Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 65 ]
�
� |
Liaison statement to ITU-R Working Parties 3M, 4A, 4C, 5A, 5D, 7B, 7C and 7D (for information to Task Group 5/1) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
AI1.14
� |
2016-05-20 |
|
[ 64 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5C and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5B
� |
AI1.7
� |
2016-05-20 |
|
[ 63 ]
�
+Ann.1-37� |
Report on the meeting of Working Party 4A (Geneva, 13-22 April 2016)
�
� |
Chairman, WP 4A
� |
� |
2016-04-22 |
|
[ 62 ]
�
� |
Final list of participants - Working Party 4A (Geneva, 13-22 April 2016)
�
� |
Director, BR
� |
� |
2016-04-22 |
|
[ 61 ]
�
� |
List of documents issued (Documents 4A/1 - 4A/61)
�
� |
BR Study Groups Department
� |
� |
2016-04-12 |
|
[ 60 ]
�
� |
Liaison statement to WP 5C concerning WRC-19 agenda item 1.14 - (Copy to WP 4A, WP 4C, WP 5A, WP 5D, WP 7D, WP 3M for information)
�
� |
WP 7B
� |
AI1.14
� |
2016-04-12 |
|
[ 59 ]
�
� |
Liaison statement to Working Party 5A (Working Parties 4A, 4C, 5B and 5C copied for information) - Information pertaining to EESS (active) in the 5 GHz range to be considered under WRC-19 agenda item 1.16
�
� |
WP 7C
� |
I1.16
� |
2016-04-11 |
|
[ 58 ]
�
� |
Liaison statement to Working Party 4A (Copy to Working Parties 4B, 5A, 5B, 5C, 5D, 6A, 7D and 3M) - WRC-19 agenda items 1.5 and 1.6
�
� |
WP 7C
� |
AI1.6
� |
2016-04-11 |
|
[ 57 ]
�
� |
Liaison statement to Working Party 4A (Copy to Working Parties 4B, 5A, 5C, 5D, 7D, and 3M - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
WP 7C
� |
AI9.1
� |
2016-04-11 |
|
[ 56 ]
�
� |
Liaison statement to Working Party 5C for WRC-19 agenda item 1.14 sharing studies (Copy to Working Parties 4A, 4C, 5A, 5D, 7D, 3M)
�
� |
WP 7C
� |
AI1.14
� |
2016-04-11 |
|
[ 55 ]
�
� |
Implementation of WRC-15 decision on the application of No. 9.19 of the Radio Regulations
�
� |
Director, BR
� |
� |
2016-04-11 |
|
[ 54 ]
�
� |
Liaison statement to Working Parties 3K and 3M (for action) and Study Group 5 and Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A and 7C (for information)
�
� |
WP 7D
� |
� |
2016-04-11 |
|
[ 53 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C and 6A concerning WRC-19 agenda item 1.7 (copy for information to Working Parties 1A, 3M and 4B) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.7
� |
2016-04-07 |
|
[ 52 ]
�
� |
Excessive notified characteristics of recorded frequency assignments of GSO satellite networks
�
� |
Director, BR
� |
� |
2016-04-07 |
|
[ 51 ]
�
� |
Treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth
�
� |
Director, BR
� |
� |
2016-04-07 |
|
[ 50 ]
�
� |
Discrepancy and/or inconsistency between the regulatory provisions dealing with any changes to the characteristics of an assignment
�
� |
Iran (Islamic Republic of)
� |
� |
2016-04-06 |
|
[ 49 ]
�
� |
Difficulties that may be encountered when applying Recommendation ITU-R S.1503-2 and a proposed work plan for its possible revision - Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of Radio Regulations
�
� |
Canada
� |
� |
2016-04-06 |
|
[ 48 ]
�
� |
Use of linear polarization for Article 4 networks in Region 2
�
� |
Director, BR
� |
� |
2016-04-06 |
|
[ 47 ]
�
� |
WRC-19 - Agenda item 9.1 - Issue 9.1.9
�
� |
France
� |
AI9.1
� |
2016-04-06 |
|
[ 46 ]
�
� |
Protection criterion for BSS receivers in the 1 452-1 492 MHz band
�
� |
France
� |
� |
2016-04-06 |
|
[ 45 ]
�
� |
Considerations on Recommendation ITU-R S.1503-2
�
� |
France
� |
� |
2016-04-06 |
|
[ 44 ]
�
� |
Aspects of Table 1 in Annex 7 to Appendix 30
�
� |
Sweden
� |
� |
2016-04-06 |
|
[ 43 ]
�
� |
Typical GSO FSS and MSS characteristics for use in studies in preparation to WRC-19
�
� |
Inmarsat Plc.
