Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 163 ]
�
� |
Comments on version 0.2 of G.smx
�
� |
BT
� |
Q10/15
� |
2006-10-19 |
|
[ 162 ]
�
� |
Proposal of updating G.8131 (SNC protection)
�
� |
Fujitsu
� |
Q9/15
� |
2006-10-19 |
|
[ 161 ]
�
� |
Consideration of APS protocol and protection architectures for G.8131
�
� |
Fujitsu
� |
Q9/15
� |
2006-10-19 |
|
[ 160 ]
�
� |
Proposed scope of G.8110.1 Amendment 1
�
� |
Fujitsu
� |
Q12/15
� |
2006-10-19 |
|
[ 159 ]
�
� |
Proposed TTL description for G.8110.1 Amendment 1
�
� |
Fujitsu
� |
Q9/15, Q12/15
� |
2006-10-19 |
|
[ 158 ]
�
� |
Consideration on T-MPLS OAM architecture for G.8110.1 Amendment 1
�
� |
Fujitsu
� |
Q12/15
� |
2006-10-19 |
|
[ 157 ]
�
� |
Considerations on extending Recommendation G.695 to bitrates beyond 2.5 Gbit/s
�
� |
Finisar
� |
Q6/15
� |
2006-10-19 |
|
[ 156 ]
�
� |
Comments on Draft Rec. G.650.3
�
� |
NTT
� |
Q5/15
� |
2006-10-19 |
|
[ 155 ]
�
� |
Proposal on definition of SBS threshold
�
� |
NTT
,
CLPAJ
� |
Q5/15
� |
2006-10-19 |
|
[ 154 ]
�
� |
Proposed modification to ODTU23 frame format and mapping of ODU2 in G.709
�
� |
ETRI
� |
Q11/15
� |
2006-10-19 |
|
[ 153 ]
�
� |
VDSL2: Proposed Framework for Enabling Downstream FEXT Cancellation in VDSL2
�
� |
Conexant Systems
� |
Q4/15
� |
2006-10-19 |
|
[ 152 ]
�
� |
Power Load Management M.E.
�
� |
Huawei Technologies
� |
Q2/15
� |
2006-10-19 |
|
[ 151 ]
�
� |
Path Degradation in Packet Transport Network
�
� |
Huawei Technologies
� |
Q9/15, Q12/15
� |
2006-10-19 |
|
[ 150 ]
�
� |
Proposal for G.984.4 modelling of SDH over GEM
�
� |
Huawei Technologies
� |
Q2/15
� |
2006-10-19 |
|
[ 149 ]
�
� |
VDSL2: Key issues to emergency rate reduction(SOS)
�
� |
MII China
,
Huawei Technologies
� |
Q4/15
� |
2006-10-19 |
|
[ 148 ]
�
� |
VS Tunnel Multiplexing and Services Discussion
�
� |
Huawei Technologies
,
Siemens AG
,
China Telecom
� |
Q12/15
� |
2006-10-19 |
|
[ 147 ]
�
� |
Proposed text for G.7716 draft
�
� |
Huawei Technologies
� |
Q14/15
� |
2006-10-19 |
|
[ 146 ]
�
� |
Proposal for TCM in G.8110.1
�
� |
Huawei Technologies
� |
Q12/15
� |
2006-10-19 |
|
[ 145 ]
�
� |
Propose to add RPR/TM adaptation function
�
� |
Huawei Technologies
� |
Q12/15
� |
2006-10-19 |
|
[ 144 ]
�
� |
Shared Bandwidth Rate Control
�
� |
Huawei Technologies
� |
Q12/15, Q9/15
� |
2006-10-19 |
|
[ 143 ]
�
� |
Proposal for FC over T-MPLS
�
� |
Huawei Technologies
� |
Q12/15
� |
2006-10-19 |
|
[ 142 ]
�
� |
Proposal for E-Tree service in G.8011
�
� |
Huawei Technologies
� |
Q11/15
� |
2006-10-19 |
|
[ 141 ]
�
� |
Proposed Functional Requirements for Automatic Synchronization Distribution
�
� |
Huawei Technologies
� |
Q13/15
� |
2006-10-19 |
|
[ 140 ]
�
� |
Proposal for TCM in G.798
�
� |
Huawei Technologies
� |
Q11/15, Q9/15
� |
2006-10-19 |
|
[ 139 ]
�
� |
Corrigendum to G.7043/Y.1343
�
� |
Huawei Technologies
� |
Q11/15
� |
2006-10-19 |
|
[ 138 ]
�
� |
Proposals for application code and Physical layer parameters and values for G.dapp2 applications
�
� |
Huawei Technologies
� |
Q6/15
� |
2006-10-19 |
|
[ 137 ]
�
� |
