Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 360 ]
�
� |
Update Report on CITEL PCC.II Activities
�
� |
CITEL Rapporteur
� |
� |
2016-10-03 |
|
[ 359 ]
�
� |
Liaison statement to 3GPP, ETSI TC/SES, ITU-R Working Party 5D and ITU-T Study Group 13 - Invitation to consider integration of satellite -based solutions into IMT-2020 networks
�
� |
WP 4B
� |
� |
2016-10-03 |
|
[ 358 ]
�
� |
Liaison statement to Working Party 5D - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the
mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
WP 4C
� |
� |
2016-09-30 |
|
[ 357 ]
�
� |
Liaison statement to Working Parties 3K and 3M (copy for information to Working Party 5D) -
Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band
�
� |
WP 4C
� |
� |
2016-09-29 |
|
[ 356 ]
�
� |
Liaison statement to Working Party 5D - Co-existence and compatibility study between mobile satellite systems and terrestrial IMT-Advanced systems in the 2 GHz band in different countries
�
� |
WP 4C
� |
� |
2016-09-29 |
|
[ 355 ]
�
� |
Update on recent activities within CEPT
�
� |
ITU Region 1 (CEPT) Rapporteur
� |
� |
2016-09-29 |
|
[ 354 ]
�
� |
Activities related to IMT in Region 3
�
� |
Region 3 Rapporteur
� |
� |
2016-09-29 |
|
[ 353 ]
�
� |
Preliminary results from initial study on propagation measurements for the development of channel models for IMT-2020 technology evaluation
�
� |
Canada
� |
� |
2016-09-28 |
|
[ 352 ]
�
� |
Channel models for IMT-2020 evaluation
�
� |
Nokia Solutions and Networks Oy
� |
� |
2016-09-28 |
|
[ 351 ]
�
� |
Harmonization of channel models for the evaluation of IMT-2020 technology proposals
�
� |
Telefon AB - LM Ericsson
,
Samsung Electronics Co., Ltd.
,
Telstra Corporation Ltd.
� |
229-4/5
� |
2016-09-28 |
|
[ 350 ]
�
� |
Development and finalization of PDNR M.[IMT.MODEL]
�
� |
Intel Corporation
,
Telefon AB - LM Ericsson
� |
� |
2016-09-28 |
|
[ 349 ]
�
� |
Proposed modification to the working document towards preliminary draft new Report ITU-R M.[IMT-2020.EVAL]
�
� |
China Mobile Communications Corporation
,
DaTang Telecommunication Technology & Industry Holding Co. Ltd
,
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
InterDigital Communications Corp.
,
Nokia Solutions and Networks Oy
,
NTT DOCOMO Inc.
,
Orange
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Spark NZ Limited
,
Telefon AB - LM Ericsson
,
Telstra Corporation Ltd.
,
ZTE Corporation
� |
� |
2016-09-28 |
|
[ 348 ]
�
� |
Working document towards technology aspects on low mobility rural scenario for ITU-R M.[IMT-2020.EVAL]
�
� |
India (Republic of)
� |
� |
2016-09-28 |
|
[ 347 ]
�
� |
Proposal related to the revision of Recommendation ITU-R M.1036-5
�
� |
Orange
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
,
Telia Company AB
� |
� |
2016-09-28 |
|
[ 346 ]
�
� |
Proposals for working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]
�
� |
Telefon AB - LM Ericsson
,
AT&T, Inc.
,
China Mobile Communications Corporation
,
DaTang Telecommunication Technology & Industry Holding Co. Ltd
,
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
InterDigital Communications Corp.
,
Nokia Solutions and Networks Oy
,
NTT DOCOMO, Inc.
,
Orange
,
Qualcomm, Inc.
,
Spark NZ Limited
,
Telstra Corporation Ltd.
,
ZTE Corporation
� |
� |
2016-09-28 |
|
[ 345 ]
�
� |
Technical performance requirement and evaluation methodology for network energy efficiency
�
� |
Telefon AB - LM Ericsson
,
Orange
� |
� |
2016-09-28 |
|
[ 344 ]
�
� |
Deployment-related parameters for IMT-2020 networks to be used in sharing and compatibility studies for WRC-19 agenda item
�
� |
GSMA
� |
� |
2016-09-28 |
|
[ 343 ]
�
� |
Proposal on the working document towards a preliminary draft new Report ITU-R M.[IMT-2020. SUBMISSION]
�
� |
Orange
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
� |
� |
2016-09-28 |
|
[ 342 ]
�
� |
Proposal on the working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]
�
� |
Orange
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
� |
� |
2016-09-28 |
|
[ 341 ]
�
� |
Proposed update to Document IMT-2020/2, "Submission, evaluation process and consensus building for IMT-2020"
�
� |
Orange
,
Telecom Italia S.p.A.
,
Telef�nica, S.A.
