International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5B� C�

ITU-R�WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:813 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 13 ]
Working document towards a preliminary draft new ITU-R Report M.[RNSS-RDS] - Compatibility of the radionavigation-satellite service with radiodetermination service system receivers in the 1 215-1 300 MHz band � United States of America 2008-01-25
[ 12 ]
Working document toward development of a methodology for assessing radar performance in the presence of radionavigation satellite service (RNSS) signal in the 1 215-1 300 MHz band � United States of America 2008-01-25
[ 11 ]
Characteristics and spectrum requirements for Unmanned Aircraft Systems (UAS) � United States of America 2008-01-25
[ 10 ]
Proposed revisions to Recommendation ITU-R M.493-12 � United States of America 2008-01-25
[ 9 ]
Working document towards a preliminary draft new Recommendation - Mathematical models for radiodetermination radar systems radiation patterns for use in interference analyses � United States of America 2008-01-25
[ 8 ]
Liaison statement to WP 5B - AIS search and rescue transmitter (AIS-SART) � International Electrotechnical Commission, TC 80 2008-01-25
[ 7 ]
Example of maritime broadband VHF data system � Telenor ASA 2008-01-25
[ 6 ]
Preparation of the CPM Report to WRC-11 following the results of the first session of CPM-11 � Chairman, CPM-11 2008-01-29
[ 5 ]
Some aspects regarding the implementation of Resolution 647 (WRC-07) : establishment of a database of available frequencies for use in emergency situations � Director, BR 2008-01-17
[ 4 ]
Implementation of Resolution 355 (WRC-07) concerning the Maritime Manual � Director, BR 2008-01-17
[ 3 ]
Recommendation to be brought to the attention of Study Groups 1, 3, 4 and 5 � BR Study Group Department 2008-01-16
[ 2 ]
Provisional attribution of the Study Group 5 texts to the Working Parties � Chairman, SG 5 2007-12-14
[ 1 ]
Documents to be carried over from the 2003-2007 study period � WP 8B 2007-12-06
Results:813 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2012-04-30