Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 480 ]
�
� |
Contribute to ITU-R Working Party 5D supplement to update the guidelines on the smooth transition of existing mobile networks to IMT-2000 for developing counties (GST)
�
� |
China (People's Republic of)
� |
� |
2009-06-03 |
|
[ 479 ]
�
� |
Frequency arrangements for 2 300-2 400 MHz
�
� |
New Zealand
� |
� |
2009-06-03 |
|
[ 478 ]
�
� |
Software implementation of IMT.EVAL channel model
�
� |
Finland
� |
� |
2009-06-03 |
|
[ 477 ]
�
� |
Implementation guidelines for using IMT-Advanced channel model of Report ITU-R M.2135
�
� |
China (People's Republic of)
,
Japan
,
Korea (Republic of)
� |
� |
2009-06-03 |
|
[ 476 ]
�
� |
C-Code for Report ITU-R M.2135 - Channel model implementation
�
� |
Korea (Republic of)
� |
� |
2009-06-03 |
|
[ 475 ]
�
� |
Proposed modification on the outline of ITU-R Working Party 5D supplement to update the Question 18-1/2 GST and update of relevant ITU-R Handbook
�
� |
Korea (Republic of)
� |
� |
2009-06-03 |
|
[ 474 ]
�
� |
Information on the APT Wireless Forum development of UHF digital dividend band plan
�
� |
Korea (Republic of)
� |
229-2/5
� |
2009-06-03 |
|
[ 473 ]
�
� |
For the reply liaison statement to Working Party 4A on preliminary draft new Recommendation ITU-R S.[IMT-PFD]
�
� |
Korea (Republic of)
� |
� |
2009-06-03 |
|
[ 472 ]
�
� |
Views on revision of Recommendation ITU-R M.1457-9
�
� |
United Arab Emirates
� |
� |
2009-06-03 |
|
[ 471 ]
�
� |
Cognitive radio for IMT technical characteristics and functionalities of cognitive radio systems
�
� |
France
� |
� |
2009-06-03 |
|
[ 470 ]
�
� |
Providing a liaison reply to Working Parties 5A and 1B in response to Documents 5D/419 and 5D/457
�
� |
Chairman, WP 5D
� |
� |
2009-06-02 |
|
[ 469 ]
�
� |
Guidelines for using IMT-Advanced channel models
�
� |
Finland
� |
229-2/5
� |
2009-06-02 |
|
[ 468 ]
�
� |
Proposal of actions for IMT-Advanced development at the 5th Working Party 5D Meeting
�
� |
China (People's Republic of)
,
Japan
,
Korea (Republic of)
� |
229-2/5
� |
2009-06-02 |
|
[ 467 ]
�
� |
Considerations on frequency arrangements for IMT in the band 3 400-3 600 MHz
�
� |
Japan
� |
229-2/5
� |
2009-06-02 |
|
[ 466 ]
�
� |
Activities towards submission of candidate radio interface technologies for IMT-Advanced in Japan
�
� |
Japan
� |
229-2/5
� |
2009-06-02 |
|
[ 465 ]
�
(Rev.1)� |
Working Party 5D request for information on Femtocells
�
� |
Director, BR
� |
� |
2009-06-02 |
|
[ 464 ]
�
� |
Liaison statement - IMT parameters for the band 790-862 MHz
�
� |
JTG 5-6
� |
� |
2009-06-01 |
|
[ 463 ]
�
� |
Proposal for a liaison statement to ITU-R Working Parties 5A and 1B on the study of software-defined radio (SDR) and cognitive radio systems (CRS)
�
� |
United States of America
� |
� |
2009-05-28 |
|
[ 462 ]
�
� |
Change proposals to Annexes in Recommendation ITU-R M.1036
�
� |
UMTS Forum
� |
� |
2009-05-28 |
|
[ 461 ]
�
� |
New proposed considerations for Recommendation ITU-R M.1036
�
� |
UMTS Forum
� |
� |
2009-05-28 |
|
[ 460 ]
�
� |
Liaison statement to ITU-R Study Group 15 on ANTS (copy for information to ITU-R Working Party 5D)
�
� |
WP 5A
� |
� |
2009-05-28 |
|
[ 459 ]
�
� |
Liaison statement to Working Party 5D copy to Working Parties 5A and 5B for information - Applicability of Recommendation ITU-R F.1336-2 for sectoral antenna patterns approximation
�
� |
WP 5C
� |
� |
2009-05-28 |
|
[ 458 ]
�
� |
Progression of the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-3 - Frequency arrangements for implementation of the terrestrial component of International Mobile Telecommunications (IMT) in the bands identified for IMT in the Radio Regulations (RRs)
�
� |
Canada
� |
229-2/5
� |
2009-05-28 |
|
[ 457 ]
�
� |
Liaison statement to Working Party 1B on the study of software-defined radio and cognitive radio systems (copy for information to WPs 5B, 5C and 5D)
�
� |
WP 5A
� |
� |
2009-05-28 |
|
[ 456 ]
�
� |
