International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-T : SG 5 : Contributions� Recently posted�-� Search Meeting Documents
ITU-T�SG 5� C�

ITU-T�SG 5

Environment, climate change and circular economy

Study Period 2017

Results:902 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 102 ]
Proposal to revise and modify on ITU-T K.116 "Electromagnetic compatibility requirements and test methods for radio telecommunication terminal equipment " � National Telecommunications Corporation (NTC)- Sudan Q3/5 2017-10-26
[ 101 ]
(Rev.1)
Initial Text for L.MAAP (Methodology for assessing the aggregated positive impact of ICT in other sectors) � Nokia Corporation Q9/5 2017-10-26
[ 100 ]
Update on: ITU-T L.CE - Circular Economy: - Guideline to migrate to circular ICT network infrastructure (TD139) � Royal KPN N.V. Q7/5 2017-10-25
[ 99 ]
Connect 2020 agenda E-Waste reduction � Royal KPN N.V. Q7/5 2017-10-25
[ 98 ]
(Rev.1)
Proposed second draft "Supplement to K.soft_des for Soft error measures of FPGA" � Fujitsu Limited , Hitachi, Ltd. , NEC Corporation , Nippon Telegraph and Telephone Corporation (NTT) , Oki Electric Industry Company Ltd. (OKI) , Xilinx Incorporation Q5/5 2017-10-25
[ 97 ]
(Rev.1)
Provide the information of the Japanese electric and information technology industries activities about the Green IT/IoT � Fujitsu Limited , Hitachi, Ltd. , NEC Corporation Q9/5 2017-10-25
[ 96 ]
Report on contribution of SG5RG-ARB Group in the SG20RG- ARB meeting 10th of August � Ministry of Communication and Information Technology (MCIT)-Egypt QALL/5 2017-10-17
[ 95 ]
Screened, shielded and coaxial cable definitions for K.44 � Bourns Limited Q2/5 2017-10-17
[ 94 ]
TD 123 K.44 8/20 generator artwork check � Bourns Limited Q2/5 2017-10-17
[ 93 ]
Extended Producer Responsibility Assessment Report � Centre for Environment and Development for the Arab Region and Europe (CEDARE)-Egypt Q7/5 2017-10-16
[ 92 ]
Ethernet port differential surge test with reduced i�t � Bourns Limited Q2/5 2017-10-15
[ 91 ]
Ethernet port current surge parameters � Bourns Limited Q2/5 2017-10-14
[ 90 ]
(Rev.1)
Confusion with what tests need to be done for PoE interfaces. � ADTRAN Q2/5 2017-10-09
[ 89 ]
(Rev.1)
External enhanced transverse test of 6 kV is too extreme for normal Ethernet port topologies. � ADTRAN Q2/5 2017-10-09
[ 88 ]
(Rev.1)
Align Ethernet & PoE K.20 internal transverse surge tests � ADTRAN Q2/5 2017-10-09
[ 87 ]
(Rev.1)
Simultaneous port to earth test are extreme for internal building applications. � ADTRAN Q2/5 2017-10-09
[ 86 ]
(Rev.1)
Test description in the test tables is incorrect for the type of test (A.6.7-3a). � ADTRAN Q2/5 2017-10-09
[ 85 ]
(Rev.1)
Shield bond test levels are extreme for internal building applications � ADTRAN Q2/5 2017-10-09
[ 84 ]
(Rev.1)
Test description in the test tables is incorrect for the type of test (A.6.7-6). � ADTRAN Q2/5 2017-10-09
[ 83 ]
The case for greater due diligence by the ICT Sector and the need to focus on the environment � Minist�re des Postes, T�l�communications et Nouvelles Technologies de l'Information et de la Communication-Dem.Rep. of the Congo Q7/5 2017-10-06
[ 82 ]
(Rev.1)
Suggestions for K.99 Surge protective component application guide - Gas discharge tubes � Littelfuse UK Ltd. Q2/5 2017-09-26
[ 81 ]
(Rev.1-2)
Procedures to reduce the damage of non-ionizing radiation in my developing country � Ministry of Telecommunications and Information Technology-Yemen Q3/5 2017-09-20
[ 80 ]
(Rev.1)
Addressing all shielded data ports including USB � ADTRAN Q2/5 2017-09-19
[ 79 ]
Human Exposure to electromagnetic fields radiated by information and communication technologies (ICTs) � Minist�re des Postes, des T�l�communications et de l'Economie Num�rique - Guinea (Conakry) Q3/5 2017-09-18
