Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1263 ]
�
� |
Proposal on RTM for cable cut-off wavelength in revision of ITU-T Rec. G.650.1
�
� |
FiberHome Technologies Group
� |
Q5/15
� |
2015-06-08 |
|
[ 1262 ]
�
� |
Revision Proposal for Appendix I of recommendation L.60
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2015-06-08 |
|
[ 1261 ]
�
� |
Proposal of technical clauses for revision of recommendation L.60
�
� |
FiberHome Technologies Group
� |
Q16/15
� |
2015-06-08 |
|
[ 1260 ]
�
� |
Fibre cut-off measurement on bending-loss-insensitive fibres
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/15
� |
2015-06-08 |
|
[ 1259 ]
�
� |
CLPAJ and NTT comments on draft Rec. ITU-T L.fmc
�
� |
Communication Line Products Association of Japan
,
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q7/15
� |
2015-06-08 |
|
[ 1258 ]
�
� |
G.993.2: G.994.1 codepoints associated with use of Annex Q
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1257 ]
�
� |
G.fast: Proposed update for test parameters description (G.9701 Amendment 1)
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1256 ]
�
� |
G.fast: Proposed corrigendum to G.9701/Table 9-21 (derived framing parameters)
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1255 ]
�
� |
G.fast: Derived framing parameters for low power modes
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1254 ]
�
� |
G.fast: Proposed text changes in Amendment 1 related to description of LPMode
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1253 ]
�
� |
G.fast: Proposed amendment to definition of LPMode control primitives
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1252 ]
�
� |
G.997.2: Proposed corrigendum for clause 7
�
� |
Lantiq Beteiligungs-GmbH & Co. KG
� |
Q4/15
� |
2015-06-08 |
|
[ 1251 ]
�
(Rev.1)� |
The suggestion of adding some new Abbreviations and acronyms into G.709 and G.798
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2015-06-08 |
|
[ 1250 ]
�
� |
The modification of figure 15-1B of G.709
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2015-06-08 |
|
[ 1249 ]
�
� |
Proposal of a new PTP TC layer structure diagram
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2015-06-08 |
|
[ 1248 ]
�
� |
Adding ODUCn to figures 12-2 and 12-3 of G.709
�
� |
FiberHome Technologies Group
� |
Q11/15
� |
2015-06-08 |
|
[ 1247 ]
�
� |
The MI of OCh/OTUCn should be added into G.874
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2015-06-08 |
|
[ 1246 ]
�
� |
The MI of OSx/CBRx should be added into G.874
�
� |
FiberHome Technologies Group
� |
Q14/15
� |
2015-06-08 |
|
[ 1245 ]
�
� |
Requirements of flexible B100G OTUCn interface
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
China Telecommunications Corporation
� |
Q11/15
� |
2015-06-08 |
|
[ 1244 ]
�
� |
Comments to G.989.3 Draft 20150601
�
� |
Futurewei Technologies US R&D Center
� |
Q2/15
� |
2015-06-08 |
|
[ 1243 ]
�
� |
Amendment of ONU state diagram of PtP WDM TC
�
� |
FiberHome Technologies Group
� |
Q2/15
� |
2015-06-08 |
|
[ 1242 ]
�
� |
Propose to start a new work on G.gim's handbook
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
� |
Q14/15
� |
2015-06-08 |
|
[ 1241 ]
�
� |
Proposals to clause 11 about the management aspects of controller in G.asdtn
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q12/15
� |
2015-06-08 |
|
[ 1240 ]
�
� |
Proposals on clause 8.4 of G.asdtn about control components interactions sequence arrangement
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q12/15
� |
2015-06-08 |
|
[ 1239 ]
�
(Rev.1-2)� |
Proposals to Clause 8.3 of G.asdtn
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q14/15, Q12/15
� |
2015-06-08 |
|
[ 1238 ]
�
� |
Comments on G.gim (G.7711)
�
� |
Fujitsu Limited
� |
Q14/15
� |
2015-06-08 |
|
[ 1237 ]
�
� |
Consideration on OAM PDU Generation/Reception process in G.8121
�
� |
Fujitsu Limited
� |
Q14/15, Q10/15
� |
2015-06-08 |
|
[ 1236 ]
�
� |
Proposed clause 8.8.6 (Proactive DM) for G.8121.1
�
� |
Fujitsu Limited
� |
Q10/15
� |
2015-06-08 |
|
[ 1235 ]
�
� |
Proposed clause 8.8.4 and 8.8.5 (Proactive and on-demand LM) for G.8121.1
�
� |
Fujitsu Limited
� |
Q10/15
� |
2015-06-08 |
|
[ 1234 ]
�
� |
