Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 183 ]
�
� |
Draft small satellite Handbook
�
� |
China (People's Republic of)
� |
� |
2021-02-10 |
|
[ 182 ]
�
� |
Inputs for consideration under WRC-23 agenda item 1.15
�
� |
Chairman, CG on WRC-23 a.i. 1.15
� |
AI1.15
� |
2021-02-09 |
|
[ 181 ]
�
� |
Working document towards a preliminary draft new ITU-R Report - Protection of geostationary satellite networks in the MSS operating in 7/8 and 20/30 GHz from emissions of non-geostationary satellite systems operating in the same frequency bands and identical directions
�
� |
Germany (Federal Republic of)
� |
AI7
� |
2021-02-09 |
|
[ 180 ]
�
� |
Next steps on RR No. 21.5
�
� |
ITU-APT Foundation of India
� |
� |
2021-02-08 |
|
[ 179 ]
�
� |
Proposed topic to be considered under WRC-23 agenda item 7 - To make information available under Nos. 9.51 or 9.52 with respect to requests for coordination under Nos. 9.7 to 9.7B
�
� |
Korea (Republic of)
� |
AI7
� |
2021-02-05 |
|
[ 178 ]
�
� |
Consideration for transmission characteristics of aeronautical ESIM complying with the power flux-density limits on the Earth's surface specified in Part II of Annex 3 to the Resolution 169 (WRC-19)
�
� |
Korea (Republic of)
� |
AI1.5
� |
2021-02-05 |
|
[ 177 ]
�
� |
Report of activities of the Correspondence Group on WRC-23 agenda item 1.15 to Working Party 4A
�
� |
Chairman, CG on WRC-23 a.i. 1.15
� |
AI1.15
� |
2021-02-03 |
|
[ 176 ]
�
+Ann.1-3� |
Report of activities of the Correspondence Group on WRC-23 agenda item 1.19 to Working Party 4A
�
� |
Chairman, CG on WRC-23 a.i. 1.19
� |
AI1.19
� |
2021-02-02 |
|
[ 175 ]
�
� |
Characteristics of space and terrestrial frequency assignments which may be used in sharing and compatibility studies under WRC-23 agenda items 1.16, 1.17 and 1.19
�
� |
Director, BR
� |
AI1.19, AI1.17, AI1.16
� |
2021-02-02 |
|
[ 174 ]
�
� |
Proposal to develop new ITU-R Report on technical and operational characteristics of stations in the fixed satellite service, employing active antenna systems
�
� |
Russian Federation
� |
� |
2021-02-02 |
|
[ 173 ]
�
� |
Proposals on WRC-23 agenda item 1.17
�
� |
Russian Federation
� |
AI1.17
� |
2021-02-03 |
|
[ 172 ]
�
+Ann.1� |
Report of activities of the Correspondence Group on WRC-23 agenda item 1.16 to the Working Party 4A meeting of February/March 2021
�
� |
Chairman, CG on WRC-23 a.i. 1.16
� |
AI1.16
� |
2021-02-01 |
|
[ 171 ]
�
+Ann.1-4� |
Report of activities of the Correspondence Group 6 on inter service and intra service sharing to Working Party 4A - Resolutions 769 (WRC-19) / 770 (WRC-19) and Recommendation ITU-R S.1503, and Resolution 169 (WRC-19)
�
� |
Chairman, CG 6
� |
� |
2021-02-01 |
|
[ 170 ]
�
� |
Report of activities of the Correspondence Group 3 on WRC-23 agenda item 1.17 to Working Party 4A - Working document related to WRC-23 agenda item 1.17
�
� |
Chairman , CG 3 on WRC-23 a.i. 1.17
� |
AI1.17
� |
2021-02-01 |
|
[ 169 ]
�
� |
Report of activities of the Correspondence Group on WRC-23 agenda item 7 to Working Party 4A
�
� |
Chairman, CG on WRC-23 a.i. 7
� |
AI7
� |
2021-01-26 |
|
[ 168 ]
�
� |
Liaison statement on establishment of a new ITU-T Focus Group on artificial intelligence for natural disaster management (FG-AI4NDM) and first meeting (Virtual, 15-17 March 2021)
�
� |
ITU-T SG 2
� |
� |
2021-01-15 |
|
[ 167 ]
�
� |
Note from the Chairmen of Study Group 4 and Study Group 5 to Working Parties 4A, 4C and 5D
�
� |
Chairmen SG 4 and SG 5
� |
� |
2021-01-07 |
|
[ 166 ]
�
� |
Comments on proposed modifications to Recommendation ITU-R S.1503-3
�
� |
HISPASAT, S.A.
