Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 113 ]
�
� |
IWF in G.8261
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
|
[ 112 ]
�
� |
Discussion on IWF model (G.pacmod living list item 2)
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
|
[ 111 ]
�
� |
Proposals for Service Clock and Network Clock in G.8261 and G.paclock
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
|
[ 110 ]
�
� |
Packet Network reference Models in G.8261
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
|
[ 109 ]
�
� |
MPLS in the G.8261 scope
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
|
[ 108 ]
�
� |
Proposals for corrections in ITU-T G.8261
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
|
[ 107 ]
�
� |
Comments on G.smx draft 0.2
�
� |
Italy
� |
Q10/15
� |
2006-10-18 |
|
[ 106 ]
�
� |
Some proposals for characterizing the transient response of OADMs, ROADMs and PXCs in G.otf
�
� |
Italy
� |
Q7/15, Q6/15
� |
2006-10-18 |
|
[ 105 ]
�
� |
Proposals for the revision of G.697
�
� |
Telecom Italia
� |
Q6/15
� |
2006-10-18 |
|
[ 104 ]
�
� |
Proposal to include in G.959.1 very-long-haul 10G application codes based on the duobinary modulation format, capable to tolerate up to 3200 ps/nm of residual chromatic dispersion with no need of dispersion compensation
�
� |
Marconi
� |
Q6/15
� |
2006-10-18 |
|
[ 103 ]
�
� |
All Optical Packet Networks: outcomes of the IST LASAGNE project
�
� |
Telecom Italia
� |
Q7/15, Q6/15, Q12/15
� |
2006-10-18 |
|
[ 102 ]
�
� |
Proposal for the collaboration activities to study GPON and next generation PON management
�
� |
NTT
� |
Q2/15
� |
2006-10-18 |
|
[ 101 ]
�
� |
Proposal of new draft Recommendation of wavelength allocation for PON
�
� |
NTT
� |
Q2/15
� |
2006-10-18 |
|
[ 100 ]
�
� |
G.vdsl, G.hs: proposed draft texts of Handshake specifications for G.993.2 Amendment 1 Annex C
�
� |
NTT
,
Sumitomo Electrics
,
NEC
,
Fujitsu
,
ACCA Networks
� |
Q4/15
� |
2006-10-18 |
|
[ 99 ]
�
� |
G.paclock draft rearrangement
�
� |
Zarlink Semiconductor
� |
Q13/15
� |
2006-10-18 |
|
[ 98 ]
�
� |
G.paclock alignment with G.813 for Synchronous Ethernet
�
� |
Zarlink Semiconductor
� |
Q13/15
� |
2006-10-18 |
|
[ 97 ]
�
� |
G.paclock - Wander Tolerance test results for Synchronous Ethernet
�
� |
Zarlink Semiconductor
� |
Q13/15
� |
2006-10-18 |
|
[ 96 ]
�
� |
G.paclock - Wander Tolerance for Synchronous Ethernet
�
� |
Zarlink Semiconductor
� |
Q13/15
� |
2006-10-18 |
|
[ 95 ]
�
� |
G.paclock - Scope
�
� |
Zarlink Semiconductor
� |
Q13/15
� |
2006-10-18 |
|
[ 94 ]
�
� |
ITU-T G.8261 - Reference missing in Recommendation Proposals for corrections in ITU-T G.8261
�
� |
Zarlink Semiconductor
� |
Q13/15
� |
2006-10-18 |
|
[ 93 ]
�
� |
Comment on G.8021 and G.8010
�
� |
BT
� |
Q12/15, Q9/15
� |
2006-10-18 |
|
[ 92 ]
�
� |
Comments on G.8110.1
�
� |
BT
� |
Q12/15
� |
2006-10-18 |
|
[ 91 ]
�
� |
Comment on G.8021
�
� |
BT
� |
Q9/15
� |
2006-10-18 |
|
[ 90 ]
�
� |
ADSL:G.vdsl: Control parameters and performance of a retransmission scheme
�
� |
Broadcom
� |
Q4/15
� |
2006-10-18 |
|
[ 89 ]
�
� |
Unified model - Topology
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2006-10-18 |
