International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� C�

ITU-T�SG 5

Environment, climate change and circular economy

Study Period 2017

Results:902 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 52 ]
Proposed initial text for L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities) � Korea (Rep. of) Q8/5 2017-05-02
[ 51 ]
(Rev.1)
New work item proposal on smart energy solution for for telecom base station � Ministry of Industry and Information Technology (MIIT), China Q6/5 2017-05-02
[ 50 ]
Proposed text for clause 6 in L.CC Risk (Framework of climate change risk assessment for telecommunication and electrical facilities) � Korea (Rep. of) Q8/5 2017-05-02
[ 49 ]
(Rev.1)
New work item proposal on smart energy solution for data centre and telecom centre � Ministry of Industry and Information Technology (MIIT), China , China Unicom Q6/5 2017-05-02
[ 48 ]
Proposal for changing a Figure in Annex III of K.100 � Korea (Rep. of) Q3/5 2017-05-02
[ 47 ]
Proposal for adding a scientific paper in bibliography of K.100 � Korea (Rep. of) Q3/5 2017-05-02
[ 46 ]
(Rev.1)
Proposed content for draft ITU-T k.Bprac � GSMA Q3/5 2017-05-01
[ 45 ]
Proposal for addition of explanatory note to tables in K.70, Annex C � GSMA Q3/5 2017-05-01
[ 44 ]
The second draft of K.psp "Protection of small-size telecommunication installations with poor earthing conditions" � China Unicom Q1/5 2017-05-01
[ 43 ]
Study and proposal for the drafting of a new recommendation K.xxx - EMF issues arise from RBS site with joint construction and shared physical infrastructure. � China Telecommunications Corporation Q3/5 2017-04-30
[ 42 ]
The 1st draft of the new ITU-T Recommendation K.ipe "Electromagnetic compatibility requirements for Information Perception Equipments". � China Telecommunications Corporation Q4/5 2017-04-30
[ 41 ]
Recommendations for use to reduce exposure to electromagnetic waves. � Universidad Nacional de R�o Cuarto Q3/5 2017-04-29
[ 40 ]
(Rev.1)
Review of K.20, K.21, K.44 and K.45 - Part 1 K.20, K.21 and K.45 Test tables columns 1 through 3 � Bourns Limited Q2/5 2017-04-29
[ 39 ]
mKRISHI Fisheries': Mobile Application on using ICT in adapting to climate change effects in the fisheries sector � Egypt Q8/5 2017-04-29
[ 38 ]
Best Practices of the use of mobile devices for exposure reduction � ORANGE POLSKA S.A. Q3/5 2017-04-28
[ 37 ]
(Rev.1)
The second draft introduction for the ITU-T L.GAL2 - Interface for power management in NFV environments "Green Abstraction Layer 2" � Consorzio Nazionale Interuniversitario per le Telecomunicazioni , Orange Q6/5 2017-04-28
[ 36 ]
(Rev.1)
A.1 justification for proposed draft new Recommendation L.SIBNode � Secretar�a de Estado para la Sociedad de la Informaci�n y la Agenda Digital, Spain Q9/5 2017-04-28
[ 35 ]
Sustainable and intelligent building services � Secretar�a de Estado para la Sociedad de la Informaci�n y la Agenda Digital, Spain Q9/5 2017-04-28
[ 34 ]
(Rev.1)
Document with information relevant to new Recommendation ITU-T K.BPrac � Orange , ORANGE POLSKA S.A. Q3/5 2017-04-28
[ 33 ]
(Rev.1)
Proposal of the revision of ITU-T Recommendation K.91 (05/2012) "Guidance for assessment, evaluation and monitoring of human exposure to radio frequency electromagnetic fields" � ORANGE POLSKA S.A. Q3/5 2017-04-28
[ 32 ]
(Rev.1)
Proposed change on flowchart for K.44 to select resistibility level of equipment in customer premises being discussed � Nippon Telegraph and Telephone Corporation (NTT) Q2/5 2017-04-28
[ 31 ]
(Rev.1-2)
Proposal of first draft "Supplement to K_soft_des Soft error measures for FPGA" � Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation Q5/5 2017-04-28
[ 30 ]
(Rev.1)
Proposal for discussion on draft Recommendation L.net_infra_assessment � Huawei Technologies Co., Ltd. Q6/5 2017-04-28
[ 29 ]
(Rev.1)
Impact assessment for energy services on multiple microgrids, new proposal study � Huawei Technologies Co., Ltd. Q9/5 2017-04-28
