Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1440 ]
�
� |
Second generation ETH MEP and MIP functions
�
� |
Huawei
� |
Q9/15
� |
2011-02-02 |
|
[ 1439 ]
�
� |
Comments on differentiation of MPLS-TP environments
�
� |
NSN
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1438 ]
�
� |
G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-02-02 |
|
[ 1437 ]
�
� |
G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2
�
� |
Alcatel-Lucent Bell N.V.
� |
Q4/15
� |
2011-02-02 |
|
[ 1436 ]
�
� |
Control elements for BMCA in telecom
�
� |
NSN
� |
Q13/15
� |
2011-02-02 |
|
[ 1435 ]
�
� |
MATIE, MTIE, and MAFE graphs into metrics definitions
�
� |
NSN
� |
Q13/15
� |
2011-02-02 |
|
[ 1434 ]
�
� |
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1433 ]
�
� |
G.hn: Proposed Annex for extension of G.hn for optical transmission media
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1432 ]
�
� |
G.hn: Backup Domain master related corrigendum items for G.9961
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1431 ]
�
� |
G.hn: Corrigendum items for G.9961
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1430 ]
�
� |
G.hn: Update of the text for the "symbol boosting" mechanism
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1429 ]
�
� |
G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1428 ]
�
� |
G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1427 ]
�
� |
G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1426 ]
�
� |
G.hn: Channel estimation protocol for G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1425 ]
�
� |
G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1424 ]
�
� |
Treatment of delay jumps in PDV data
�
� |
NSN
� |
Q13/15
� |
2011-02-02 |
|
[ 1423 ]
�
� |
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM)
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1422 ]
�
� |
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1421 ]
�
� |
G.VDSL: INM INPEQ Histogram
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1420 ]
�
� |
Functional model of HAO
�
� |
Huawei
� |
Q9/15, Q11/15
� |
2011-02-01 |
|
[ 1419 ]
�
� |
G.VDSL: INM IAT Histogram
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1418 ]
�
� |
Dealing with multiple criteria of packet selection
�
� |
Calnex Solutions
� |
Q13/15
� |
2011-02-01 |
|
[ 1417 ]
�
� |
G.LT: PSD Shaped SELT
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1416 ]
�
� |
Modifications for draft G.798.1 (TD 379/P)
�
� |
ETRI
� |
Q9/15
� |
2011-02-01 |
|
[ 1415 ]
�
� |
Proposed modification on OTM-0.mvn in G.798
�
� |
ETRI
� |
Q9/15
� |
2011-02-01 |
|
[ 1414 ]
�
� |
Proposal for addition of HO OPU mapping types in G.709
�
� |
ETRI
� |
Q11/15
� |
2011-02-01 |
|
[ 1413 ]
�
� |
Proposed modification of G.709 (12/2009) Appendix XII for inclusion in G.709 Amendment 2
�
� |
ETRI
� |
Q11/15
� |
2011-02-01 |
|
[ 1412 ]
�
� |
Addition of new Appendix/G.7041 for ODUflex(GFP) packet data throughput
�
� |
ETRI
� |
Q11/15
� |
2011-02-01 |
|
[ 1411 ]
�
� |
Fixes in the recommendation to deal with multicast traffic
�
� |
Marvell Semiconductor
� |
Q4/15
� |
2011-02-01 |
|
[ 1410 ]
�
� |
G.hn: Proposal for Channel Estimation bandwidth reservation
�
� |
Marvell Semiconductor
� |
Q4/15
� |
2011-02-01 |
|
[ 1409 ]
�
� |
Bandwidth allocation protocol
�
� |
Marvell Semiconductor
� |
Q4/15
� |
2011-02-01 |
|
[ 1408 ]
�
� |
Proposal for Corrigendum (Geneva meeting) - analyzing different fixes to the current approved versions of G.9960 and G.9961
�
� |
Marvell Semiconductor
� |
Q4/15
� |
2011-02-01 |
|
[ 1407 ]
�
� |
G.vdsl: End to End Model and Precision requirements from ToD over VDSL2
�
� |
Ministry of Communications (Israel (State of))
� |
Q4/15
� |
2011-02-01 |
|
[ 1406 ]
�
� |
OMCI Tip-Ring Test Result for POTS UNI
�
� |
A.T. Communication Channels
,
Ericsson
� |
Q2/15
� |
2011-02-01 |
|
[ 1405 ]
�
� |
OMCI updates for Vendor-specific Test Parameters
�
� |
A.T. Communication Channels
,
Ericsson
� |
Q2/15
� |
2011-02-01 |
|
[ 1404 ]
�
� |
Enabling variable message length in extended message format
�
� |
A.T. Communication Channels
,
Alcatel-Lucent
,
Ericsson
� |
Q2/15
� |
2011-02-01 |
|
[ 1403 ]
�
� |
G.gen: G.hn: G.vdsl: Reference Modelling for FTTdp Final Drops - For Information
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1402 ]
�
� |
G.gen: G.hn: G.vdsl: RF Ingress above 30 MHz - For Information
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1401 ]
�
� |
Improvement of Annex E/G.709 (40GbE/100GbE transport over OTN)
�
� |
NTT
� |
Q9/15, Q11/15
� |
2011-02-01 |
|
[ 1400 ]
�
� |
Time Error Budget in the Base Stations and considerations on the rearrangements in the time synchronization network
�
� |
Ericsson
� |
Q13/15
� |
2011-02-01 |
|
[ 1399 ]
�
� |
Specification of DPSK demodulator or delay line interferometer towards revised G.671
�
� |
Alcatel-Lucent
� |
Q7/15
� |
2011-02-01 |
|
[ 1398 ]
�
� |
Considerations on flexible grids
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2011-02-01 |
|
[ 1397 ]
�
� |
Progress on standardization of P-DPSK modulation format
�
� |
Alcatel-Lucent
� |
Q6/15
� |
2011-02-01 |
|
[ 1396 ]
�
� |
Relation between G.aon and G.872
�
� |
Deutsche Telekom
� |
Q12/15
� |
2011-02-01 |
|
[ 1395 ]
�
� |
WCh clients in draft G.aon
�
� |
Deutsche Telekom
� |
Q12/15
� |
2011-02-01 |
|
[ 1394 ]
�
� |
Properties of a Wavelength Channel in draft G.aon
�
� |
Deutsche Telekom
� |
Q12/15
� |
2011-02-01 |
|
[ 1393 ]
�
� |
G.INP: VDSL2 will require retransmission upstream
�
� |
BT
� |
Q4/15
� |
2011-02-01 |
|
[ 1392 ]
�
� |
BBER objectives in Recommendation G.8201
�
� |
Deutsche Telekom
� |
Q9/15
� |
2011-02-01 |
|
[ 1391 ]
�
� |
Synchronisation Budget
�
� |
BT
� |
Q13/15
� |
2011-02-01 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):