[ 78 ]
(Rev.1)
K.20 & K.21 internal cable length of 10 meter or less are exempt � ADTRAN Q2/5 2017-09-13
[ 77 ]
Suggestions for new work on circular economy and resource efficiency in ITU-T � Huawei Technologies Co., Ltd. , Royal KPN N.V. Q7/5 2017-05-03
[ 76 ]
The power frequency magnetic field (PFMF) control of ICT equipment rooms and PFMF immunity requirement for ICT equipment for ITU-T K.idc � Huawei Technologies Co., Ltd. Q1/5 2017-05-03
[ 75 ]
Characteristics of Metal Oxide Varistors (MOVs) for the protection of telecommunications installations � Huawei Technologies Co., Ltd. Q2/5 2017-05-03
[ 74 ]
The lightning test proposal of the Ethernet port and errata in K.20, K.21 and K.45 � Huawei Technologies Co., Ltd. Q2/5 2017-05-03
[ 73 ]
The lightning test proposal of the USB in K.20 and K.21 � Huawei Technologies Co., Ltd. Q2/5 2017-05-03
[ 72 ]
Dangerous effects and protective measures against electromagnetic disturbances when internet data centre is co-sited with high-voltage substation � Huawei Technologies Co., Ltd. Q1/5 2017-05-03
[ 71 ]
3-Electrode GDT operation in Ethernet circuits � Bourns Limited Q2/5 2017-05-02
[ 70 ]
Withdrawn due to duplication � N/A � 2017-05-02
[ 69 ]
Withdrawn due to duplication � N/A � 2017-05-02
[ 68 ]
(Rev.1)
Re-radiation influence � Ag�ncia Nacional de Telecomunica��es - ANATEL , Brazil Q3/5 2017-05-02
[ 67 ]
(Rev.1)
Mobile App "EMF Exposure" � Ag�ncia Nacional de Telecomunica��es - ANATEL Q3/5 2017-05-02
[ 66 ]
(Rev.1)
Study performed on a 2 degrees trajectory for the ICT sector � Nokia Corporation , Orange , Telefon AB - LM Ericsson Q9/5 2017-05-02
[ 65 ]
(Rev.1)
Proposal of creation of a database on GHG emissions � Orange , Nokia Corporation , Telefon AB - LM Ericsson Q9/5 2017-05-02
[ 64 ]
Appendix proposal for K.99 on GDT Component Form Factors � Bourns Limited Q2/5 2017-05-02
[ 63 ]
(Rev.1)
Assessment of Positive Environmental Impacts of ICT � Nokia Corporation , Orange , Telefon AB - LM Ericsson Q9/5 2017-05-02
[ 62 ]
(Rev.1)
Recommendation L.mmNFV - Measurement method for energy efficiency of Network Function Virtualization � Consorzio Nazionale Interuniversitario per le Telecomunicazioni , Huawei Technologies Co., Ltd. Q6/5 2017-05-02
[ 61 ]
Proposed inputs for the draft of L. GSTNI: Renewable Energy Power Supply Systems - Self-Recharging Energy System � Ministry of Communications and Multimedia Malaysia Q6/5 2017-05-02
[ 60 ]
Member states status report on the deployment of green or environment friendly ICT project � Ministry of Communications and Multimedia Malaysia QALL/5 2017-05-02
[ 59 ]
Localised Weather Alert Service to Fishing Villages on Lake Victoria � Egypt Q8/5 2017-05-02
[ 58 ]
New Baseline Document for work item L.AF adaptation of the fisheries sector to the effects of climate change using ICTs � Egypt Q8/5 2017-05-02
[ 57 ]
(Rev.1)
Proposal new Work Item on a Sector-based methodology for the assessment of the environmental impact of ICT � Ministerio de Comunicaciones, Argentina Q9/5 2017-05-02
[ 56 ]
(Rev.1)
Creation of a Regional Group for Latin America on Environment, Climate Change and Circular Economy within ITU-T Study Group 5 � Argentina , Colombia , Paraguay , Uruguay QALL/5 2017-05-02
[ 55 ]
Review of K.20, K.21, K.44 and K.45 - Part 3 K.44 generators and test circuits � Bourns Limited Q2/5 2017-05-02
[ 54 ]
Review of K.20, K.21, K.44 and K.45 - Part 2 K.20, K.21 and K.45 Test tables columns 4 and 5 � Bourns Limited Q2/5 2017-05-02
[ 53 ]
(Rev.1)
New working item proposal on assessment specifications for sustainable design of mobile phone � Ministry of Industry and Information Technology (MIIT), China Q9/5 2017-05-02
Results:902 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� TSB EDH
Updated :�2022-01-20