Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 45 ]
�
� |
Studies related to Agenda item 1.18 on automotive applications in the 77.5-78.0 GHz frequency band
�
� |
France
� |
� |
2012-05-15 |
|
[ 44 ]
�
� |
Draft Liaison statement to Working Party 7C - WRC-15 Agenda item 1.12 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency bands 8 700-9 300 MHz and 9 900-10 500 MHz
�
� |
France
� |
� |
2012-05-15 |
|
[ 43 ]
�
� |
Update of preliminary draft new Recommendation - Operational and technical characteristics of radio altimeters utilizing the band 4 200-4 400 MHz
�
� |
United States of America
� |
� |
2012-05-14 |
|
[ 42 ]
�
� |
Liaison statement to ITU-R Working Parties 5B and 7C - Proposed changes to Recommendations ITU-R M.824-3 and ITU-R M.1176 and WRC-15 Agenda item 1.12 and Resolution COM 6/18 - Use of the frequency range 9 200-9 500 MHz for maritime radionavigation
�
� |
International Maritime Organization
� |
� |
2012-05-14 |
|
[ 41 ]
�
� |
Liaison statement to ITU-R Working Party 5B - Work plan adopted for revision of Recommendation ITU-R M.493-13 - Digital selective-calling system for use in the maritime mobile service
�
� |
International Maritime Organization
� |
� |
2012-05-14 |
|
[ 40 ]
�
� |
Liaison statement to ITU-R Working Party 5B regarding Recommendation ITU-R M.493-13
�
� |
International Maritime Organization
� |
� |
2012-05-14 |
|
[ 39 ]
�
� |
Method of the aggregate e.i.r.p. value assessment from the LTE user equipment operating simultaneously with the notified base station
�
� |
Ukraine
� |
� |
2012-05-14 |
|
[ 38 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[WAIC_CHAR_SPEC] -
Characteristics of WAIC systems and bandwidth requirements to support their safe operation
�
� |
Germany (Federal Republic of)
� |
� |
2012-05-14 |
|
[ 37 ]
�
� |
Proposed draft liaison statement to - JTG 4-5-6-7 on WRC-15 Agenda item 1.1
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 36 ]
�
� |
Working document towards a preliminary draft new Report - Analysis of the aeronautical mobile (route), aeronautical mobile, and aeronautical radionavigation services to accommodate wireless avionics intra-communications
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 35 ]
�
� |
Draft liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda items 1.1 and 1.2 (Copy to WP 5A, WP 5D and WP 7C)
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 34 ]
�
� |
Working document towards a draft new Report [MAR-UMS] on the operation of unmanned maritime systems (UMS)
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 33 ]
�
� |
Modifications to the working document towards a draft new Report ITU-R M.[COM-ENVIRO]
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 32 ]
�
� |
Modifications to the working document towards a draft new ReportITU-R M.[ EXCHANGE-MARITIME-INFOS ]
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 31 ]
�
� |
Working document towards a draft new Report - Using AIS for distress communications
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 30 ]
�
� |
Proposed draft liaison statement to ITU-R Working Party 4A - WRC-15 Agenda item 1.6
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 29 ]
�
� |
Draft reply liaison statement to Working Party 7C - Comments on "Potential Interference between the Earth Exploration-Satellite (active) Service in the 1 215-1 300 MHz band and the Air-Route Surveillance Radars in the 1 215-1 400 MHz band"
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 28 ]
�
� |
Preliminary draft revision of Recommendation ITU-R M.1463 - Characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency band 1 215-1 400 MHz
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 27 ]
�
� |
Preliminary draft revision of Recommendation ITU-R M.1796 - Characteristics of and protection criteria for terrestrial radars operating in the radiodetermination service in the frequency band 8 500-10 680 MHz
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 26 ]
�
� |
Proposed update to working document towards a preliminary draft new Report on Compatibility of RNSS and radars in the band 1 215-1 300 MHz
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 25 ]
�
� |
