International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:915 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 15 ]
Liaison statement to Radiocommunication Study Groups and Working Parties � Chairman, CCV 2016-04-01
[ 14 ]
Proposals on WRC-19 agenda item 9.1, issue 9.1.9 � Russian Federation AI9.1 2016-03-31
[ 13 ]
Liaison statement on Network Security Requirements for Public Protection and Disaster Relief (PPDR) and Emergency Communications to ITU-R Working Parties 4A, 4B, 4C; and ITU-R Working Party 5A � ITU-T SG 17 2016-03-30
[ 12 ]
Proposal on the studies under WRC-19 agenda item 9.1 issue 9.1.2 � China (People's Republic of) AI9.1 2016-03-29
[ 11 ]
Information and provisional work plan for WRC-19 agenda item 1.6 � China (People's Republic of) AI1.6 2016-03-29
[ 10 ]
Draft revision of Report ITU-R BO.2019 - Interference calculation methods � Japan 2016-03-24
[ 9 ]
Draft Note to the Director, Radiocommunication Bureau - Proposed modifications to Section B3, Part B of the Rules of Procedure in the application of RR No. 11.32A - Rules concerning calculation methodology for calculating the probability of harmful interference between space networks � Japan 2016-03-24
[ 8 ]
Application of coordination arc in the Ka band, to determine coordination requirements between FSS and other satellite services � HISPASAT, S.A. 2016-03-17
[ 7 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C AND 7D) - Working document towards a preliminary draft new Report ITU-R SM.[CHAR-UNWANTED] � WP 5D 2016-03-09
[ 6 ]
Liaison statement to Working Party 4A (copy for information to Working Parties 5A and 5C) - Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA] � WP 5D 2016-03-08
[ 5 ]
Liaison statement on deliverables of ITU-T Focus Group AC (Focus Group on Aviation applications of cloud computing for flight data monitoring) � ITU-T (TSAG) 2016-02-12
[ 4 ]
Liaison statement to ITU-R Study Groups 4 and 5 and ITU-T Study Groups 9 and 16 on Global Platform for the Broadcasting Service - Global Platform for the Broadcasting Service � WP 6B 140/6 2016-02-04
[ 3 ]
Liaison statement on new ITU-T SG 20 � ITU-T SG 20 2015-12-15
[ 2 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Question 7/5 � ITU-T SG 5 2015-12-08
[ 1 ]
Documents to be carried over from the 2012-2015 study period � WP 4A 2015-12-08
Results:915 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18