Proposal for TCM in G.709
�
� |
Huawei Technologies
� |
Q9/15, Q11/15
� |
2006-10-19 |
|
[ 136 ]
�
� |
Proposal for sequencing TCM levels in G.798
�
� |
Huawei Technologies
� |
Q11/15, Q9/15
� |
2006-10-19 |
|
[ 135 ]
�
� |
Comments on draft G.dapp2 version 0.31
�
� |
Huawei Technologies
� |
Q6/15
� |
2006-10-19 |
|
[ 134 ]
�
� |
Clarification to questions raised to WD23 at Ottawa Q13/15 Meeting that was held June 19 - 23, 2006 in Ottawa, Canada
�
� |
Huawei Technologies
� |
Q13/15
� |
2006-10-19 |
|
[ 133 ]
�
� |
Automatic Sync Distribution Technique
�
� |
Huawei Technologies
� |
Q13/15
� |
2006-10-19 |
|
[ 132 ]
�
� |
VDSL2: Work Items on In-Domain FEXT Cancellation
�
� |
MII China
,
Huawei Technologies
� |
Q4/15
� |
2006-10-19 |
|
[ 131 ]
�
� |
Data on the macrobending loss ratio at 1550 nm vs 1625 nm of G.smx class A single mode fibres at 15 mm radius
�
� |
Draka Comteq
� |
Q5/15, Q10/5
� |
2006-10-19 |
|
[ 130 ]
�
� |
Proposal on new document regarding the general characteristics of an optical fibre operation
�
� |
NTT
� |
Q5/15
� |
2006-10-19 |
|
[ 129 ]
�
� |
Revised proposal for extended VSR applications at 40 Gb/s in G.959.1
�
� |
Lucent Technologies
� |
Q6/15
� |
2006-10-19 |
|
[ 128 ]
�
� |
Proposal for new 10G application codes in G.dapp2
�
� |
Lucent Technologies
� |
Q6/15
� |
2006-10-19 |
|
[ 127 ]
�
� |
Proposal for new 2.5G application codes in G.dapp2
�
� |
Lucent Technologies
� |
Q6/15
� |
2006-10-19 |
|
[ 126 ]
�
� |
Importance of time-of-day in packet-switched networks
�
� |
Symmetricom
� |
Q13/15
� |
2006-10-19 |
|
[ 125 ]
�
� |
Proposal on questionnaire for collecting the latest cable ship information
�
� |
NTT
� |
Q8/15
� |
2006-10-19 |
|
[ 124 ]
�
� |
Comments on draft G.smx
�
� |
NTT
,
CLPAJ
� |
Q5/15, Q10/15
� |
2006-10-19 |
|
[ 123 ]
�
� |
Proposal on chromatic dispersion on G.mmx
�
� |
NTT
,
CLPAJ
� |
Q10/15
� |
2006-10-19 |
|
[ 122 ]
�
� |
Comments on the Reference Macrobend Loss Measurement for Class A Fiber
�
� |
OFS-Fitel
� |
Q10/15
� |
2006-10-19 |
|
[ 121 ]
�
� |
Way forward to improve the SBS measurement guidance given by G.650.2
�
� |
OFS-Fitel
� |
Q5/15
� |
2006-10-19 |
|
[ 120 ]
�
� |
Proposed corrections and clarifications to the protection architectures and APS protocols in G.808.1 and next version of G.8031
�
� |
Republic of Korea
� |
Q9/15
� |
2006-10-18 |
|
[ 119 ]
�
� |
A Proposal for additional protection types operating without APS in G.8031
�
� |
Republic of Korea
� |
Q9/15
� |
2006-10-18 |
|
[ 118 ]
�
� |
40 Gbit/s modulation format for G.dapp2
�
� |
Republic of Korea
� |
Q6/15
� |
2006-10-18 |
|
[ 117 ]
�
� |
VDSL2: Loop Diagnostic Mode: Duration of MEDLEY
�
� |
Aware
� |
Q4/15
� |
2006-10-18 |
|
[ 116 ]
�
� |
VDSL2: Proposal for a VDSL2 Data Retransmission Protocol
�
� |
Aware
� |
Q4/15
� |
2006-10-18 |
|
[ 115 ]
�
� |
ADSL2/2plus: REIN Testing
�
� |
Aware
� |
Q4/15
� |
2006-10-18 |
|
[ 114 ]
�
� |
Discussion on G.8261, G.paclock and G.pacmod scope
�
� |
Ericsson
� |
Q13/15
� |
2006-10-18 |
Resultats:913 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):