
� |
Ninth Joint IEEE 802 and ITU-T Study Group 15 Workshop (Montreal, Canada, 13 July 2024)
�
� |
TSB
� |
SG15
� |
2024-04-05 |
|
[ 196 ]
�
� |
Deletion of Recommendation ITU-T L.106/L.58 (2004)
�
� |
TSB
� |
SG15
� |
2024-03-15 |
|
[ 166 ]
�
� |
Proposed deletion of Recommendation ITU-T L.106/L.58 (2004) agreed to by ITU-T SG15 at its meeting on 1 December 2023
�
� |
TSB
� |
SG15
� |
2023-12-13 |
|
[ 165 ]
�
� |
Status of Recommendation ITU-T G.9964 after the ITU-T Study Group 15 meeting (Geneva, 20 November - 1 December 2023)
�
� |
TSB
� |
SG15
� |
2023-12-13 |
|
[ 164 ]
�
� |
Approval of Recommendations ITU-T G.9940 and G.9961
�
� |
TSB
� |
SG15
� |
2023-12-13 |
|
[ 107 ]
�
� |
Questionnaire on practical and technical aspects of the outdoor optical infrastructures sharing between multiple operators
�
� |
TSB
� |
SG15
� |
2023-05-26 |
|
[ 105 ]
�
� |
Questionnaire on cable ships and submersible equipment
�
� |
TSB
� |
SG15
� |
2023-05-22 |
|
[ 102 ]
�
� |
Third Joint ETSI ISG F5G, BBF, CCSA TC6 and ITU-T SG15 Workshop on "FTTR" (Fibre to the room) (Fully Virtual Meeting, 23 June 2023)
�
� |
TSB
� |
SG15
� |
2023-05-22 |
|
[ 101 ]
�
� |
Member State consultation on Determined draft revised Recommendation ITU-T G.9964, proposed for approval at the meeting of ITU-T Study Group 15, Geneva, 20 November - 1 December 2023
�
� |
TSB
� |
SG15
� |
2023-05-16 |
|
[ 100 ]
�
� |
Status of Recommendation ITU-T G.9901 (2017) Amd.1 after the ITU-T Study Group 15 meeting (Geneva, 17-28 April 2023)
�
� |
TSB
� |
SG15
� |
2023-05-16 |
|
[ 99 ]
�
� |
Approval of ITU-T G.9962
�
� |
TSB
� |
SG15
� |
2023-05-17 |
|
[ 68 ]
�
� |
Establishment of the Joint Coordination Activity on Quantum Key Distribution Network (JCA-QKDN) and its first meeting (Geneva, 22 March 2023)
�
� |
TSB
� |
SG11, SG13, SG15, SG17
� |
2023-01-11 |
|
[ 65 ]
�
� |
9th Workshop on "Joint Task Force on SMART Cables" (Honolulu, United States of America, 19 - 20 January 2023)
�
� |
TSB
� |
SG15
� |
2022-12-20 |
|
[ 51 ]
�
� |
Member State consultation on Determined draft Amendment 1 to G.9901 (2017), proposed for approval at the meeting of ITU-T Study Group 15, Geneva, 17 - 28 April 2023
�
� |
TSB
� |
SG15
� |
2022-11-02 |
|
[ 16 ]
�
� |
Second Joint ETSI ISG F5G, BBF, CCSA TC6 and ITU-T SG15 Workshop on "FTTR" (Fibre to the room) (Fully Virtual Meeting, 28 June 2021)
�
� |
TSB
� |
SG15
� |
2022-05-19 |
|
[ 1 ]
�
� |
Study Period 2022-2024: General information on ITU-T activities; Registration to participate in the Alternative Approval Process (AAP); Request for contacts and addresses for the TSB database
�
� |
TSB
� |
SG02, SG12, SG13, SG15, SG17
� |
2022-03-17 |
Results:19 total items.
� |
Multiple Document Download:�Formats and Languages to be included (when available):