,
Al Yah Satellite Communications (YahSat)
,
ES'hailSat
,
Eutelsat S.A.
,
Inmarsat Plc.
,
Intelsat US LLC
,
Telenor ASA
,
Thuraya
,
TURKSAT Uypu Haberlesme Kablo TV ve isletme A.S.
,
ViaSat, Inc.
� |
� |
2021-01-06 |
|
[ 165 ]
�
� |
Reply liaison statement to Working Party 5B (copy to Working Parties 3K, 3M, 4A, 5A, 7C, and 7D for information) - WRC-23 agenda item 1.10
�
� |
WP 5C
� |
AI1.10
� |
2020-11-27 |
|
[ 164 ]
�
� |
Reply liaison statement to Working Party 5A (copy to Working Parties 4A, 5B and 5D for information) - WRC-23 agenda item 1.3
�
� |
WP 5C
� |
AI1.3
� |
2020-11-27 |
|
[ 163 ]
�
� |
Liaison statement to Working Party 4A (copy for information to Working Parties 3M, 5A, and 5B) - WRC-23 agenda item 1.15 - Studies on use of the frequency band 12.75-13.25 GHz (Earth-to-space) by earth stations on aircraft and vessels communicating with geostationary space stations in the fixed-satellite service
�
� |
WP 5C
� |
AI1.15
� |
2020-11-27 |
|
[ 162 ]
�
� |
Liaison statement to Working Party 4C (copy to Working Party 4A) - UAS CNPC link in the 5 GHz
�
� |
WP 5B
� |
� |
2020-11-26 |
|
[ 161 ]
�
� |
Liaison statement to ICAO (copy to Working Party 4A for information) - Clarification on the draft ICAO position on WRC-23 agenda items 1.15, 1.16 and 1.17
�
� |
WP 5B
� |
AI1.17, AI1.16, AI1.15
� |
2020-11-25 |
|
[ 160 ]
�
� |
List of assignments that the Administration of Iran (Islamic Republic of) had notified to the Bureau and that are within the frequency bands subject to WRC-23 agenda items
�
� |
Iran (Islamic Republic of)
� |
� |
2020-11-15 |
|
[ 159 ]
�
� |
Reply liaison statement to Working Party 3M (copy to Working Parties 3K, 4A, 5A, 5C, 7C and 7D for information) - WRC-23 agenda item 1.10 - Possible new allocations to the aeronautical mobile service for the use of non-safety applications
�
� |
WP 5B
� |
AI1.10
� |
2020-11-23 |
|
[ 158 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5D, 6A, and 7D for information) - WRC-23 agenda item 9.1, topic a)
�
� |
WP 5C
� |
AI9.1A)
� |
2021-01-26 |
|
[ 157 ]
�
� |
Reply liaison statement to Working Party 5B (copy to Working Parties 4A, 4B, 5A, 7D and 3M for information) - WRC-23 agenda item 1.8 - Technical and operational characteristics and protection of the fixed service
�
� |
WP 5C
� |
AI1.8
� |
2020-11-20 |
|
[ 156 ]
�
� |
Liaison statement on work being carried out under study in ITU-T Q3/5
�
� |
ITU-T SG5
� |
� |
2020-11-19 |
|
[ 155 ]
�
+Ann.1-32� |
Report on the meeting of Working Party 4A (28 October - 5 November 2020) (Virtual Meeting)
�
� |
Chairman, WP 4A
� |
� |
2020-11-05 |
|
[ 154 ]
�
� |
Final list of participants Working Party 4A: E-meeting, 28 October - 5 November 2020
�
� |
Director, BR
� |
� |
2020-11-05 |
|
[ 153 ]
�
� |
Reply liaison statement to Working Party 4A - Performance and availability Recommendations of the fixed-satellite service for reference in sharing studies
�
� |
WP 4B
� |
AI1.17
� |
2020-11-03 |
|
[ 152 ]
�
� |
List of Documents issued (Documents 4A/30 - 4A/152)
�
� |
BR Study Groups Department
� |
� |
2020-10-28 |
|
[ 151 ]
�
� |
Liaison statements to Working Party 4A informing on latest status/developments on various topics
�
� |
Chairman, WP 4A
� |
� |
2020-10-28 |
|
[ 150 ]
�
� |
Liaison statements to Working Party 4A regarding WRC-23 agenda items for which WP 4A is a contributing group
�
� |
Chairman, WP 4A
� |
� |
2020-10-28 |
|
[ 149 ]
�
� |
Working Party 4A Chairman's Report annexes overtaken by the results of WRC-19