Construction of the web page for the analytical list of the Study Group 5 Recommendations
�
� |
Chairman, SG 5
� |
� |
2009-05-27 |
|
[ 455 ]
�
� |
Comments on Femtocells
�
� |
Director, BR
� |
� |
2009-05-27 |
|
[ 454 ]
�
� |
Change proposals for Recommendation ITU-R M.1036
�
� |
Finland
� |
� |
2009-05-27 |
|
[ 453 ]
�
� |
Considerations on M.1457 - Technologies, Chapter titles and document structure
�
� |
Israel (State of)
� |
229-1/8
� |
2009-05-27 |
|
[ 452 ]
�
� |
Revisions of Recommendations ITU-R M.1580-3 and ITU-R M.1581-3
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 451 ]
�
� |
On the optimum structure of Section 5.6 in the draft revision 9 of Recommendation ITU-R M.1457
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 450 ]
�
� |
On the applicability of the results in document 5/129 to sharing of CDMA DS and the FDD component of OFDMA TDD WMAN in adjacent channels in the same geographical area
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 449 ]
�
� |
On sharing of CDMA-DS and FDD component of OFDMA TDD WMAN in adjancent channels in the band 790-862 MHz in the same geographical area
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 448 ]
�
� |
Answers to Questions from Germany (Doc. 5D/422) on information on Sections 5.2 and 5.6 as requested in Document 5D/413, Chapter 1, Section 3.1
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 447 ]
�
� |
Answer to Questions from France (5D/421) on revision 9 of Recommendation ITU-R M.1457
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 446 ]
�
� |
Response to the liaison statement from Working Party 5D on Femtocells
�
� |
WiMAX Forum
� |
� |
2009-05-27 |
|
[ 445 ]
�
� |
Considerations for harmonized frequency arrangements for planning of UHF bands
�
� |
India (Republic of)
� |
� |
2009-05-26 |
|
[ 444 ]
�
� |
Response to liaison statement from Working Party 5D on IMT parameters in the 790-862 MHz band
�
� |
IEEE
� |
� |
2009-05-26 |
|
[ 443 ]
�
� |
On submission of candidate IMT-Advanced RIT based on IEEE Project 802.16m
�
� |
IEEE
� |
229-2/5
� |
2009-05-26 |
|
[ 442 ]
�
� |
Update of OFDMA TDD WMAN in Revision 9 of Recommendation ITU-R M.1457
�
� |
IEEE
� |
229-2/5
� |
2009-05-26 |
|
[ 441 ]
�
� |
Contribution to ITU-R Working Party 5D regarding Document 5D/421
�
� |
IEEE
� |
229-2/5
� |
2009-05-26 |
|
[ 440 ]
�
� |
Contribution to ITU-R Working Party 5D regarding Document 5D/422R1
�
� |
IEEE
� |
229-2/5
� |
2009-05-26 |
|
[ 439 ]
�
� |
Regarding the updates of Recommendation ITU-R M.1457
�
� |
Director, BR
� |
� |
2009-05-22 |
|
[ 438 ]
�
� |
Proposed update of Section 5.2 of Recommendation ITU-R M.1457-8
�
� |
Director, BR
� |
� |
2009-05-22 |
|
[ 437 ]
�
� |
Response to the comments in Document 5D/421 regarding revision 9 of Recommendation ITU-R M.1457
�
� |
Director, BR
� |
� |
2009-05-22 |
|
[ 436 ]
�
� |
Response to the comments in Document 5D/422 (Rev.1) regarding revision 9 of Recommendation ITU-R M.1457
�
� |
Director, BR
� |
� |
2009-05-22 |
|
[ 435 ]
�
� |
Liaison statement on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan
�
� |
ITU-T SG 15
� |
� |
2009-05-20 |
|
[ 434 ]
�
� |
Liaison statement on draft baseline text of G.hntreq "Requirements of transport functions in IP home network"
�
� |
ITU-T SG 15
� |
� |
2009-05-20 |
|
[ 433 ]
�
� |
Response to the liaison statement from ITU-R Working Party 5D on request for information on Femtocells
�
� |
ETSI
� |
� |
2009-05-18 |
|
[ 432 ]
�
� |
Liaison statement to Working Party 5D - Preliminary draft new Recommendation
ITU-R S.[IMT-PFD] on methodologies for determining whether an IMT base station at a given location operating in the band 3 400-3 600 MHz would transmit without exceeding the PFD limits in RR Nos. 5.430A, 5.432A, 5.432B and 5.433A of the Radio Regulations
�
� |
WP 4A
� |
� |
2009-05-11 |
|
[ 431 ]
�
� |
Liaison Statement to ITU-R Working Party 5D
�
� |
ITU-D SG2
� |
� |
2009-05-05 |
Resultados :1180 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):