Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 115 ]
�
� |
Comments on Annex 11 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
Iran (Islamic Republic of)
� |
AI1.15
� |
2016-09-19 |
|
[ 114 ]
�
� |
Comments to Annex 10 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.4 ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting-satellite service in all Regions
�
� |
Iran (Islamic Republic of)
� |
� |
2016-09-18 |
|
[ 113 ]
�
� |
Comments on Annex 9 to Working Party 4A Chairman's Report - Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on sharing with incumbent services in the 51.4-52.4 GHz band and adjacent and nearby bands - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
Iran (Islamic Republic of)
� |
AI9.1
� |
2016-09-18 |
|
[ 112 ]
�
� |
Comments on Annex 8 Working Party 4A Chairman's Report - Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
Iran (Islamic Republic of)
� |
AI9.1
� |
2016-09-18 |
|
[ 111 ]
�
� |
Comments on Annex 7 to Working Party 4A Chairman's Report - Working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6
�
� |
Iran (Islamic Republic of)
� |
AI1.6
� |
2016-09-18 |
|
[ 110 ]
�
� |
Comments on Annex 5 to Working Party 4A Chairman's Report - Woking document [TOWARDS A PRELIMINARY DRAFT NEW RECOMMENDATION/REPORT] ITU-R.S[NGSO_6/4-GHZ] on technical and regulatory studies for 6/4 GHz GSO/Non-GSO FSS sharing - WRC-19 agenda item 9.1, issue 9.1.3
�
� |
Iran (Islamic Republic of)
� |
AI9.1
� |
2016-09-18 |
|
[ 109 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-19
�
� |
Chairman, CPM-19
� |
� |
2016-09-19 |
|
[ 108 ]
�
� |
Excessive notified characteristics of recorded frequency assignments of GSO satellite networks and treatment of frequency assignments with a bandwidth less than the stated averaging bandwidth
�
� |
Director, BR
� |
� |
2016-09-14 |
|
[ 107 ]
�
� |
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (WRC-19 agenda item 7)
�
� |
Korea (Republic of)
� |
AI7
� |
2016-09-13 |
|
[ 106 ]
�
� |
Liaison statement to Working Party 5B (copied to Working Party 4A for information) - Update on ICAO UAS/RPAS SARPS activities
�
� |
International Civil Aviation Organization
� |
� |
2016-09-09 |
|
[ 105 ]
�
� |
Liaison statement to Working Party 4A (copied to Working Party 5B for information) - Update on ICAO UAS/RPAS SARPS activities
�
� |
International Civil Aviation Organization
� |
� |
2016-09-09 |
|
[ 104 ]
�
� |
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (Issue 9.1.2)
�
� |
Japan
� |
AI9.1
� |
2016-09-08 |
|
[ 103 ]
�
� |
Report of the Twelfth meeting of the Joint IMO/ITU Experts Group on maritime radiocommunication matters
�
� |
International Maritime Organization
� |
� |
2016-08-25 |
|
[ 102 ]
�
� |
Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.11A, 9.12, 9.12A and 9.13 or 9.21
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2016-07-20 |
|
[ 101 ]
�
� |
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15
�
� |
WPs 3K and 3M
� |
AI1.15
� |
2016-07-06 |
|
[ 100 ]
�
(Rev.1)� |
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz
�
� |
WPs 3K and 3M
� |
� |
2016-07-04 |
|
[ 99 ]
�
� |
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A,
4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS)
�
� |
WP 3M
� |
� |
2016-07-04 |
|
[ 98 ]
�
� |
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios
�
� |
WPs 3K and 3M
� |
� |
2016-07-01 |
|
[ 97 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A,
4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 3J
� |
� |
2016-07-01 |
|
[ 96 ]
�
� |
Liaison statement to Working Parties 4A & 4C - Coordination of work on anticipated draft CPM text deadlines for WRC-19 agenda items / issues where Working Party 5D is a jointly responsible group
�
� |
WP 5D
� |
� |
2016-06-29 |
|
[ 95 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5B, 5C & 7B - Request for information on anticipated draft CPM text deadlines by responsible groups for WRC-19 agenda items / issues where Working Party 5D is a contributing group
�
� |
WP 5D
� |
� |
2016-06-29 |
|
[ 94 ]
�
� |
Liaison statement concerning the publication of an ETSI Technical Report - ETSI TR 103 233: "Antenna performance characterization for GSO mobile applications"
�
� |
European Telecommunications Standards Institute
� |
� |
2016-06-29 |
|
[ 93 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 6A and 7B (copied to Working Parties 3J, 3K, 3M and Task Group 5/1 for information) - Modelling and simulation of IMT networks for use in sharing and compatibility studies
�
� |
WP 5D
� |
� |
2016-06-28 |
|
[ 92 ]
�
� |
Reply liaison statement to Working Party 4A - WRC-19 agenda item 9.1, issue 9.1.2
�
� |
WP 5D
� |
AI9.1
� |
2016-06-28 |
|
[ 91 ]
�
� |
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7
�
� |
WP 5D
� |
AI1.7
� |
2016-06-24 |
|
[ 90 ]
�
� |
Liaison statement to Working Party 4A - Assessment of potential interference from IMT small cell deployment to FSS earth stations within the band 3 400-3 600 MHz
�
� |
WP 5D
� |
� |
2016-06-23 |
|
[ 89 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5C) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] - A guiding methodology for providing compatibility between ubiquitously deployed earth stations of the fixed-satellite service and stations of the fixed and/or mobile services in adjacent areas for the cases ...
