Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 61 ]
�
� |
FSS protection criteria for adjacent band compatibility studies for WRC-23 agenda items 1.2 and 1.3
�
� |
GSMA
� |
AI1.3, AI1.2
� |
2020-10-21 |
|
[ 60 ]
�
� |
Proposed draft Resolution for agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2020-10-21 |
|
[ 59 ]
�
� |
Proposed working document for sharing and compatibility studies of FSS systems in response to WRC-23 agenda item 1.19
�
� |
China (People's Republic of)
� |
AI1.19
� |
2020-10-21 |
|
[ 58 ]
�
� |
Proposals on WRC23 agenda item 1.2 - FSS parameters and protection criteria
�
� |
China (People's Republic of)
� |
AI1.2
� |
2020-10-21 |
|
[ 57 ]
�
� |
Comments on working document towards a preliminary draft new Report - Tolerances for certain orbital characteristics of non-GSO space stations in the FSS, BSS, and [MSS]
�
� |
China (People's Republic of)
� |
AI7
� |
2020-10-21 |
|
[ 56 ]
�
� |
Proposed modifications to the working document on studies under WRC-23 agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2020-10-21 |
|
[ 55 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R M.[FSS_ES_IMT_26GHZ] - Methods to assist administrations to mitigate interference from GSO FSS earth stations into IMT stations operating in the frequency bands 24.65-25.25 GHz
and 27-27.5 GHz
�
� |
France
� |
� |
2020-10-21 |
|
[ 54 ]
�
� |
Agenda item 1.17 compatibility study between Earth station operating in the FSS in GSO networks and other GSO networks
�
� |
France
� |
� |
2020-10-21 |
|
[ 53 ]
�
� |
Resolution 769 - Supplemental links
�
� |
France
� |
� |
2020-10-21 |
|
[ 52 ]
�
� |
Resolution 769 (WRC-19)
�
� |
France
� |
AI7
� |
2020-10-21 |
|
[ 51 ]
�
� |
Characteristics for Earth stations in motion communicating with non-GSO satellites to be used in sharing studies
�
� |
Canada
� |
AI1.16
� |
2020-10-21 |
|
[ 50 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1503-3
�
� |
Canada
� |
� |
2020-10-21 |
|
[ 49 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[AGGREGATE NGSO-GSO INTERFERENCE] - Study of methodologies for the evaluation of aggregate interference caused by all non-GSO FSS systems into GSO FSS, MSS and BSS networks in the 50/40 GHz bands
�
� |
Canada
� |
� |
2020-10-21 |
|
[ 48 ]
�
� |
Working document towards a preliminary draft revision of Recommendation ITU-R S.1526-1 - Methodology to assess the change in interference environment in relation to Nos. 9.12, 9.12A and 9.13 of the Radio Regulations when the characteristics of non-geostationary-satellite orbit fixed-satellite service systems are modified
�
� |
Canada
� |
� |
2020-10-21 |
|
[ 47 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R S.[INTERFERENCE -NGSO] - Calculation method to assess the level of interference caused by or to assignments to non-GSO FSS satellites
�
� |
Canada
� |
� |
2020-10-21 |
|
[ 46 ]
�
� |
Tolerances for certain orbital characteristics of non-GSO space stations in the FSS, BSS and [MSS] - Proposed approach to derive the tolerance for the inclination
�
� |
Canada
� |
AI7
� |
2020-10-21 |
|
[ 45 ]
�
� |
Proposed new topic under WRC-23 agenda item 7 - Modifications to Appendix 1 to Annex 4 of Appendix 30B3
�
� |
Canada
� |
AI7
� |
2020-10-21 |
|
[ 44 ]
�
� |
New working document towards a preliminary draft new Report for studies related to agenda item 1.16
�
� |
Canada
� |
AI1.16
� |
2020-10-21 |
|
[ 43 ]
�
� |
Comments on fixed satellite service technical and operational characteristics and protection criteria for studies under WRC-23 agenda item 1.2
�
� |
United States of America
� |
AI1.2
� |
2020-10-21 |
|
[ 42 ]
�
� |
Draft liaison statement Working Party 4A to Working Party 5D - Transmission characteristics of GSO SDARS and non-GSO MSS feeder links operating in the fixed satellite service allocation in the band 6 700-7 125 MHz
�
� |
United States of America
� |
AI1.2
� |
2020-10-21 |
|
[ 41 ]
�
� |
Characteristics of and protection criteria for mobile-satellite service feeder links in the fixed satellite service in the 6 425-6 575 MHz frequency band
�
� |
United States of America
� |
AI1.2
� |
2020-10-21 |
|
[ 40 ]
�
� |
Methodology for examining conformity of aeronautical Earth Stations In Motion (ESIM) with respect to PFD limits in the 27.5-29.5 GHz band
�
� |
United States of America
� |
AI1.5
� |
2020-10-21 |
|
[ 39 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[FSS 17.3-17.7 GHZ] for compatibility studies in the frequency bands 17.3-17.7 GHz (space-to-Earth) to consider a primary allocation, while ensuring protection of incumbent services
�
� |
United States of America
� |
AI1.19
� |
2020-10-21 |
|
[ 38 ]
�
� |
Working document toward a preliminary draft new Report on use of the band 7 025-7 075 MHz for uplink feeder links to satellite digital audio radio service (SDARS) networks
�
� |
United States of America
� |
� |
2020-10-21 |
|
[ 37 ]
�
� |
Proposal of draft reply liaison statement to Working Party 5D regarding agenda item 1.4
�
� |
Brazil (Federative Republic of)
� |
AI1.4
� |
2020-10-20 |