� |
� |
2016-09-28 |
|
[ 340 ]
�
� |
Proposed update of the working document towards a preliminary draft new Report M.[IMT.BY OTHER INDUSTRIES] - "The use of terrestrial component of International Mobile Telecommunication (IMT) by other industry sectors"
�
� |
Telefon AB - LM Ericsson
� |
� |
2016-09-28 |
|
[ 339 ]
�
� |
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 1 427-1 518 MHz
�
� |
Djibouti (Republic of)
,
Egypt (Arab Republic of)
,
Qatar (State of)
,
United Arab Emirates
� |
� |
2016-09-28 |
|
[ 338 ]
�
� |
Harmonized Spectrum in 700 MHz Band for IoT/M2M
�
� |
Bahrain (Kingdom of)
,
Egypt (Arab Republic of)
,
Jordan (Hashemite Kingdom of)
,
Lebanon
,
Qatar (State of)
,
United Arab Emirates
� |
� |
2016-09-28 |
|
[ 337 ]
�
� |
Comments to preliminary draft new Recommendation ITU-R M.[IMT.MODEL]
�
� |
European Broadcasting Union
� |
� |
2016-09-28 |
|
[ 336 ]
�
� |
Ground reflection modelling for IMT-2020 channel model
�
� |
Samsung Electronics Co., Ltd.
� |
� |
2016-09-28 |
|
[ 335 ]
�
� |
Proposal on harmonized channel model for IMT-2020 evaluation
�
� |
Samsung Electronics Co., Ltd.
,
Telefon AB - LM Ericsson
� |
� |
2016-09-28 |
|
[ 334 ]
�
� |
Proposed modifications to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCED SHARING]
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 333 ]
�
� |
Answers to Question on Spectrum Needs for IMT under WRC-19 agenda item 1.13
�
� |
Korea (Republic of)
� |
AI1.13
� |
2016-09-28 |
|
[ 332 ]
�
� |
Proposal on channel model for IMT-2020 evaluation
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 331 ]
�
� |
Proposal of characteristic values of terrestrial IMT systems for frequency sharing/interference analyses in the frequency range between 24.25 GHz and 86 GHZ
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 330 ]
�
� |
Proposal for Report ITU-R M.[IMT-2020.SUBMISSION]
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 329 ]
�
� |
Proposal for Report ITU-R M.[IMT-2020.EVAL]
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 328 ]
�
� |
Proposal for Report ITU-R M.[IMT-2020.TECH PERF REQ]
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 327 ]
�
� |
Proposal for revision to Document IMT-2020/2 on submission, evaluation process and consensus building for IMT-2020
�
� |
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 326 ]
�
� |
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13
�
� |
Japan
� |
AI1.13
� |
2016-09-28 |
|
[ 325 ]
�
� |
Proposed modifications to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCE SHARING] under WRC-19 agenda item 9.1 (issue 9.1.1)
�
� |
Japan
� |
AI9.1
� |
2016-09-28 |
|
[ 324 ]
�
� |
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)
�
� |
Japan
� |
AI9.1
� |
2016-09-28 |
|
[ 323 ]
�
� |
Proposed modification to the preliminary draft new Recommendation ITU-R M.[IMT.MODEL]
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 322 ]
�
� |
Views on Recommendation ITU-R M.1036
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 321 ]
�
� |
Proposed modification to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 320 ]
�
� |
Proposal for revision on IMT-2020/2 "IMT-2020 Process" document
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 319 ]
�
� |
Optional items to be captured in preliminary draft new Report M.[IMT-2020 SUBMISSION]
�
� |
Japan
,
China (People's Republic of)
,
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 318 ]
�
� |
Proposed modifications to working document towards a preliminary draft new Report ITU-R M.[IMT-2020.SUBMISSION]
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 317 ]
�
� |
Development of channel models for test environments in Report ITU-R M.[IMT-2020.EVAL]
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 316 ]
�
� |
Extension module below 6 GHz on channel model for IMT-2020 evaluation
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 315 ]
�
� |
Additional test environments in Report ITU-R M.[IMT-2020-.EVAL]
�
� |
Japan
,
China (People's Republic of)
� |
� |
2016-09-28 |
|
[ 314 ]
�
� |
Evaluation methodology and evaluation configuration for Report ITU-R M.[IMT-2020.EVAL]
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 313 ]
�
� |
Mapping of technical performance requirements and test environments under usage scenarios
�
� |
Japan
,
China (People's Republic of)
,
Korea (Republic of)
� |
� |
2016-09-28 |
|
[ 312 ]
�
� |
Proposal on target values of technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ]
�
� |
Japan
� |
� |
2016-09-28 |
|
[ 311 ]
�
� |
Proposal on draft Addendum 2 to Circular Letter 5/LCCE/59 on IMT-2020 development
�
� |
Japan
,
China (People's Republic of)
,
Korea (Republic of)
� |
� |
2016-09-28 |
Results:1310 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):