|
[ 88 ]
�
� |
Unified model - Symbols and conventions
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2006-10-18 |
|
[ 87 ]
�
� |
Unified model - Identifiers
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2006-10-18 |
|
[ 86 ]
�
� |
Unified model - Division of layer network resources
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2006-10-18 |
|
[ 85 ]
�
� |
Unified Model - Sublayers
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2006-10-18 |
|
[ 84 ]
�
� |
Unified Model - Network Management Aspects
�
� |
Nortel Networks (Canada)
� |
Q12/15
� |
2006-10-18 |
|
[ 83 ]
�
� |
PBB Model For G.8010v2 Appendix III and related G.8010v2 & G.8021v2 sections
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q12/15
� |
2006-10-18 |
|
[ 82 ]
�
� |
Resilient Packet Ring for G.8010
�
� |
Nortel Networks (Canada)
� |
Q12/15, Q9/15
� |
2006-10-18 |
|
[ 81 ]
�
� |
Ethernet Ring Protection Scheme - Ring Steering
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2006-10-18 |
|
[ 80 ]
�
� |
Ethernet priorities
�
� |
Nortel Networks (Canada)
� |
Q14/15, Q11/15, Q9/15, Q12/15
� |
2006-10-18 |
|
[ 79 ]
�
� |
G.813 clock for Synchronous Ethernet equipment
�
� |
Nortel Networks (Canada)
� |
Q13/15
� |
2006-10-18 |
|
[ 78 ]
�
� |
RPR for G.8021
�
� |
Nortel Networks (Canada)
� |
Q9/15
� |
2006-10-18 |
|
[ 77 ]
�
� |
Ethernet Ring Requirements by Network Segment
�
� |
Nortel Networks (Canada)
� |
Q9/15, Q12/15
� |
2006-10-18 |
|
[ 76 ]
�
� |
Terminology for G.paclock
�
� |
Telcordia
� |
Q13/15
� |
2006-10-18 |
|
[ 75 ]
�
� |
Proposed PBB model and I-Tag definition issue
�
� |
Alcatel
� |
Q12/15
� |
2006-10-18 |
|
[ 74 ]
�
� |
Considerations in synchronous Ethernet equipment provisioning
�
� |
Symmetricom
� |
Q13/15
� |
2006-10-18 |
|
[ 73 ]
�
� |
Protocol specific rate limiting
�
� |
PMC Sierra
� |
Q2/15
� |
2006-10-18 |
|
[ 72 ]
�
� |
Proposed Amendment 2 to G.7043/Y.1343
�
� |
PMC Sierra
� |
Q11/15
� |
2006-10-18 |
|
[ 71 ]
�
� |
Proposed Corrigendum to ITU-T Rec. G.7041 (GFP)
�
� |
PMC Sierra
� |
Q11/15
� |
2006-10-18 |
|
[ 70 ]
�
� |
VDSL2: Follow up on proposed baseline text for OLR mechanism
�
� |
Conexant Systems
,
Ikanos Communications
� |
Q4/15
� |
2006-10-18 |
|
[ 69 ]
�
� |
G.hn: The LLC sub-layer functions
�
� |
CopperGate Communications
� |
Q4/15
� |
2006-10-18 |
|
[ 68 ]
�
� |
G.vdsl2 - Revised European Operator Requirements for VDSL2 Band Plan Extensions
�
� |
BT
,
Telef�nica O2 Czech Republic
,
Deutsche Telekom
,
Swisscom
,
Teliasonera
,
Telenor
,
Telecom Italia
,
France Telecom
� |
Q4/15
� |
2006-10-18 |
|
[ 67 ]
�
� |
Protocol extension for automatic discovery in OTN networks
�
� |
ETRI
� |
Q14/15
� |
2006-10-18 |
|
[ 66 ]
�
� |
G.VDSL2: Proposed update of G.993.2 Annex A
�
� |
Ikanos
,
Infineon
,
AT&T
,
Conexant
,
Aktino
� |
Q4/15
� |
2006-10-17 |
|
[ 65 ]
�
� |
Clarifications for 1-Phase/2-Phase APS protocols for G.8031
�
� |
Mitsubishi
� |
Q9/15
� |
2006-10-17 |
|
[ 64 ]
�
� |
Proposal for Appendix of G.666
�
� |
Lucent Technologies Germany
,
Deutsche Telekom
� |
Q7/15
� |
2006-10-17 |
Resultados :913 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):