International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5D� C�

ITU-R�WP5D

IMT Systems

Results:1310 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 360 ]
Update Report on CITEL PCC.II Activities � CITEL Rapporteur 2016-10-03
[ 359 ]
Liaison statement to 3GPP, ETSI TC/SES, ITU-R Working Party 5D and ITU-T Study Group 13 - Invitation to consider integration of satellite -based solutions into IMT-2020 networks � WP 4B 2016-10-03
[ 358 ]
Liaison statement to Working Party 5D - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz � WP 4C 2016-09-30
[ 357 ]
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band � WP 4C 2016-09-29
[ 356 ]
Liaison statement to Working Party 5D - Co-existence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the 2 GHz band in different countries � WP 4C 2016-09-29
[ 355 ]
Update on recent activities within CEPT � ITU Region 1 (CEPT) Rapporteur 2016-09-29
[ 354 ]
Activities related to IMT in Region 3 � Region 3 Rapporteur 2016-09-29
[ 353 ]
Preliminary results from initial study on propagation measurements for the development of channel models for IMT-2020 technology evaluation � Canada 2016-09-28
[ 352 ]
Channel models for IMT-2020 evaluation � Nokia Solutions and Networks Oy 2016-09-28
[ 351 ]
Harmonization of channel models for the evaluation of IMT-2020 technology proposals � Telefon AB - LM Ericsson , Samsung Electronics Co., Ltd. , Telstra Corporation Ltd. 229-4/5 2016-09-28
[ 350 ]
Development and finalization of PDNR M.[IMT.MODEL] � Intel Corporation , Telefon AB - LM Ericsson 2016-09-28
[ 349 ]
Proposed modification to the working document towards preliminary draft new Report ITU-R M.[IMT-2020.EVAL] � China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Huawei Technologies Co. Ltd. , Intel Corporation , InterDigital Communications Corp. , Nokia Solutions and Networks Oy , NTT DOCOMO Inc. , Orange , Qualcomm, Inc. , Samsung Electronics Co., Ltd. , Spark NZ Limited , Telefon AB - LM Ericsson , Telstra Corporation Ltd. , ZTE Corporation 2016-09-28
[ 348 ]
Working document towards technology aspects on low mobility rural scenario for ITU-R M.[IMT-2020.EVAL] � India (Republic of) 2016-09-28
[ 347 ]
Proposal related to the revision of Recommendation ITU-R M.1036-5 � Orange , Telecom Italia S.p.A. , Telef�nica, S.A. , Telia Company AB 2016-09-28
[ 346 ]
Proposals for working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] � Telefon AB - LM Ericsson , AT&T, Inc. , China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Huawei Technologies Co. Ltd. , Intel Corporation , InterDigital Communications Corp. , Nokia Solutions and Networks Oy , NTT DOCOMO, Inc. , Orange , Qualcomm, Inc. , Spark NZ Limited , Telstra Corporation Ltd. , ZTE Corporation 2016-09-28
[ 345 ]
Technical performance requirement and evaluation methodology for network energy efficiency � Telefon AB - LM Ericsson , Orange 2016-09-28
[ 344 ]
Deployment-related parameters for IMT-2020 networks to be used in sharing and compatibility studies for WRC-19 agenda item � GSMA 2016-09-28
[ 343 ]
Proposal on the working document towards a preliminary draft new Report ITU-R M.[IMT-2020. SUBMISSION] � Orange , Telecom Italia S.p.A. , Telef�nica, S.A. 2016-09-28
[ 342 ]
Proposal on the working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] � Orange , Telecom Italia S.p.A. , Telef�nica, S.A. 2016-09-28
[ 341 ]
Proposed update to Document IMT-2020/2, "Submission, evaluation process and consensus building for IMT-2020" � Orange , Telecom Italia S.p.A. , Telef�nica, S.A. 2016-09-28
[ 340 ]
Proposed update of the working document towards a preliminary draft new Report M.[IMT.BY OTHER INDUSTRIES] - "The use of terrestrial component of International Mobile Telecommunication (IMT) by other industry sectors" � Telefon AB - LM Ericsson 2016-09-28