[ 28 ]
(Rev.1)
Some useful information for K.psp. � China Telecommunications Corporation Q1/5 2017-04-28
[ 27 ]
(Rev.1)
Draft of K.rcd "Technical requirements for residual current operated protective devices with automatic-reclosing devices for telecom uses". � China Telecommunications Corporation Q2/5 2017-04-28
[ 26 ]
(Rev.1)
The 3rd draft of K.vss "Lightning protection and Earthing of Video Surveillance System". � China Telecommunications Corporation Q1/5 2017-04-28
[ 25 ]
Proposal on new recommendation L. dualpowerinput � China Unicom Q6/5 2017-04-28
[ 24 ]
(Rev.1)
Proposal for ITU-T SG5 Q3 work program priority - new study period � Telstra Corporation Ltd. , Vodafone Group Services Ltd Q3/5 2017-04-28
[ 23 ]
Proposed modifications for K.52 related to new class "perfectly compliant" and body SAR for mobile handsets or devices. � National Institute of Information and Communications Technology (NICT) Mr Naito Hideyuki , NTT DOCOMO, INC. Q3/5 2017-04-27
[ 22 ]
Proposed study on safety of bridging by SPD between primary and external circuit � Nippon Telegraph and Telephone Corporation (NTT) Q2/5 2017-04-27
[ 21 ]
The second draft of K.light "EMC requirements of disturbances from lighting equipment located in the telecommunication equipment room" � Nippon Telegraph and Telephone Corporation (NTT) Q4/5 2017-04-27
[ 20 ]
Measurement method of transient currents at mains ports in K.light � Nippon Telegraph and Telephone Corporation (NTT) Q4/5 2017-04-27
[ 19 ]
The 3rd draft of Recommendation K.appl4: Surge Protective Component Application Guide - Lightning Isolation Transformers � Nippon Telegraph and Telephone Corporation (NTT) Q2/5 2017-04-27
[ 18 ]
(Rev.1)
Proposal of second draft of K.soft_mes "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests" � Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation Q5/5 2017-04-26
[ 17 ]
(Rev.1)
Proposal of third draft of K.soft_test "Soft error test method for telecommunication equipment" � Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation Q5/5 2017-04-26
[ 16 ]
(Rev.1)
Proposal of third draft of K.soft_des "Design methodologies for telecommunication systems applying soft error measures" � Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation Q5/5 2017-04-26
[ 15 ]
Human exposure to electromagnetic fields (EMFs) from information and communication technologies (ICTs) � Minist�re des Postes, Telecommunications et des Nouvelles Technologies de l'Information et de la Communication Q3/5 2017-04-24
[ 14 ]
Proposed 4th draft new Recommendation K.prox "Immunity requirements for telecommunication equipment in close proximity use of wireless devices" � Nippon Telegraph and Telephone Corporation (NTT) Q4/5 2017-04-20
[ 13 ]
Definitions for AC supply configurations � Bourns Limited Q2/5 2017-04-15
[ 12 ]
Updating K.20/K.21/K.45 2.1.5 and 2.1.6 test comments for C.002 six output 8/20 generator � Bourns Limited Q2/5 2017-04-14
[ 11 ]
Proposed Corrigendum to ITU-T K.56 � Fundacao CPqD - Centro de Pesquisa e Desenvolvimento em Telecomunicacoes Q1/5 2017-04-13
[ 10 ]
Draft K.appl4 - High frequency signal isolation transformers version � Bourns Limited Q2/5 2017-03-31
[ 9 ]
Withdrawn � N/A � 2017-03-30
[ 8 ]
(Rev.1)
ITU K.20 Ethernet test level � Littelfuse UK Ltd. Q4/5, Q2/5 2017-03-28
[ 7 ]
(Rev.1)
ITU K.44 Figure A.6.7-5 figure edit � Littelfuse UK Ltd. Q4/5, Q2/5 2017-03-28
[ 6 ]
(Rev.1)
ITU K.51 Edits � Littelfuse UK Ltd. Q4/5, Q2/5 2017-03-22
[ 5 ]
(Rev.1)
Revision proposals for K.99 � EPCOS AG Q2/5 2017-03-20
[ 4 ]
(Rev.1)
K.50 editorial changes and correct definitions use � Littelfuse UK Ltd. Q4/5, Q2/5 2017-03-10
[ 3 ]
(Rev.1-2)
Collection and recycling of end-of-life electronic communication terminals � Minist�re des Postes et T�l�communications Q7/5 2017-03-06
Results:902 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2022-01-20