|
[ 36 ]
�
� |
Methodology and suggestions for Revision to Recommendation ITU-R S.1503-3
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2020-10-20 |
|
[ 35 ]
�
� |
Modifications to working document towards a preliminary draft new Report
�
� |
Russian Federation
� |
AI7
� |
2020-10-20 |
|
[ 34 ]
�
� |
Proposal for reply liaison statement to Working Party 5D on WRC-23 agenda item 1.2
�
� |
Russian Federation
� |
AI1.2
� |
2020-10-20 |
|
[ 33 ]
�
� |
Fixed-satellite service /technical and operational characteristics and protection criteria for studies under WRC-23 agenda item 1.2
�
� |
Russian Federation
� |
AI1/2
� |
2020-10-20 |
|
[ 32 ]
�
� |
Proposal of the methodology to examine the characteristics of aeronautical ESIM in conformity with PFD limits
�
� |
Japan
� |
� |
2020-10-19 |
|
[ 31 ]
�
� |
Proposal for WRC-23 agenda item 1.17 - Consideration on protection of GSO BSS against the Inter satellite link from GSO FSS to NGSO FSS in the band 11.7-12.7 GHz
�
� |
Japan
,
Korea (Republic of)
� |
AI1.17
� |
2020-10-19 |
|
[ 30 ]
�
� |
Proposal for WRC-23 agenda item 7 - Modification of RR AP30A for the BSS feeder link plan in the bands 17.3-18.1 GHz and 14.5-14.8 GHz in Regions 1 and 3
�
� |
Japan
� |
AI7
� |
2020-10-19 |
|
[ 29 ]
�
� |
Working document toward a preliminary draft new Report ITU-R BO.[BSS SHARING CRITERIA] - Characteristics and applicability of frequency sharing criteria for broadcasting satellite service subject to Appendix 30
�
� |
Japan
� |
Q283/4
� |
2020-10-19 |
|
[ 28 ]
�
� |
Proposed topic to be considered under WRC-23 agenda item 7 - Use of a space station to bring frequency assignments to geostationary-satellite networks at different orbital locations into use
�
� |
Korea (Republic of)
� |
AI7
� |
2020-10-16 |
|
[ 27 ]
�
� |
Proposed topic to be considered under WRC-23 agenda item 7 - To make information under Nos. 9.51 or 9.52 with respect to requests for coordination under Nos. 9.7 to 9.7B available
�
� |
Korea (Republic of)
� |
AI7
� |
2020-10-16 |
|
[ 26 ]
�
� |
Consideration for examining the characteristics of aeronautical ESIM complying with the power flux density limits on the Earth's surface specified in Part II of Annex 3 to the Resolution 169 (WRC-19)
�
� |
Korea (Republic of)
� |
AI1.5
� |
2020-10-16 |
|
[ 25 ]
�
� |
Proposal for elevation of preliminary draft new Report ITU-R S.[ESIM-MS]
�
� |
Korea (Republic of)
� |
� |
2020-10-16 |
|
[ 24 ]
�
� |
Reply liaison statement to Working Party 5B - Technical and operational characteristics and protection of the Fixed Satellite Service
�
� |
United States of America
� |
AI1.8
� |
2020-10-16 |
|
[ 23 ]
�
� |
Working documents towards a preliminary draft new Report ITU-R S.[SCALING FACTOR]
�
� |
United States of America
� |
� |
2020-10-16 |
|
[ 22 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[AGGREGATE NGSO-GSO INTERFERENCE] - Study of methodologies to compute the aggregate non-GSO interference into GSO FSS networks, considering the potential impact of mitigation techniques and sharing methodologies between non-GSO FSS systems
�
� |
United States of America
� |
� |
2020-10-16 |
|
[ 21 ]
�
� |
Proposed updates to Recommendation ITU-R S.1526-1
�
� |
United States of America
� |
� |
2020-10-16 |
|
[ 20 ]
�
� |
Proposed updates to working document towards a preliminary draft revision of Recommendation ITU-R S.1503-3
�
� |
United States of America
� |
� |
2020-10-16 |
|
[ 19 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[NGSO_FSS_ESIMS] for sharing and compatibility studies in the frequency bands 17.7-18.6 GHz and 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space) by NGSO FSS Earth stations in motion while ensuring protection of incumbent services
�
� |
United States of America
� |
AI1.16
� |
2020-10-16 |
|
[ 18 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[SATELLITE-TO-SATELLITE] technical feasibility of satellite-to-satellite links in 11.7-12.7 GHz, 18.1-18.6 GHz, 18.8-20.2 GHz and 27.5-30 GHz
�
� |
United States of America
� |
AI1.17
� |
2020-10-16 |
|
[ 17 ]
�
� |
Working document toward a potential new issue for WRC-23 agenda item 7 - Issues with Resolution 85 (WRC-03)
�
� |
United States of America
� |
AI7
� |
2020-10-16 |
|
[ 16 ]
�
� |
Working document toward a potential new issue for WRC-23 agenda item 7 - Streamlining submission of Resolution 49 date
�
� |
United States of America
� |
AI7
� |
2020-10-16 |
|
[ 15 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[NGSO FEEDER LINK.PROT]
�
� |
United States of America
� |
AI1.17
� |
2020-10-16 |
|
[ 14 ]
�
� |
Contribution to Working Party 4A on agenda item 1.15
�
� |
Iran (Islamic Republic of)
� |
AI1.15
� |
2020-09-21 |
|
[ 13 ]
�
� |
Contribution to Working Party 4A on agenda item 1.16
�
� |
Iran (Islamic Republic of)
� |
AI1.16
� |
2020-09-21 |
|
[ 12 ]
�
� |
Methodology to examine conformity of aeronautical ESIM communicating with GSO FSS with pfd limits
�
� |
Canada
� |
� |
2020-05-21 |
Results:911 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):