� |
� |
2016-04-06 |
|
[ 42 ]
�
� |
Use of the frequency bands 17.7-19.7 GHz and 27.5-29.5 GHz by earth station in motion communicating with geostationary space stations in the fixed-satellite service
�
� |
Inmarsat Plc.
� |
� |
2016-04-06 |
|
[ 41 ]
�
� |
Working document towards a preliminary draft new Recommendation ITU-R SF.[INTERF.AREA] - A methodology for providing compatibility between ubiquitously deployed earth stations of the fixed-satellite service and stations of the fixed and/or mobile services in adjacent areas for the cases described in the Tables of Appendix 7 of the Radio Regulations
�
� |
United States of America
� |
� |
2016-04-05 |
|
[ 40 ]
�
� |
Publication of information under Nos. 1141 and 11.41A of the Radio Regulations and coordination requirements established using Appendix 8 Case I and Case II
�
� |
Director, BR
� |
� |
2016-04-05 |
|
[ 39 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[GUIDELINES_14.5-14.8GHZ] - Guidelines to conduct explicit bilateral agreements, in the frequency band 14.5-14.75 GHz, for Region 1 and 2 countries, or in the frequency band 14.5-14.8 GHz, for Region 3 countries, in the fixed-satellite service (Earth-to-space) not for feeder links for the broadcasting-satellite service, in order...
�
� |
Luxembourg
� |
� |
2016-04-05 |
|
[ 38 ]
�
� |
Preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions
�
� |
Luxembourg
� |
� |
2016-04-05 |
|
[ 37 ]
�
� |
Work plan for WRC-19 agenda item 1.4
�
� |
Luxembourg
� |
AI1.4
� |
2016-04-05 |
|
[ 36 ]
�
� |
WRC-19 agenda item 1.13, 1.6 and 1.14 - Characteristics of FSS GSO systems to be taken into account in compatibility studies with IMT Systems, HAPS and NGSO Systems in the frequency bands 37 500-42 500 MHz (s-E), 42 500-51 500 MHz (E-s)
�
� |
United Arab Emirates
� |
AI1.14, AI1.13
� |
2016-04-05 |
|
[ 35 ]
�
� |
Studies on compatibility of International Mobile Telecommunications and broadcasting-satellite service (sound)
�
� |
Papua New Guinea
� |
� |
2016-04-05 |
|
[ 34 ]
�
� |
Modification (characteristics reduction) of a recorded assignment under RR Appendices 30 and 30A Regions 1 & 3 List - Agenda item 7
�
� |
Israel (State of)
� |
AI7
� |
2016-04-05 |
|
[ 33 ]
�
� |
Preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UA] - Technical and operational characteristics of Unmanned Aircraft Control and Non-Payload satellite communication links operated in certain frequency bands allocated to the fixed-satellite service not subject to RR Appendices 30, 30A and 30B
�
� |
Germany (Federal Republic of)
,
United States of America
� |
� |
2016-04-04 |
|
[ 32 ]
�
� |
Proposed liaison statement to Task Group (TG) 5/1 - Protection requirements for the ISS and FSS relevant to considerations under WRC-19 agenda item 1.13
�
� |
Australia
� |
AI1.13
� |
2016-04-04 |
|
[ 31 ]
�
� |
Proposal for a draft new Report - Uplink interference management associated with closely separated GSO FSS VSTA networks in the 27.5-29.5 GHz frequency band
�
� |
Australia
� |
� |
2016-04-04 |
|
[ 30 ]
�
� |
Working document toward a preliminary draft new Recommendation on a methodology to estimate the interference from land-based Earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed-satellite service into fixed service stations operating in the 27.5-29.5 GHz frequency band