Proposed solution to Living List SP#28 (LL and SAT PDU) in G.8013/Y.1731
�
� |
Fujitsu Limited
� |
Q10/15
� |
2015-06-08 |
|
[ 1233 ]
�
� |
Proposals to G.8113.1 on adding new OAM functions and mechanism for Bandwidth Notification and Expected Defect
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
� |
Q10/15
� |
2015-06-08 |
|
[ 1232 ]
�
� |
Proposal for speed up long-haul high bitrate WDM systems Recommendation study
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Telecommunications Corporation
,
ZTE Corporation
� |
Q6/15
� |
2015-06-08 |
|
[ 1231 ]
�
� |
Consideration on 25GbE over OTN
�
� |
KDDI Corporation
� |
Q11/15
� |
2015-06-08 |
|
[ 1230 ]
�
� |
Updated proposal for alternative in-band OSNR measurement technique in G.697
�
� |
Ministry of Industry and Information Technology (MIIT)
,
China Mobile Communications Corporation
,
ZTE Corporation
� |
Q6/15
� |
2015-06-08 |
|
[ 1229 ]
�
� |
Measurement results and consideration on EVM related parameters
�
� |
Ministry of Industry and Information Technology (MIIT)
,
ZTE Corporation
� |
Q6/15
� |
2015-06-08 |
|
[ 1228 ]
�
(Rev.1)� |
Deployment conditions in L.pneid
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q16/15
� |
2015-06-08 |
|
[ 1227 ]
�
� |
Proposal of new recommendation on studying indoor high speed Visible Light Communications(VLC)
�
� |
Ministry of Industry and Information Technology (MIIT)
,
FiberHome Technologies Group
,
Huawei Technologies Co., Ltd.
,
ZTE Corporation
� |
Q2/15, Q18/15, Q15/15
� |
2015-06-08 |
|
[ 1226 ]
�
� |
L.oxcon "outdoor optical cross connect cabinet"
�
� |
Ministry of Industry and Information Technology (MIIT)
,
FiberHome Technologies Group
,
Huawei Technologies Co., Ltd.
� |
Q16/15
� |
2015-06-08 |
|
[ 1225 ]
�
� |
Proposed addition of a carrying-case-type recourse unit to draft L.dm-nrr-mdru
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2015-06-08 |
|
[ 1224 ]
�
� |
Proposal of new study item related to water detection in splice closures for the maintenance of optical fibre cable networks in underground areas
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q17/15
� |
2015-06-08 |
|
[ 1223 ]
�
� |
Proposal to speed up the revision of G.698.2
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2015-06-07 |
|
[ 1222 ]
�
� |
Proposal to discuss application code considering the span distance and link loss in G.metro
�
� |
China Unicom
� |
Q6/15
� |
2015-06-07 |
|
[ 1221 ]
�
� |
The consideration of communication channel of G.metro
�
� |
ADVA Optical Networking
,
China Unicom
,
Electronics and Telecommunications Research Institute (ETRI)
,
FiberHome Technologies Group
,
Telefon AB - LM Ericsson
,
ZTE Corporation
� |
Q6/15
� |
2015-06-07 |
|
[ 1220 ]
�
� |
Considerations on the revision of G.654 for terrestrial application
�
� |
China Unicom
� |
Q6/15, Q5/15
� |
2015-06-07 |
|
[ 1219 ]
�
� |
Measurements on EVM and OSNR
�
TSB NOTE - This Contribution was reposted on 24 June 2015 to correct a display issue in some versions of Word. There are no content changes in the replacement file.
� |
China Unicom
,
ADVA Optical Networking
,
Alcatel-Lucent International
,
Coriant GmbH & Co. KG
,
Deutsche Telekom AG
,
Fraunhofer-Institut f�r Nachrichtentechnik Heinrich-Hertz-Institut
,
Keysight Technologies Deutschland GmbH
,
Orange
� |
Q6/15
� |
2015-06-07 |
|
[ 1218 ]
�
� |
Proposal to initiate the discussions about the work item of using submarine cable network for climate monitoring and disaster prediction
�
� |
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2015-06-07 |
|
[ 1217 ]
�
� |
Proposal of revision of G.973
�
� |
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2015-06-07 |
|
[ 1216 ]
�
� |
Proposal to modify the scope of Recommendation ITU-T G.979
�
� |
China Mobile Communications Corporation
,
China Unicom
,
Ministry of Industry and Information Technology (MIIT)
� |
Q8/15
� |
2015-06-07 |
|
[ 1215 ]
�
� |
Considerations on physical layer parameters for G.metro
�
� |
Finisar Corporation
,
Telefon AB - LM Ericsson
� |
Q6/15
� |
2015-06-07 |
|
[ 1214 ]
�
� |
Proposed update for MI signal definition in G.8051 and G.8052
�
� |
NEC Corporation
� |
Q14/15
� |
2015-06-06 |
Results:2210 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):