Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 460 ]
�
� |
Report on the recent activities of Wireless World Research Forum (WWRF)
�
� |
WWRF Liaison Rapporteur
� |
� |
2017-02-07 |
|
[ 459 ]
�
� |
Proposal on IMT-2020 channel model
�
� |
Beijing University of Posts and Telecommunications
,
China Mobile Communications Corporation
,
DaTang Telecommunication Technology & Industry Holding Co. Ltd
,
Electronics and Telecommunications Research Institute (ETRI)
,
Huawei Technologies Co. Ltd.
,
NTT DOCOMO, Inc.
,
Samsung Electronics Co., Ltd.
,
SoftBank Corporation
,
Spark NZ Limited,
,
ZTE Corporation
� |
� |
2017-02-07 |
|
[ 458 ]
�
� |
Example implementation of the methodology in draft new Recommendation ITU-R M.[IMT.MODEL]
�
� |
Intel Corporation
,
Nokia Corporation
,
Telefon AB - LM Ericsson
� |
� |
2017-02-07 |
|
[ 457 ]
�
� |
Response to Questionnaire
�
� |
Bahrain (Kingdom of)
� |
� |
2017-02-06 |
|
[ 456 ]
�
� |
Proposed modifications to working document toward preliminary draft new Report ITU-R M.[IMT-2020.EVAL]
�
� |
Canada
� |
� |
2017-02-06 |
|
[ 455 ]
�
� |
Proposed channel parameters based on results of propagation measurements for the development of channel model for IMT-2020 technology evaluation
�
� |
Canada
� |
Q229/5
� |
2017-02-07 |
|
[ 454 ]
�
� |
View on parameters related to the sharing studies between BSS(S) and IMT systems in 1 452-1 492 MHz under agenda item 9.1.2
�
� |
France
� |
� |
2017-02-06 |
|
[ 453 ]
�
� |
Proposals on modification of Recommendation ITU-R M.1036 with regard to the frequency arrangements
�
� |
France
� |
� |
2017-02-06 |
|
[ 452 ]
�
� |
Liaison statement to Working Party 7B (copied for information to Working Party 5A) - Technical characteristics for WRC-19 agenda item 1.3
�
� |
France
� |
� |
2017-02-06 |
|
[ 451 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES]
�
� |
France
� |
� |
2017-02-06 |
|
[ 450 ]
�
� |
Discussion on IMT-2020 transmitter parameters to be used in the adjacent band sharing studies
�
� |
France
� |
� |
2017-02-06 |
|
[ 449 ]
�
� |
New Annex for the new Report ITU-R M.[IMT.EXPERIENCES]
�
� |
Germany (Federal Republic of)
� |
� |
2017-02-06 |
|
[ 448 ]
�
� |
Coexistence between IMT in 3 300-300 MHz and radar systems in 3 100-3 300 MHz
�
� |
Cameroon (Republic of)
,
Egypt (Arab Republic of)
,
Kenya (Republic of)
,
Rwanda (Republic of)
,
South Africa (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2017-02-06 |
|
[ 447 ]
�
� |
Protection of systems in the radionavigation-satellite service
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-02-06 |
|
[ 446 ]
�
� |
Coexistence between IMT and radar systems in the 3 300-3 400 MHz
�
� |
Cameroon (Republic of)
,
Egypt (Arab Republic of)
,
Kenya (Republic of)
,
Rwanda (Republic of)
,
South Africa (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2017-02-06 |
|
[ 445 ]
�
� |
A national approach to terrestrial IMT deployment (LTE EMBMS) in the 1 800 MHz band, Iran experience
�
� |
Iran (Islamic Republic of)
� |
� |
2017-02-06 |
|
[ 444 ]
�
� |
Narrowband and broadband - Machine type communication by IMT
�
� |
United States of America
� |
� |
2017-02-06 |
|
[ 443 ]
�
� |
Proposed reply liaison statement from Working Party 5D to Working Party 4C and proposed updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]
�
� |
United States of America
� |
� |
2017-02-06 |
|
[ 442 ]
�
� |
Proposed modifications to the working document towards - Preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2020 radio interface(s)
�
� |
India (Republic of)
� |
� |
2017-02-06 |
|
[ 441 ]
�
(Rev.1)� |
Proposed modifications to the working document towards preliminary draft new Report ITU-R M.[IMT2020.EVAL] for the EMBB-Rural LMLC configuration
�
� |
India (Republic of)
� |
� |
2017-02-06 |
|
[ 440 ]
�
(Rev.1)� |
Spectrum needs for IMT under WRC-19 agenda item 1.13
�
� |
India (Republic of)
� |
� |
2017-02-06 |
|
[ 439 ]
�
� |
Usage of the 3 300-3 400 and 3 400-3 600 MHz band in Africa
�
� |
Cameroon (Republic of)
,
Egypt (Arab Republic of)
,
Kenya (Republic of)
,
Rwanda (Republic of)
,
South Africa (Republic of)
,
Zimbabwe (Republic of)
� |
� |
2017-02-06 |
|
[ 438 ]
�
� |
Remaining issues on ground reflection modelling for IMT-2020 channel model
�
� |
Samsung Electronics Co., Ltd.