�
� |
WP 5D
� |
� |
2016-06-23 |
|
[ 88 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
WP 5D
� |
AI9.1
� |
2016-06-23 |
|
[ 87 ]
�
� |
Liaison response to Working Party 5A (copy to Working Parties 4A, 4B, 4C and ITU-T Study Group 17) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication
�
� |
WP 5D
� |
� |
2016-06-23 |
|
[ 86 ]
�
� |
Liaison statement to Working Party 4A - Clarification of terms used in Recommendation ITU-R S.1503-2
�
� |
WP 1B
� |
� |
2016-06-22 |
|
[ 85 ]
�
� |
Liaison statement to Working Parties 1C and 4A (WRC-19 agenda item 9.1, issue 9.1.7) - Studies on managing uplink transmissions of terminals to be limited to authorized terminals
�
� |
WP 1B
� |
AI9.1
� |
2016-06-20 |
|
[ 84 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
�
� |
WP 1A
� |
� |
2016-06-13 |
|
[ 83 ]
�
� |
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2016-06-13 |
|
[ 82 ]
�
� |
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2016-06-13 |
|
[ 81 ]
�
� |
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO:fundamental safety principles for protection against non-ionizing radiation
�
� |
SG 1
� |
� |
2016-06-13 |
|
[ 80 ]
�
� |
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...
�
� |
WP 1B
� |
� |
2016-06-13 |
|
[ 79 ]
�
� |
Preparations for WRC-19 agenda item 1.13
�
� |
Chairmen, WPs 4A and 4B
� |
AI1.13
� |
2016-06-10 |
|
[ 78 ]
�
� |
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
�
� |
WP 1A
� |
AI1.15
� |
2016-06-08 |
|
[ 77 ]
�
� |
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D
�
� |
Chairmen, SG 3, WP 3J, WP 3K and WP 3M
� |
AI1.13
� |
2016-06-01 |
|
[ 76 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16
�
� |
WP 5A
� |
AI1.16
� |
2016-05-25 |
|
[ 75 ]
�
� |
Reply liaison statement to Working Party 6B on Global Platform for the Broadcasting Service (copy for information to ITU-R WPs 4A, 4B and 5B, 5C, 5D, ITU-T SGs 9 and 16)
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 74 ]
�
� |
Liaison response to ITU-T SG 17 (copy to Working Parties 4A, 4B, 4C and 5D) - Network security requirements for Public Protection and Disaster Relief and Emergency Communication
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 73 ]
�
� |
Liaison statement to Working Party 4A (copied to Working Parties 5B, 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 72 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5A
� |
AI1.7
� |
2016-05-25 |
|
[ 71 ]
�
� |
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
�
� |
WP 5A
� |
� |
2016-05-25 |
|
[ 70 ]
�
� |
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Preparation for WRC-19 agenda item 1.13
�
� |
TG 5/1
� |
AI1.13
� |
2016-05-25 |
|
[ 69 ]
�
� |
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M, 4A, 4B, 4C, 5A, 5B and 6A) - WRC-19 agenda item 1.7
�
� |
WP 5C
� |
1.7
� |
2016-05-24 |
|
[ 68 ]
�
� |
Liaison statement to Working Parties 3K & 3M (copy for information to Working Parties 5A, 5C, 5D, 4A, 4C, 7B and 7D) - Questions for Working Parties 3K and 3M on ITU-R propagation Recommendations used by Working Party 5B
�
� |
WP 5B
� |
� |
2016-05-23 |
|
[ 67 ]
�
� |
Liaison statement to Working Party 4A - Technical characteristics of aeronautical mobile service systems including aeronautical mobile telemetry in the frequency bands 4 500-4 800 MHz and 5 925-6 425 MHz
�
� |
WP 5B
� |
� |
2016-05-23 |
|
[ 66 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5D) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]
�
� |
WP 5C
� |
� |
2016-05-20 |
Results:915 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):