Determination of necessary power for automotive radar
�
� |
Russian Federation
� |
� |
2012-05-12 |
|
[ 24 ]
�
� |
Proposals to the studies under WRC-15 Agenda item 1.5
�
� |
Russian Federation
� |
� |
2012-05-14 |
|
[ 23 ]
�
� |
Proposals on the WRC-15 Agenda item 1.15 realization
�
� |
Russian Federation
� |
� |
2012-05-12 |
|
[ 22 ]
�
� |
Proposals on the studies under WRC-15 Agenda item 1.16
�
� |
Russian Federation
� |
� |
2012-05-12 |
|
[ 21 ]
�
� |
Proposal for suppression of Recommendation ITU-R M.1312
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2012-05-11 |
|
[ 20 ]
�
� |
Preliminary draft revision of Recommendations ITU-R M.629, ITU-R M.824-3 and ITU-R M.1176
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2012-05-11 |
|
[ 19 ]
�
� |
Considerations on the fuselage attenuation in the studies under AI 1.17
�
� |
France
� |
� |
2012-05-11 |
|
[ 18 ]
�
� |
WRC-15 Agenda item 1.5 - Studies needed in consideration of the use of frequency bands allocated to the fixed-satellite service for communications of unmanned aircraft systems in non-segregated airspaces
�
� |
France
� |
� |
2012-05-11 |
|
[ 17 ]
�
� |
Working document toward a preliminary draft new Report ITU-R M.[UAS-FSS-SHARING] - Compatibility study between earth station uplink transmitters on unmanned aircraft systems and terrestrial services in the bands 14.0-14.5, 27.5-28.6, and 29.5-30.0 GHz
�
� |
United States of America
� |
� |
2012-05-11 |
|
[ 16 ]
�
� |
Working document toward a preliminary draft new Recommendation - Systems characteristics for 79 GHz band automotive short-range high-resolution radars
�
� |
Japan
� |
205/5
� |
2012-05-11 |
|
[ 15 ]
�
� |
Proposal of Addition to Recommendation ITU-R M.1874 "Technical and operational characteristics of oceanographic radars operating in sub-bands within the frequency range 3-50 MHz"
�
� |
Japan
� |
� |
2012-05-11 |
|
[ 14 ]
�
� |
Consideration of contributions and Work plan for automotive radar in Working Parties 5A and 5B (WRC-15 Agenda Item 1.18)
�
� |
United States of America
� |
� |
2012-05-09 |
|
[ 13 ]
�
� |
Summary of results of the RA-12 and CPM15-1
�
� |
Chairman, SG 5
� |
� |
2012-05-08 |
|
[ 12 ]
�
� |
Attribution of the Study Group 5 texts to the Working Parties
�
� |
Chairman, SG 5
� |
� |
2012-05-08 |
|
[ 11 ]
�
� |
Future updating of the Recommendations and other ITU-R texts under joint responsibility of Study Groups 4 and 5
�
� |
Chairmen, SGs 4 and 5
� |
� |
2012-05-08 |
|
[ 10 ]
�
� |
Liaison statement - Resolution ITU-R 60
�
� |
ITU-T SG 5
� |
� |
2012-05-07 |
|
[ 9 ]
�
� |
Proposed modification to Recommendation ITU-R M.1841 - Compatibility between FM sound-broadcasting in the band of about 87-108 MHz and the aeronautical ground-based augmentation system in the band about 108-117.975 MHz
�
� |
Germany (Federal Republic of)
� |
� |
2012-05-07 |
|
[ 8 ]
�
� |
Liaison note to ITU - Draft revision of Recommendation ITU-R M.1371-4
�
� |
International Association of Marine Aids to Navigation and Lighthouse Authorities
� |
� |
2012-04-30 |
|
[ 7 ]
�
� |
Liaison Note to ITU-R Working Party 5B - Proposed changes to Recommendations ITU-R M.824-3 and ITU-R M.1176
�
� |
International Association of Marine Aids to Navigation and Lighthouse Authorities
� |
� |
2012-04-30 |
|
[ 6 ]
�
� |
Liaison Note to ITU-R Working Party 5B - Plan for Future VHF Data Communications
�
� |
International Association of Marine Aids to Navigation and Lighthouse Authorities
� |
� |
2012-04-30 |
|
[ 5 ]
�
� |
Recommendation ITU-R P.528-3 to be brought to the attention of Study Group 5
�
� |
SG 3
� |
� |
2012-04-20 |
|
[ 4 ]
�
� |
WRC Resolutions and Recommendations related to the work of Study Group 5
�
� |
Chairman, SG 5
� |
� |
2012-04-03 |
|
[ 3 ]
�
� |
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1
�
� |
Chairman, JTG 4-5-6-7
� |
� |
2012-03-26 |
|
[ 2 ]
�
(Rev.1)� |
List of Questions - Completion dates of studies to be updated editorially
�
� |
Chairman, SG5
� |
� |
2012-03-21 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2007-2011 study period
�
� |
WP 5B
� |
� |
2012-01-26 |
Results:895 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18
� |
Multiple Document Download:�Formats and Languages to be included (when available):