International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5D : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5D� C�

ITU-R�WP5D

IMT Systems

Results:1310 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 560 ]
Liaison statement from TDAG to RAG and ITU-R Study Groups 1 and 5 on cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014) � TDAG 2017-05-18
[ 559 ]
Information Note to Working Parties 5A, 5B, 5C and 5D - Protection criteria of the fixed and mobile services for the VHF/UHF multilateral coordination in the Central American and Caribbean areas � Director, BR 2017-05-16
[ 558 ]
WBA liaison statement - Connected City Blueprint (version1) � Director, BR 2017-05-16
[ 557 ]
Answer to liaison statement to External Organizations on further information on the invitation for submission of proposals for candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-2020 and invitation to participate in their subsequent evaluation � Alliance for Telecommunications Industry Solutions 2017-05-12
[ 556 ]
(Rev.1)
Answer to liaison statement to External Organizations on the schedule for updating Recommendation ITU-R M.1457 to Revision 14 � Alliance for Telecommunications Industry Solutions 2017-05-12
[ 555 ]
Reply liaison statement to Working Party 5D (copy for information to Working Party 4A) - Protection of radionavigation-satellite service receiving earth stations operating in the frequency bands 1 164 1 215 MHz, 1 215 1 300 MHz and 1 559-1 610 MHz from spurious emissions of IMT stations in the frequency bands below 3 GHz � WP 4C 2017-05-04
[ 554 ]
Reply liaison statement to Working Party 1B on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (Copy to Working Parties 4A, 5A, 5C and 5D) - Regulatory tools to support enhanced shared use of the spectrum � WP 4C 2017-05-04
[ 553 ]
Liaison statement to TDAG (copy to ITU-R Study Grop 1 and to ITU-R Working Parties 5A and 5D for information) - Cooperation and coordination between ITU-R and ITU-D on WTDC Resolution 9 (Rev. Dubai, 2014) � Radiocommunication Advisory Group (RAG) 2017-05-01
[ 552 ]
Liaison statement to ITU-R Working Party 5D - Frequency arrangement of 470-699 MHz for IMT and revision of ITU-R Recommendation M.1036 � Asia-Pacific Telecommunity 2017-04-20
[ 551 ]
Liaison statement - Connected city blueprint � Director, BR 2017-04-24
[ 550 ]
Answer to liaison statement to External Organisations on preliminary draft revision of Report ITU-R SM.2351-1 on smart grid utility management systems � Telefon AB - LM Ericsson , Huawei Technologies Co. Ltd. , Qualcomm, Inc. , Telecom Italia S.p.A. 2017-04-19
[ 549 ]
Liaison statement to Working Party 5B and Task Group 5/1 (copied for information to Working Parties 5A, 5C and 5D) - Update on the preliminary draft new Recommendation ITU-R M.[AMS-CHAR 24] � WP 7B 2017-04-20
[ 548 ]
Answer to liaison on invitation to consider integration of satellite-based solutions into IMT-2020 networks � Dish Network , Telefon AB - LM Ericsson , Thales SA 2017-04-19
[ 547 ]
Answer to liaison statement to 3GPP on Intelligent Transport Systems (ITS) � Telefon AB - LM Ericsson , Huawei Technologies Co. Ltd. , Qualcomm, Inc. , Telecom Italia S.p.A. 2017-04-19
[ 546 ]
Note to Chairman of Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Microsoft EXCEL implementation of clutter loss and building entry loss calculations � Chairmen, SG 3 and WPs 3J, 3K & 3M 2017-04-13
[ 545 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7 � WP 7B 2017-04-13
[ 544 ]
Liaison statement to Task Group 5/1 for WRC-19 agenda item 1.13 (copy for information to Working Party 5D) � WP 7B AI1.13 2017-04-11
[ 543 ]
Liaison statement to Working Parties 5A, 5B and 5D regarding WRC-19 agenda item 1.3 � WP 7B 2017-04-11
[ 542 ]
Liaison statement to Working Parties 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A (for information) � WP 7B 2017-04-07
[ 541 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A and Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 � WP 7B 2017-04-07
