Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 145 ]
�
� |
Proposal on study of energy efficiency metrics of mobile station cell site and best practice for energy saving
�
� |
Huawei Technologies Co. Ltd.
� |
Q17/5
� |
2013-11-18 |
|
[ 144 ]
�
(Rev.1)� |
K.lit: Surge parameters of isolating transformers used in Information and Communications Technology devices and equipment
�
� |
Bourns Limited
,
Institute of Electrical and Electronics Engineers, Inc.
� |
Q4/5, Q2/5
� |
2013-11-18 |
|
[ 143 ]
�
(Rev.1)� |
Questionnaire on EMC requirement for ac mains port below 150kHz
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5
� |
2013-11-18 |
|
[ 142 ]
�
(Rev.1)� |
The importance of keeping a strict requirement approach in the joint ETSI/ITU-T LCA standard"
�
� |
Alcatel-Lucent France
,
Huawei Technologies Co. Ltd.
,
Nokia Solutions and Networks Gmbh & Co. KG
,
Telefon AB - LM Ericsson
� |
Q18/5
� |
2013-11-18 |
|
[ 141 ]
�
(Rev.1-2)� |
Example of disturbance to radio services caused by broadband transmission and proposal for the study of K.mhn
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q8/5
� |
2013-11-18 |
|
[ 140 ]
�
(Rev.1-2)� |
Proposal for revision of K.27 regarding earthing and bonding for 400VDC systems
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q5/5
� |
2013-11-18 |
|
[ 139 ]
�
(Rev.1)� |
Questionnaire on induction problems of optical cables
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q3/5
� |
2013-11-18 |
|
[ 138 ]
�
� |
Proposal for radiation immunity test method in which usage of wireless devices near telecommunication equipment is assumed
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q9/5, Q11/5
� |
2013-11-18 |
|
[ 137 ]
�
(Rev.1)� |
Proposal for revision of K.21
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5
� |
2013-11-18 |
|
[ 136 ]
�
(Rev.1-2)� |
Proposal for draft recommendation of K.appl4
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q2/5
� |
2013-11-18 |
|
[ 135 ]
�
(Rev.1-3)� |
Proposal for K.ntt
�
� |
China Unicom
� |
Q5/5
� |
2013-11-18 |
|
[ 134 ]
�
(Rev.1-2)� |
Failure analysis of home network equipment caused by lightning issues
�
� |
Nippon Telegraph and Telephone Corporation (NTT)
� |
Q4/5, Q2/5
� |
2013-11-18 |
|
[ 133 ]
�
(Rev.`1)� |
Proposal on L.m&m_infra
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
Q17/5
� |
2013-11-18 |
|
[ 132 ]
�
(Rev.1)� |
Proposal on L.DC_assessment
�
� |
Ministry of Industry and Information Technology (MIIT)
� |
QALL/5, Q17/5
� |
2013-11-18 |
|
[ 131 ]
�
(Rev.1-3)� |
Lightning Protection of the Dedicated Transformer for Radio Base Station
�
� |
China Unicom
� |
Q5/5
� |
2013-11-18 |
|
[ 130 ]
�
� |
Theoretical Analysis and Test of EMF in TDFI Bus
�
� |
China Mobile Communications Corporation
� |
Q7/5
� |
2013-11-18 |
|
[ 129 ]
�
� |
Study and proposal for the drafting of K.XXX(Lightning Protection of the Dedicated Transformer for Radio Base Station)
�
� |
China Telecommunications Corporation
� |
Q5/5
� |
2013-11-18 |
|
[ 128 ]
�
(Rev.1-2)� |
China Telecom's proposal for the second draft of new Recommendation K.dbs
�
original withdrawn at special request of the submitter
� |
China Telecommunications Corporation
� |
Q5/5
� |
2013-11-18 |
|
[ 127 ]
�
(Rev.1)� |
Proposal for the drafting of a new recommendation K.SENS
�
� |
China Telecommunications Corporation
� |
Q9/5
� |
2013-11-18 |
|
[ 126 ]
�
(Rev.1)� |
Proposal for the drafting of a new recommendation K.GENV
�
� |
China Telecommunications Corporation
� |
Q7/5
� |
2013-11-18 |
|
[ 125 ]
�
� |
Consideration points to develop common understandings on defining the functional unit, reference flow and unit process in ITU-T L.1410
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q18/5
� |
2013-11-18 |
|
[ 124 ]
�
� |
Proposal of reference value for routers and switch
�
� |
Huawei Technologies Co. Ltd.
� |
Q17/5
� |
2013-11-16 |
|
[ 123 ]
�
� |
Requirements on a standardised mobile device eco-rating
�
� |
Huawei Technologies Co. Ltd.
