Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1490 ]
�
� |
Considerations on ODUflex and ODUflex resizing
�
� |
Ciena Corporation
� |
Q11/15
� |
2011-02-02 |
|
[ 1489 ]
�
� |
G.vector, G.vdsl, G.hn: Performance Study on Using Linear Precoding (Vectoring) for High Frequency DSL
�
� |
LM Ericsson AB
� |
Q4/15
� |
2011-02-02 |
|
[ 1488 ]
�
� |
G.hnem: Proposal for CES format
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1487 ]
�
� |
G.hnem: Proposal for CES format
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1486 ]
�
� |
G.hnem: Proposal for update of the text for sections 7.4.5 -7.4.7, 7.5
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1485 ]
�
� |
G.hnem: Proposal for the number of symbols for PFH transmission
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1484 ]
�
� |
G.hn: Proposal for AKM procedure update for multicast
�
� |
Lantiq
� |
Q4/15
� |
2011-02-02 |
|
[ 1483 ]
�
� |
G.hn: Proposal for using CTMG frame for all short management messages
�
� |
Lantiq
� |
Q4/15
� |
2011-02-02 |
|
[ 1482 ]
�
� |
G.hn: Proposal for channel estimation protocol update
�
� |
Lantiq
� |
Q4/15
� |
2011-02-02 |
|
[ 1481 ]
�
� |
G.hn: Miscellaneous G.9961 corrigendum issues
�
� |
Lantiq
� |
Q4/15
� |
2011-02-02 |
|
[ 1480 ]
�
� |
G.hn: Miscellaneous G.9960 corrigendum issues
�
� |
Lantiq
� |
Q4/15
� |
2011-02-02 |
|
[ 1479 ]
�
� |
G.hn: Miscellaneous G.9960 amendment issues
�
� |
Lantiq
� |
Q4/15
� |
2011-02-02 |
|
[ 1478 ]
�
� |
G.hnem: Proposal for the text update for section 7.8 (PMI)
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1477 ]
�
� |
G.hnem: Proposal for updates in the text of section 7.7.3
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1476 ]
�
� |
G.hnem: Proposal for update of the text for section 7.4.1-7.4.4
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1475 ]
�
� |
Updates to �7.2.3.1 on PFH
�
� |
Yitran Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1474 ]
�
� |
Interleaver Design
�
� |
Yitran Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1473 ]
�
� |
G.hnem: Proposal for update of the text for section 7.3
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1472 ]
�
� |
Discussion on Channel Estimation Symbols
�
� |
Yitran Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1471 ]
�
� |
G.vdsl, G.hn: BT's FTTdp Vision
�
� |
BT
� |
Q4/15
� |
2011-02-02 |
|
[ 1470 ]
�
� |
Comments to G3
�
� |
Yitran Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1469 ]
�
� |
G.hnem: Proposal for update of the text for sections 7.1, 7.2
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1468 ]
�
� |
Transitional Link attributes for optical transponders and 3R regenerators in the OTN
�
� |
Alcatel-Lucent
� |
Q14/15, Q12/15
� |
2011-02-02 |
|
[ 1467 ]
�
(Rev.1)� |
Allocation and assignment of experimental and non-standard code points
�
� |
United States of America
� |
Q10/15
� |
2011-02-02 |
|
[ 1466 ]
�
� |
G.hnem: Proposal for the text update of Annex C
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1465 ]
�
(Rev.1)� |
USA on Consent of Draft Recommendation G.tpoam
�
� |
United States of America
� |
Q10/15
� |
2011-02-02 |
|
[ 1464 ]
�
� |
G.hnem: Informative Appendix to describe use cases and installation examples
�
� |
Lantiq AEG
� |
Q4/15
� |
2011-02-02 |
|
[ 1463 ]
�
� |
Wavelength conversion in reconfigurable multi-degree optical nodes
�
� |
Deutsche Telekom
� |
Q7/15
� |
2011-02-02 |
|
[ 1462 ]
�
� |
Considerations on transverse compatibility for systems according to G.698.2
�
� |
Deutsche Telekom
� |
Q6/15
� |
2011-02-02 |
|
[ 1461 ]
�
� |
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"
�
� |
NSN
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1460 ]
�
� |
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1459 ]
�
� |
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics)
�
� |
France Telecom
,
Tellabs
� |
Q13/15
� |
2011-02-02 |
|
[ 1458 ]
�
� |
Network PDV accumulation study with "end-to-end" data traffic model
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1457 ]
�
� |
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1456 ]
�
� |
G.8272: comments on PRTC limits proposal
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1455 ]
�
� |
G.8263: testing methodology for the PDV tolerance of a packet slave clock
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1454 ]
�
� |
G.8261.1: Hypothetical Reference Models proposal
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1453 ]
�
� |
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1452 ]
�
� |
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1451 ]
�
� |
Analysis of phase/time distribution over OTN networks
�
� |
France Telecom
� |
Q9/15, Q13/15, Q11/15
� |
2011-02-02 |
|
[ 1450 ]
�
� |
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization
�
� |
France Telecom
� |
Q13/15
� |
2011-02-02 |
|
[ 1449 ]
�
� |
Further consideration of requirements for on-demand segment monitoring in MPLS-TP
�
� |
NTT
,
Telecom Italia
� |
Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1448 ]
�
� |
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP
�
� |
NTT
� |
Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1447 ]
�
� |
Proposal for additional delay measurement functions in MPLS-TP OAM
�
� |
NTT
� |
Q9/15, Q14/15, Q10/15
� |
2011-02-02 |
|
[ 1446 ]
�
� |
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP
�
� |
NTT
� |
Q3/15, Q13/15
� |
2011-02-02 |
|
[ 1445 ]
�
� |
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions
�
� |
ISOC
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
|
[ 1444 ]
�
� |
G.hn: corrections to Tunnel termination for a corrigendum to G.9961
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1443 ]
�
� |
G.hn: Handling multicast traffic in G.hn
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1442 ]
�
� |
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn
�
� |
CopperGate Communications
� |
Q4/15
� |
2011-02-02 |
|
[ 1441 ]
�
� |
Withdrawn: MPLS-TP Standards
�
� |
BT
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-02-02 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):