[ 540 ]
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D) - WRC-19 agenda item 1.14 � WP 7B AI1.14 2017-04-07
[ 539 ]
Liaison statement to Study Group 5 - Draft revision to Report ITU-R BT.2337-0 - Sharing and compatibility studies between digital terrestrial television broadcasting and terrestrial mobile broadband applications, including IMT, in the frequency band 470-694/698 MHz � SG 6 2017-04-06
[ 538 ]
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13 � Chairman, WP 6A AI1.13 2017-04-05
[ 537 ]
Liaison statement to ITU-R Working Parties 5A and 5D on global platform � WP 6B Q140/6 2017-04-05
[ 536 ]
Liaison statement on the new structure of ITU-T Study Group 20 � ITU-T SG 20 2017-04-05
[ 535 ]
+Ann.1
Additional information on the preparation of text for the draft CPM Report to WRC-19 � Director, BR 2017-04-04
[ 534 ]
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13 � WPs 3K, 3J and 3M AI1.13 2017-04-03
[ 533 ]
Liaison statement to Working Party 4C (copy for information to Working Party 5D) - Propagation data and predictions for coexistence and compatibility studies between the satellite and terrestrial components of IMT systems in the 2 GHz band � WP 3M 2017-03-31
[ 532 ]
Liaison statement to Working Party 4A (copy for information to Working Parties 4C and 5D) - Propagation model for compatibility study regarding WRC-19 agenda item 9.1, issue 9.1.2 � WPs 3M and 3K 2017-03-31
[ 531 ]
Preliminary position on WRC-19 agenda � World Meteorological Organization 2017-03-20
[ 530 ]
+Ch.1-7
Report on the twenty-sixth meeting of Working Party 5D (Geneva, 14 - 22 February 2017) � Chairman, WP 5D 2017-02-23
[ 529 ]
Final list of participants - Working Party 5D (Geneva, 14-22 February 2017) � Director, BR 2017-02-22
[ 528 ]
IMT2020: How ITU-T Study Group 13 / WP 1 will face 5G challenges � ITU-T SG 13 / WP 1 Co-Chairman 2017-02-15
[ 527 ]
An update on IMT-2020 technology work in ITU-R Working Party 5D for the joint session with ITU-T Study Group 13 � Chairman, WP 5D 2017-02-15
[ 526 ]
Update on recent activities within ATU � ITU Region 1 (ATU) Rapporteur 2017-02-14
[ 525 ]
Update on recent activities within CEPT � ITU Region 1 (CEPT) Rapporteur 2017-02-09
[ 524 ]
Correspondence received regarding the update of Recommendation ITU-R M.2012 to Revision 3 ("Certification B") � Director, BR 2017-02-08
[ 523 ]
Modification proposal on working document towards preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2 � China (People's Republic of) 2017-02-07
[ 522 ]
Comments and modification proposals on the working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] � China (People's Republic of) 2017-02-07
[ 521 ]
Proposed update of the working document towards a preliminary draft new Report M.[IMT.BY.INDUSTRIES] � China (People's Republic of) 2017-02-07
[ 520 ]
Proposal on IMT-2020 channel model � China (People's Republic of) 2017-02-07
[ 519 ]
Proposal on revision of Document IMT-2020/2 � China (People's Republic of) 2017-02-07
[ 518 ]
Consideration on evaluation configuration for IMT-2020 � China (People's Republic of) 2017-02-07
[ 517 ]
Proposal on technical performance requirements for IMT-2020 � China (People's Republic of) 2017-02-07
[ 516 ]
Proposal on the evaluation methodology of IMT-2020 � China (People's Republic of) 2017-02-07
[ 515 ]
Proposed modification of the 450 MHz band to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5 � China (People's Republic of) 2017-02-07
[ 514 ]
Consideration on IMT-2020 network parameters for sharing and compatibility studies for WRC-19 agenda item 1.13 � China (People's Republic of) 2017-02-08
[ 513 ]
Spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz for WRC-19 agenda item 1.13 � China (People's Republic of) 2017-02-07
[ 512 ]
(Rev.1)
Update on activities in Region 3 � Region 3 Rapporteur 2017-02-08
[ 511 ]
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 3 300-3 700 MHz � Colombia (Republic of) 2017-02-07
Results:1310 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2022-06-07