�
� |
Chairman, WP 4A
� |
� |
2020-10-28 |
|
[ 148 ]
�
� |
Liaison statement to Working Party 5B (copy for information to Working Parties 3M, 4A and 7B) - Information for studies on WRC-23 agenda item 1.6
�
� |
WP 4C
� |
AI1.6
� |
2020-10-27 |
|
[ 147 ]
�
� |
Reply liaison statement to Working Party 4A - Preparations for WRC-23 agenda items 1.16 and 1.17
�
� |
WP 4C
� |
AI1.17, AI1.16
� |
2020-10-27 |
|
[ 146 ]
�
� |
Liaison statement from ITU-D Study Group 2 Questions 5/2 to ITU-T SG 2, ITU-T SG 5, ITU-T SG 11, ITU-T SG 12, ITU-T SG 15, ITU-T SG 16, ITU-T SG 20, ITU-R Study Group 1, Working Parties 1B, 1C, 4A, 4B, 4C, 5A, 5D, Study Group 6, Working Party 6A, Study Group 7 on the final Report of ITU-D Q5/2 and draft future work of ITU-D Q5/2 to WTDC-21
�
� |
ITU-D SG 2
� |
� |
2020-10-27 |
|
[ 145 ]
�
� |
List of assignments that the Administration of Iran (Islamic Republic of) had notified to the Bureau and that are within the frequency bands subject to WRC-23 agenda items
�
� |
Iran (Islamic Republic of)
� |
� |
2020-10-21 |
|
[ 144 ]
�
� |
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5 WP 1/5 and ITU-R Working Parties 1A, 1C, 4A, 5A, 5B, 5C, 5D, 6A, 7A and 7B on strategies and policies concerning human exposure to EMF
�
� |
ITU-D SG 2
� |
� |
2020-10-23 |
|
[ 143 ]
�
� |
Liaison statement from ITU-D Study 2 Question 2/2 to ITU-R Working Parties 4A, 4B and 4C on satellite communications for e-Health
�
� |
ITU-D SG 2
� |
� |
2020-10-22 |
|
[ 142 ]
�
� |
Proposal for a new working document towards a preliminary draft new Recommendation ITU-R S.[MITIGATION MEASURES] to improve coexistence between IMT systems operating within 3 400-3 700 MHz and receiving FSS earth stations operating in the same band in the adjacent band
�
� |
EMEA Satellite Operators Association (ESOA)
� |
� |
2020-10-21 |
|
[ 141 ]
�
� |
Fixed-satellite service technical and operational characteristics and protection criteria for studies under WRC-23 agenda item 1.2
�
� |
EMEA Satellite Operators Association (ESOA)
� |
AI1.2
� |
2020-10-21 |
|
[ 140 ]
�
� |
Working document towards a Preliminary Draft New Report ITU-R S.[KA_NGSO_ESIM] for sharing and compatibility study with non-GSO ESIM operating in the frequency bands 17.7-18.6 GHz, 18.8-19.3 GHz and 19.7-20.2 GHz (space-to-Earth) and 27.5-29.1 GHz and 29.5-30 GHz (Earth-to-space)
�
� |
Luxembourg
� |
AI1.16
� |
2020-10-21 |
|
[ 139 ]
�
� |
Proposed updates to working document on post milestone reporting
�
� |
Luxembourg
� |
AI7
� |
2020-10-21 |
|
[ 138 ]
�
� |
Tolerances on orbital characteristics for a non-GSO system in highly inclined and elliptical orbit
�
� |
Norway
� |
AI7
� |
2020-10-21 |
|
[ 137 ]
�
� |
Proposed modifications to the working document towards addressing studies under WRC-23 agenda item 1.15
�
� |
SES World Skies
� |
AI1.15
� |
2021-10-21 |
|
[ 136 ]
�
� |
Preliminary technical and operational characteristics of satellite to satellite transmissions in the frequency bands 11.7-12.7 GHz, 18.1-18.6 GHz, 18.8-20.2 GHz and 27.5-30 GHz
�
� |
EMEA Satellite Operators Association (ESOA)
� |
AI1.17
� |
2020-10-21 |
|
[ 135 ]
�
� |
FSS protection criteria for adjacent band compatibility studies for WRC-23 agenda items 1.2 and 1.3
�
� |
GSMA
� |
AI1.3, AI1.2
� |
2020-10-21 |
|
[ 134 ]
�
� |
Proposed draft Resolution for agenda item 1.15
�
� |
Germany (Federal Republic of)
� |
AI1.15
� |
2020-10-21 |
Results:983 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):