Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 47 ]
�
� |
Proposed liaison statement to Working Party 5D on the studies related to RR No. 21,5 regarding AAS
�
� |
France
� |
� |
2020-07-10 |
|
[ 46 ]
�
� |
Proposed draft liaison response to ITU-T Study Group 11 (copy to ITU-D SG2 Q5/2, ITU-R Working Parties 1B, 5B and 5D, and the RAG) - Disaster Relief Use Cases
�
� |
Chairmen, WP 5A and WG 5A-3
� |
� |
2020-07-09 |
|
[ 45 ]
�
� |
Working Party 5A Management
�
� |
Chairman, WP 5A
� |
� |
2020-07-09 |
|
[ 44 ]
�
� |
Proposed modification to Recommendation ITU-R M.1450-5
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2020-07-09 |
|
[ 43 ]
�
� |
Proposed modification to Recommendation ITU-R M.1801-2
�
� |
Institute of Electrical and Electronics Engineers, Inc.
� |
� |
2020-07-09 |
|
[ 42 ]
�
� |
Progression of the working document towards a preliminary draft new Report on utility communication systems
�
� |
Canada
� |
Q37/5
� |
2020-06-25 |
|
[ 41 ]
�
� |
Development of the working document towards a preliminary draft revision of Report ITU-R M.2417-0 - Technical and operational characteristics of land-mobile service applications
in the frequency range 275-450 GHz
�
� |
Canada
� |
Q256/5
� |
2020-06-25 |
|
[ 40 ]
�
� |
Proposed working document towards a preliminary draft new Report ITU-R M.[CAV] - Connected Automated Vehicles (CAV)
�
� |
Canada
� |
Q261/5
� |
2020-06-25 |
|
[ 39 ]
�
� |
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups
�
� |
Director, BR
� |
� |
2020-06-25 |
|
[ 38 ]
�
� |
Contribution to Working Parties 5A, 5B, 5C and 5D on relevant agenda item of WRC-23
�
� |
Iran (Islamic Republic of)
� |
� |
2020-06-15 |
|
[ 37 ]
�
� |
Way forward on radiocommunication systems train to trackside (RSTT) in the 2020-2023 Study Period
�
� |
United States of America
� |
� |
2020-06-12 |
|
[ 36 ]
�
� |
Proposed update to working document towards a preliminary draft new Report ITU-R M.[100-GHZ.RSTT.COEXIST] - Coexistence between high-speed railway radiocommunication system between train and trackside operating in the frequency bands 92-94 GHz, 94.1-100 GHz and 102-109.5 GHz, and radio astronomy and Earth exploration-satellite (active and passive)
�
� |
United States of America
� |
� |
2020-06-12 |
|
[ 35 ]
�
� |
Update on mobile services in the United States within 27.5-28.35 GHz
�
� |
United States of America
� |
� |
2020-06-12 |
|
[ 34 ]
�
� |
Proposed revisions to working document towards revision of Land Mobile Handbook Vol. 4 - Intelligent Transport Systems
�
� |
United States of America
� |
� |
2020-06-12 |
|
[ 33 ]
�
� |
Possible harmonization of frequency bands for connected automated vehicle (CAV) communication
�
� |
United States of America
� |
Q261/5
� |
2020-06-12 |
|
[ 32 ]
�
� |
Liaison statement to Working Parties 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.16
�
� |
WP 4A
� |
AI1.16
� |
2020-06-10 |
|
[ 31 ]
�
� |
Liaison statement to Working Parties 4B, 4C, 5A, 5B, 5C, 7B and 7C (copy for information to Working Party 3M) - WRC-23 agenda item 1.17
�
� |
WP 4A
� |
AI1.17
� |
2020-06-10 |
|
[ 30 ]
�
� |
Liaison statement to Working Parties 5A, 5B, 5C, 7B (copy for information to Working Party 3M) - WRC-23 agenda item 1.19
�
� |
WP 4A
� |
AI1.19
� |
2020-06-10 |
|
[ 29 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 7B, 7C and 3M - WRC-23 agenda item 1.18
�
� |
WP 4C
� |
AI1.18
� |
2020-06-08 |
|
[ 28 ]
�
� |
Liaison statement to Working Party 5C (copy for information to Working Parties 3M, 5A, 5B) - WRC-23 agenda item 1.15
�
� |
WP 4A
� |
AI1.15
� |
2020-06-08 |
|
[ 27 ]
�
� |
Liaison statement to Working Parties 5A and 5B (copy for information to Working Parties 3M and 5C) - WRC-23 agenda item 1.15
�
� |
WP 4A
� |
AI1.15
� |
2020-06-08 |
|
[ 26 ]
�
� |
Liaison statement to Working Parties 5A and 3M - Information for studies on WRC-23 agenda item 9.1, topic b)
�
� |
WP 4C
� |
AI9.1
� |
2020-06-08 |
|
[ 25 ]
�
� |
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan
�
� |
ITU-T SG 9
� |
� |
2020-05-27 |
|
[ 24 ]
�
� |
Preliminary position on WRC-23 agenda
�
� |
World Meteorological Organization
� |
� |
2020-05-13 |
|
[ 23 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C (copy to Working Parties 3J and 3M for information) - Request system characteristics of primary services to be used for sharing and compatibility studies in the frequency range 231.5-252 GHz and adjacent bands