[ 339 ]
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 1 427-1 518 MHz � Djibouti (Republic of) , Egypt (Arab Republic of) , Qatar (State of) , United Arab Emirates 2016-09-28
[ 338 ]
Harmonized Spectrum in 700 MHz Band for IoT/M2M � Bahrain (Kingdom of) , Egypt (Arab Republic of) , Jordan (Hashemite Kingdom of) , Lebanon , Qatar (State of) , United Arab Emirates 2016-09-28
[ 337 ]
Comments to preliminary draft new Recommendation ITU-R M.[IMT.MODEL] � European Broadcasting Union 2016-09-28
[ 336 ]
Ground reflection modelling for IMT-2020 channel model � Samsung Electronics Co., Ltd. 2016-09-28
[ 335 ]
Proposal on harmonized channel model for IMT-2020 evaluation � Samsung Electronics Co., Ltd. , Telefon AB - LM Ericsson 2016-09-28
[ 334 ]
Proposed modifications to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCED SHARING] � Korea (Republic of) 2016-09-28
[ 333 ]
Answers to Question on Spectrum Needs for IMT under WRC-19 agenda item 1.13 � Korea (Republic of) AI1.13 2016-09-28
[ 332 ]
Proposal on channel model for IMT-2020 evaluation � Korea (Republic of) 2016-09-28
[ 331 ]
Proposal of characteristic values of terrestrial IMT systems for frequency sharing/interference analyses in the frequency range between 24.25 GHz and 86 GHZ � Korea (Republic of) 2016-09-28
[ 330 ]
Proposal for Report ITU-R M.[IMT-2020.SUBMISSION] � Korea (Republic of) 2016-09-28
[ 329 ]
Proposal for Report ITU-R M.[IMT-2020.EVAL] � Korea (Republic of) 2016-09-28
[ 328 ]
Proposal for Report ITU-R M.[IMT-2020.TECH PERF REQ] � Korea (Republic of) 2016-09-28
[ 327 ]
Proposal for revision to Document IMT-2020/2 on submission, evaluation process and consensus building for IMT-2020 � Korea (Republic of) 2016-09-28
[ 326 ]
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13 � Japan AI1.13 2016-09-28
[ 325 ]
Proposed modifications to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCE SHARING] under WRC-19 agenda item 9.1 (issue 9.1.1) � Japan AI9.1 2016-09-28
[ 324 ]
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2) � Japan AI9.1 2016-09-28
[ 323 ]
Proposed modification to the preliminary draft new Recommendation ITU-R M.[IMT.MODEL] � Japan 2016-09-28
[ 322 ]
Views on Recommendation ITU-R M.1036 � Japan 2016-09-28
[ 321 ]
Proposed modification to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5 � Japan 2016-09-28
[ 320 ]
Proposal for revision on IMT-2020/2 "IMT-2020 Process" document � Japan 2016-09-28
[ 319 ]
Optional items to be captured in preliminary draft new Report M.[IMT-2020 SUBMISSION] � Japan , China (People's Republic of) , Korea (Republic of) 2016-09-28
[ 318 ]
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT-2020.SUBMISSION] � Japan 2016-09-28
[ 317 ]
Development of channel models for test environments in Report ITU-R M.[IMT-2020.EVAL] � Japan 2016-09-28
[ 316 ]
Extension module below 6 GHz on channel model for IMT-2020 evaluation � Japan 2016-09-28
[ 315 ]
Additional test environments in Report ITU-R M.[IMT-2020-.EVAL] � Japan , China (People's Republic of) 2016-09-28
[ 314 ]
Evaluation methodology and evaluation configuration for Report ITU-R M.[IMT-2020.EVAL] � Japan 2016-09-28
[ 313 ]
Mapping of technical performance requirements and test environments under usage scenarios � Japan , China (People's Republic of) , Korea (Republic of) 2016-09-28
[ 312 ]
Proposal on target values of technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ] � Japan 2016-09-28
[ 311 ]
Proposal on draft Addendum 2 to Circular Letter 5/LCCE/59 on IMT-2020 development � Japan , China (People's Republic of) , Korea (Republic of) 2016-09-28
Results:1310 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-06-07