Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 33 ]
�
� |
Methodology contained in Annex 2 to Resolution 770 (WRC-19) to determine compliance with the single entry limits in RR No. 22.5L
�
� |
Director, BR
� |
� |
2020-06-25 |
|
[ 32 ]
�
� |
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups
�
� |
Director, BR
� |
� |
2020-06-25 |
|
[ 31 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18
�
� |
WP 4C
� |
AI1.18
� |
2020-06-11 |
|
[ 30 ]
�
+Ann.1-3� |
Report on the meeting of Working Party 4A (28-29 May 2020) (Virtual Meeting)
�
� |
Chairman, WP 4A
� |
� |
2020-06-02 |
|
[ 29 ]
�
� |
Final list of participants - Working Party 4A (E-meeting, 28-29 May 2020)
�
� |
Director, BR
� |
� |
2020-06-01 |
|
[ 28 ]
�
� |
List of documents issued (Documents 4A/1 - 4A/28)
�
� |
BR, Study Groups Department
� |
� |
2020-05-25 |
|
[ 27 ]
�
� |
Methodology to examine conformity of aeronautical ESIM communicating with GSO FSS with pfd limits
�
� |
Canada
� |
� |
2020-05-21 |
|
[ 26 ]
�
� |
Proposal to establish a Correspondence Group for study on the examination characteristics of aeronautical ESIM complying with the power flux density limits on the Earth's surface specified in Part II of Annex 3 to the Resolution 169 (WRC-19)
�
� |
Korea (Republic of)
� |
AI1.5
� |
2020-05-21 |
|
[ 25 ]
�
� |
Proposed liaison statement to Working Party 5D on the applicability of the limit specified in RR No. 21.5
�
� |
France
� |
� |
2020-05-20 |
|
[ 24 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHZ] - Methods to assist administrations to mitigate interference from GSO FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz
and 27-27.5 GHz
�
� |
France
� |
� |
2020-05-20 |
|
[ 23 ]
�
� |
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C and 7B (copy for information to Working Party 3M) requesting characteristics for use in sharing studies under WRC-23 agenda item 1.17
�
� |
France
� |
AI1.17
� |
2020-05-20 |
|
[ 22 ]
�
� |
Proposed liaison statement to Working Party 5D (copy to Working Parties 5B, 7B and 7C)
�
� |
France
� |
� |
2020-05-20 |
|
[ 21 ]
�
� |
Proposed Work plan for WRC-23 agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2020-05-20 |
|
[ 20 ]
�
� |
Amendments to the new issue for WRC-23 agenda item 7
�
� |
Germany (Federal Republic of)
� |
AI7
� |
2020-05-19 |
|
[ 19 ]
�
� |
Proposed schedule for Working Party 4A Correspondence Groups on WRC-23 agenda items 1.15, 1.16, 1.17, 1.19, 7 - Inter/intra-service sharing and FSS/BSS characteristics
�
� |
Chairman, WP 4A
� |
AI7, AI1.19, AI1.17, AI1.16, AI1.15
� |
2020-05-19 |
|
[ 18 ]
�
� |
Preliminary position on WRC-23 agenda
�
� |
World Meteorological Organization
� |
� |
2020-05-13 |
|
[ 17 ]
�
(Rev.1)� |
Proposed establishment of Correspondence Groups to progress some specific/urgent works within the purview of Working Party 4A
�
� |
Chairman, WP 4A
� |
� |
2020-05-08 |
|
[ 16 ]
�
� |
Contribution to Working Parties 4A, 4B and 4C on relevant agenda items of WRC-23
�
� |
Iran (Islamic Republic of)
� |
� |
2020-05-06 |
|
[ 15 ]
�
� |
Contribution to Working Party 4A on agenda item 1.16 of the WRC-23
�
� |
Iran (Islamic Republic of)
� |
AI1.16
� |
2020-05-03 |
|
[ 14 ]
�
� |
Contribution to Working Party 4A on agenda item 1.15 toward a preliminary draft revision of Resolution 172 (WRC-19) - Operation of earth stations on aircraft and vessels communicating with geostationary space stations in the fixed-satellite service in the frequency band 12.75-13.25 GHz (Earth-to-space)
�
� |
Iran (Islamic Republic of)
� |
AI1.15
� |
2020-05-03 |
|
[ 13 ]
�
(Rev.1)� |
Proposed draft liaison statement to contributing Working Parties regarding WRC-23 agenda item 1.19
�
� |
Chairman, WP 4A
� |
AI1.19
� |
2020-05-01 |
|
[ 12 ]
�
(Rev.1)� |
Proposed draft liaison statement to contributing Working Parties regarding WRC-23 agenda item 1.17
�
� |
Chairman, WP 4A
� |
AI1.17
� |
2020-05-01 |
|
[ 11 ]
�
(Rev.1)� |
Proposed draft liaison statement to contributing Working Parties regarding WRC-23 agenda item 1.16
�
� |
Chairman, WP 4A
� |
AI1.16
� |
2020-05-01 |
|
[ 10 ]
�
(Rev.1)� |
Proposed draft liaison statements to contributing Working Parties regarding WRC-23 agenda item 1.15
�
� |
Chairman, WP 4A
� |
AI1.15
� |
2020-05-01 |
|
[ 9 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C (copy to Working Parties 3J and 3M for information) - Request system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz and adjacent bands
�
� |
WP 7C
� |
AI1.14
� |
2020-04-30 |
|
[ 8 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 2/2 to ITU-R Working Party 4A on ambulance communications
�
� |
ITU-D SG2
� |
� |
2020-03-06 |
|
[ 7 ]
�
� |
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2
�
� |
WP 5D
� |
AI1.2, AI1.1
� |
2020-03-06 |
|
[ 6 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2
�
� |
WP 5D
� |
AI1.2
� |
2020-03-06 |
|
[ 5 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4
�
� |
WP 5D
� |
AI1.4
� |
2020-03-06 |
|
[ 4 ]
�
� |
Liaison statement to Working Party 4A - Interference mitigation and co-existence of FSS earth stations and IMT stations
�
� |
WP 5D
� |
� |
2020-03-06 |
|
[ 3 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Party 6A) - Preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY]
�
� |
WP 5D
� |
� |
2020-03-06 |
|
[ 2 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R WP 1A, WP 1C, WP 4A, WP 5A, WP 5C, WP 5D and WP 6A on strategies and policies concerning human exposure to EMF
�
� |
ITU-D SG2
� |
� |
2019-11-29 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2015-2019 study period
�
� |
WP 4A
� |
� |
2019-10-31 |
Results:983 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
� |
Multiple Document Download:�Formats and Languages to be included (when available):