�
� |
WP 7C
� |
AI1.14
� |
2020-04-30 |
|
[ 22 ]
�
(Rev.1)� |
Liaison statement to Working Parties 5A, 5B, 5C and 6A - Preparations for studies under WRC-23 agenda item 1.12
�
� |
WP 7C
� |
AI1.12
� |
2020-04-30 |
|
[ 21 ]
�
� |
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate)
�
� |
WP 7B
� |
AI1.13
� |
2020-04-28 |
|
[ 20 ]
�
� |
Liaison statement on disaster relief use cases
�
� |
ITU-T SG 11
� |
� |
2020-03-25 |
|
[ 19 ]
�
� |
Organization of the work on WRC-23 agenda item 9.1, topic c) (copy for information to Working Party 5D) - Study the use of International Mobile Telecommunication systems for fixed wireless broadband in the frequency bands allocated to the fixed service on a primary basis, in accordance with Resolution 175 (WRC-19)
�
� |
Chairmen, WP 5A and 5C
� |
AI9.1
� |
2020-03-17 |
|
[ 18 ]
�
� |
Liaison statement to ITU-R Working Party 5A - Development of a draft new Report ITU-R M.[IMT.C-V2X] - Application of the Terrestrial Component of IMT for Cellular-V2X
�
� |
WP 5D
� |
� |
2020-03-09 |
|
[ 17 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Parties 5A and 5D on emergency services supported through IMT
�
� |
ITU-D SG 2
� |
� |
2020-03-06 |
|
[ 16 ]
�
� |
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D - Preparations for WRC-23 agenda items 1.1 and 1.2
�
� |
WP 5D
� |
AI1.2, AI1.1
� |
2020-03-06 |
|
[ 15 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2
�
� |
WP 5D
� |
AI1.2
� |
2020-03-06 |
|
[ 14 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4
�
� |
WP 5D
� |
AI1.4
� |
2020-03-06 |
|
[ 13 ]
�
� |
Liaison statement to Working Party 4C (copy to Working Parties 5A and 5C for information) - Sharing and coexistence studies between the mobile-satellite service and terrestrial IMT systems in the 2 655-2 690 MHz frequency band in certain countries of Region 3
�
� |
WP 5D
� |
� |
2020-03-06 |
|
[ 12 ]
�
� |
Results from the Fifteenth meeting of Study Group 5 (2-3 September 2019) of interest to Working Party 5A
�
� |
Chairman, WP 5A
� |
� |
2020-03-03 |
|
[ 11 ]
�
� |
Liaison statement from ITU-D Study Group 1 Q5/1 to ITU-R Study Group 5 Working Parties 5A and 5D on Questions ITU-R 77-8/5 and ITU-R 238-3/5
�
� |
ITU-D SG 1
� |
� |
2020-03-03 |
|
[ 10 ]
�
� |
Liaison on the new version of the Home Network Transport (HNT) standards overview and work plan
�
� |
ITU-T SG 15
� |
� |
2020-02-19 |
|
[ 9 ]
�
� |
Liaison on the new version of the Access Network Transport (ANT) standards overview and work plan
�
� |
ITU-T SG 15
� |
� |
2020-02-19 |
|
[ 8 ]
�
� |
Liaison statement to Task Group 6/1 (copy to Working Parties 3K, 3M, 5A, 5B, 5C and 5D) - WRC-23 agenda item 1.5
�
� |
WP 6A
� |
� |
2020-02-12 |
|
[ 7 ]
�
� |
Liaison statement to Working Party 5A (copy to Working Party 5C and Task Group 6/1 for information) - Issues related to Services ancillary to broadcasting/Services ancillary to programme-making relative to WRC-23 agenda item 1.5
�
� |
WP 6A
� |
AI1.5
� |
2020-02-12 |
|
[ 6 ]
�
� |
Liaison statement to Working Parties 5A and 5C and for information to Working Parties 4C, 5B and 5D - Resolution ITU-R 59-2 and related work within Working Party 6A
�
� |
WP 6A
� |
� |
2020-02-12 |
|
[ 5 ]
�
� |
Liaison statement on technical reports on use cases and requirements as well as architecture for vehicular multimedia
�
� |
ITU-T FG-VM
� |
� |
2020-01-20 |
|
[ 4 ]
�
� |
Working Party 5A preparatory work for WRC-23 (copy for information to Working Parties 5B, 5C and 5D)
�
� |
Chairman, Working Party 5A
� |
� |
2020-01-09 |
|
[ 3 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T SG5 WP1/5, ITU-R Working Parties 1A, 1C, 4A, 5A, 5C, 5D and 6A on strategies and policies concerning human exposure to EMF
�
� |
ITU-D SG 2
� |
� |
2019-11-29 |
|
[ 2 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 5/2 to ITU-R Working Party 5A on collaboration
�
� |
ITU-D SG 2
� |
� |
2019-11-18 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2015-2019 study period
�
� |
WP 5A
� |
� |
2019-10-31 |
Results:847 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
� |
Multiple Document Download:�Formats and Languages to be included (when available):