� |
� |
2017-02-06 |
|
[ 437 ]
�
� |
Progression of the working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES] - National experiences with terrestrial International Mobile Telecommunication (IMT) Systems in UHF frequency bands around and below 1 GHz identified for IMT
�
� |
Canada
� |
Q229/5
� |
2017-02-03 |
|
[ 436 ]
�
� |
Progression of the working document towards a preliminary draft new Report ITU-R M.[IMT.BY.INDUSTRIES] - The use of the terrestrial component of International Mobile Telecommunication (IMT) by industry sectors
�
� |
Canada
� |
Q229/5
� |
2017-02-03 |
|
[ 435 ]
�
� |
Progression of the working document towards a draft revision of Report ITU-R M.2373-0 - Audio-visual capabilities and applications supported by terrestrial IMT systems
�
� |
Canada
� |
� |
2017-02-03 |
|
[ 434 ]
�
� |
Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
EMEA Satellite Operator's Association (ESOA)
� |
� |
2017-02-05 |
|
[ 433 ]
�
� |
Definition of bandwidth for IMT-2020
�
� |
New Zealand
� |
� |
2017-02-06 |
|
[ 432 ]
�
� |
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 3 400-3 700 MHz
�
� |
Australia
,
Canada
,
New Zealand
,
United States of America
� |
� |
2017-02-06 |
|
[ 431 ]
�
� |
Progression of the working document towards a prelimininary draft revision of Recommendation ITU-R M.1036-5 - Frequency arrangements for implementations (IMT) in the bands identified for IMT in the Radio Regulations (RR)
�
� |
Canada
� |
� |
2017-02-03 |
|
[ 430 ]
�
� |
Update Report on CITEL PCC.II activities
�
� |
CITEL Rapporteur
� |
229/5
� |
2017-02-02 |
|
[ 429 ]
�
� |
Updated material on LTE-Advanced toward Revision 3 of Recommendation ITU-R M.2012
�
� |
Alliance for Telecommunications Industry Solutions
� |
� |
2017-02-01 |
|
[ 428 ]
�
� |
Update proposals to the preliminary draft new Report ITU-R M.[IMT-2020. TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2020 radio interface(s)
�
� |
Germany (Federal Republic of)
� |
� |
2017-01-31 |
|
[ 427 ]
�
� |
Reply liaison statement to ITU-R Working Party 5D on characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz
�
� |
Director, BR
� |
� |
2017-01-31 |
|
[ 426 ]
�
� |
Liaison statement to ITU-D Study Group 1 Question 2/1 on broadband definition (copy to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D and 6A for information) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?
�
� |
CCV and SCV
� |
� |
2017-01-30 |
|
[ 425 ]
�
� |
Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect ot systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-01-27 |
|
[ 424 ]
�
� |
Response to Questions on spectrum needs for IMT under WRC-19 agenda item 1.13
�
� |
Singapore (Republic of)
� |
� |
2017-01-19 |
|
[ 423 ]
�
� |
Answer to Questions on spectrum needs for IMT under WRC-19 agenda item 1.13
�
� |
Egypt (Arab Republic of)
� |
� |
2017-01-11 |
|
[ 422 ]
�
� |
Liaison statement on the completion of ITU-T Focus Group on IMT-2020 and start of normative work in ITU-T Study Group 13
�
� |
ITU-T FG IMT -2020
� |
� |
2017-01-10 |
|
[ 421 ]
�
� |
Liaison statement on finalization of the revision of Recommendations ITU-R M.2070 and ITU-R M.2071 and studies on protection RNSS operation from unwanted emissions of IMT stations
�
� |
Director, BR
� |
� |
2016-12-19 |
|
[ 420 ]
�
� |
Reply liaison statement to Working Party 5D - AMS parameters and work progress on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz
�
� |
WP 5B
� |
� |
2016-12-16 |
|
[ 419 ]
�
� |
Liaison statement to Working Party 5D - Update to characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency range 3 100-3 700 MHz
�
� |
WP 5B
� |
� |
2016-12-16 |
|
[ 418 ]
�
� |
Response liaison statement to ITU-R WP 5A on request for information on machine type communications (MTC) in the land mobile service
�
� |
Director, BR
� |
� |
2016-12-15 |
|
[ 417 ]
�
� |
Liaison statement to ICAO (copied for information to ITU-R Working Party 5D) - Questions about the systems to be used, and the spectrum requirements, of GADSS
�
� |
WP 5B
� |
� |
2016-12-16 |
|
[ 416 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...
�
� |
WP 1B
� |
� |
2016-12-14 |
|
[ 415 ]
�
� |
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group oN WDTC Resolution 9 and ITU-D Study Group 1 for information)
�
� |
WP 1B
� |
� |
2016-12-14 |
|
[ 414 ]
�
� |
Reply liaison statement to Working Party 5D - Work on WRC-19 agenda item 9.1, issue 9.1.8, and information on anticipated draft CPM text deadlines by contributing Groups for WRC-19 agenda item / issues where Working Party 5D is the responsible Group
�
� |
WP 1B
� |
� |
2016-12-14 |
|
[ 413 ]
�
� |
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 412 ]
�
� |
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)
�
� |
WP 1A
� |
� |
2016-12-13 |
|
[ 411 ]
�
� |
Liaison statement to External Organizations (copy for information to Working Party 5D) - Request for Information on Machine Type Communications (MTC) in the land mobile service
�
� |
WP 5A
� |
� |
2016-11-29 |
Resultados :1310 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):