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 29 ]
�
� |
Proposed working document towards a preliminary draft new Recommendation on technical and regulatory provisions for 50/40 GHz GSO/Non-GSO sharing - WRC-19 agenda item 1.6
�
� |
United States of America
� |
AI1.6
� |
2016-04-01 |
|
[ 28 ]
�
� |
Proposed liaison statement to Working Parties 5A, 5B and 5C regarding WRC-19 agenda item 9.1, issue 9.1.3
�
� |
United States of America
� |
AI9.1
� |
2016-04-01 |
|
[ 27 ]
�
� |
Working document toward a draft new Report ITU-R S.[ESIM] - Operation of Earth Stations In Motion (ESIM) in fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 26 ]
�
� |
Proposed modifications to preliminary draft new Report ITU-R S.[FSS/BSS] - Review of the inter-regional sharing provisions contained in Annex 7 to RR Appendix 30
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 25 ]
�
� |
Comments on work of Working Party 4A regarding the outcomes of WRC-15 agenda item 1.5, UAS-FSS - Coordination of activities within ITU-R and ICAO in response to ITU-R Resolution 155 (WRC-15) regarding the use of FSS bands by UAS
�
� |
United States of America
� |
AI1.5
� |
2016-04-01 |
|
[ 24 ]
�
� |
Working document regarding use of the frequency bands 17.7-19.7 GHz (space-to-Earth) and 27.5-29.5 GHz (Earth-to-space) by Earth stations in motion communicating with geostationary space stations in the fixed-satellite service
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 23 ]
�
� |
Draft revision of Report ITU-R S.2223: Technical and operational requirements for GSO FSS Earth stations on mobile platforms in bands from 17.3 to 30.0 GHz
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 22 ]
�
� |
Proposed working document towards a preliminary draft new Recommendation on technical and regulatory provisions for 6/4 GHz GSO/Non-GSO FSS sharing
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 21 ]
�
� |
Working document toward a preliminary draft new Report on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 20 ]
�
� |
Working document towards preliminary draft CPM text for WRC-19 agenda item 7 - Issue [A]: Factors related to the bringing into use of frequency assignments of non-GSO systems subject to coordination
�
� |
United States of America
� |
AI7
� |
2016-04-01 |
|
[ 19 ]
�
� |
Working document towards a text for the draft Conference Preparatory Meeting (CPM) Report - Regulatory provisions for new non-geostationary systems operating in the 6 725-7 025 MHz fixed-satellite service allocation
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 18 ]
�
� |
Working document for the compilation of technical characteristics of FSS and ISS systems in the 38-39.5 GHz, 24.45-24.75 GHz, 24.75-25.25 GHz and 27-27.5 GHz bands
�
� |
United States of America
� |
� |
2016-04-01 |
|
[ 17 ]
�
� |
Working document for the compilation of technical characteristics of FSS, BSS and ISS in the range 24.25-86 GHz for use in sharing and compatibility studies under resolves to invite ITU-R 2 of Resolution 238 (WRC-15) for WRC-19 agenda item 1.13
�
� |
United States of America
� |
AI1.13
� |
2016-04-01 |
|
[ 16 ]
�
� |
BSS receiving antennas measurement data
�
� |
Bulgaria (Republic of)
� |
293/4
� |
2016-04-01 |
Results:915 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):