� |
Q16/5
� |
2013-11-16 |
|
[ 122 ]
�
� |
View on Specifications and Criteria for Mobile Phone Eco-Rating
�
� |
Huawei Technologies Co. Ltd.
� |
Q16/5
� |
2013-11-16 |
|
[ 121 ]
�
� |
Criteria advancement for Basic LCA Specification in Mobile Phone Eco-Rating
�
� |
Huawei Technologies Co. Ltd.
� |
Q16/5
� |
2013-11-16 |
|
[ 120 ]
�
� |
Huawei's view on the current state of mobile eco rating
�
� |
Huawei Technologies Co. Ltd.
� |
Q16/5
� |
2013-11-16 |
|
[ 119 ]
�
(Rev.1)� |
The role of the ITU/ETSI LCA standard for ICT in global environmental policy
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 118 ]
�
(Rev.1)� |
The strengths and limitations of LCA to quantify the GHG change induced by a shift from single servers to virtual machines
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 117 ]
�
� |
Suggestion text for 9 Data quality requirements in L.1410 update
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 116 ]
�
� |
Suggestion for text for 6.2.5 Data quality requirements in L.1410 update
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 115 ]
�
� |
Suggestion for text for Section 6.2.4 Cut-off in L.1410 update
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 114 ]
�
� |
Suggestion for 6.2.3. System boundaries in L.1410 update
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 113 ]
�
� |
Suggestion for. General introduction in L.1410 update
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 112 ]
�
� |
Overall uncertainty in LCA results: Procedure and formula for simplified calculation of the relative error
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 111 ]
�
� |
Allocation of material usage and recycling in LCA
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 110 ]
�
� |
Estimation of ICT Sector and Entertainment&Media Sector global electricity footprints from 2012-2017
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-15 |
|
[ 109 ]
�
� |
The role of cloud computing, telepresence and telecommuting for reducing energy usage
�
� |
Huawei Technologies Co. Ltd.
� |
Q18/5
� |
2013-11-14 |
|
[ 108 ]
�
� |
Eco-rating recommendations on LCA approach (manufacture, transport, use and end-of-life phases)
�
� |
Orange
� |
Q16/5
� |
2013-11-14 |
|
[ 107 ]
�
� |
Proposal for a modified scope of the L.Eco-Rating Recommendation
�
� |
Alcatel-Lucent France
� |
Q16/5
� |
2013-11-14 |
|
[ 106 ]
�
� |
Energy Assessment Methodologies for Telecommunications Services
�
� |
Alcatel-Lucent France
� |
Q18/5
� |
2013-11-14 |
|
[ 105 ]
�
(Rev.1)� |
Q7/5 -EMF Guide - Draft Scope & Contents List
�
� |
Telstra Corporation Ltd.
� |
Q7/5
� |
2013-11-10 |
|
[ 104 ]
�
� |
ITU/UNESCO Events in Uruguay (11-14 March 2014)
�
� |
Uruguay
� |
QALL/5
� |
2013-11-08 |
|
[ 103 ]
�
(Rev.1)� |
K21 Edits
�
� |
Littelfuse UK Ltd.
� |
Q4/5
� |
2013-11-05 |
|
[ 102 ]
�
(Rev.1)� |
Step Testing Topic (under voltage testing)
�
� |
Littelfuse UK Ltd.
� |
Q4/5
� |
2013-11-05 |
|
[ 101 ]
�
(Rev.1)� |
Coordination Topic
�
� |
Littelfuse UK Ltd.
� |
Q4/5
� |
2013-11-04 |
|
[ 100 ]
�
(Rev.1)� |
Ringing Waveforms
�
� |
Littelfuse UK Ltd.
� |
Q4/5
� |
2013-11-04 |
|
[ 99 ]
�
(Rev.1)� |
Inputs for Handbook on Setting up Low-Cost Sustainable Telecommunication Infrastructure for Rural Communications in Developing Countries
�
� |
India
� |
Q14/5
� |
2013-11-01 |
|
[ 98 ]
�
(Rev.1)� |
Electro Magnetic Field from Mobile Communications Tower - Monitoring mechanism
�
� |
India
� |
Q7/5
� |
2013-11-01 |
|
[ 97 ]
�
(Rev.1)� |
Issues in implementation of new Electro Magnetic Field Emission norms with 1/10th of ICNIRP norms
�
� |
India
,
Ministry of Communications and Information Technology
� |
Q7/5
� |
2013-11-01 |
|
[ 96 ]
�
(Rev.1)� |
Mobile Coverage Provisioning for Uncovered Rural Areas of India :
GREEN TELECOM USO Initiatives
�
� |
India
,
Ministry of Communications and Information Technology
� |
Q14/5
� |
2013-10-31 |
Resultats:845 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):