Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 263 ]
�
� |
G.hn: On the home network topology
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 262 ]
�
� |
G.VDSL2: Correction to the formula for computing received virtual noise from TXREFVN parameter
�
� |
Infineon Technologies
� |
Q4/15
� |
2006-10-20 |
|
[ 261 ]
�
� |
Proposal of a generic Home Network architecture on the transport stratum
�
� |
NTT
� |
Q1/15
� |
2006-10-20 |
|
[ 260 ]
�
� |
Channel/senders/receivers complex model
�
� |
Alcatel
� |
Q12/15
� |
2006-10-20 |
|
[ 259 ]
�
� |
Unifying G.805 and G.809
�
� |
Lucent Technologies UK
,
KPN
� |
Q12/15
� |
2006-10-20 |
|
[ 258 ]
�
� |
Discussion on macrobending loss specification for G.mmx
�
� |
Draka Comteq
� |
Q5/15, Q10/15
� |
2006-10-20 |
|
[ 257 ]
�
� |
G.vdsl: VDSL2 Impulse Noise Monitor Performance/Accuracy Requirements
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 256 ]
�
� |
G.gen: G.vdsl: G.ploam: Full Proposed Text for VDSL2 Impulse Noise Monitor
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 255 ]
�
� |
G.vdsl: VDSL2 Initialization Success/Failure Code DRAFT
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 254 ]
�
� |
G.gen: G.vdsl: G.ploam: VDSL2 Reporting of Actual Impulse Noise Protection
�
� |
Alcatel Bell
� |
Q4/15
� |
2006-10-20 |
|
[ 253 ]
�
� |
Clock bandwidth considerations for G.paclock
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 252 ]
�
� |
Text changes for Appendix VIII of Recommendation G.8261
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 251 ]
�
� |
Appendix VI/Test Case 8: Can G.8261 masks be met
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 250 ]
�
� |
Clarifications and text changes for Appendix VI of G.8621
�
� |
Israel MOC
� |
Q13/15
� |
2006-10-20 |
|
[ 249 ]
�
� |
WDM interface with a total capacity of 100 Gbit/s
�
� |
Deutsche Telekom
� |
Q6/15
� |
2006-10-20 |
|
[ 248 ]
�
� |
Synchronisation Modelling Components - Time
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 247 ]
�
� |
Synchronous Ethernet Equipment Clock - Selection Function
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 246 ]
�
� |
Synchronisation Modelling - Frequency and Time Converging
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 245 ]
�
� |
Synchronous Ethernet - Synchronisation Status Message (SSM) Delay Analysis
�
� |
BT
� |
Q13/15
� |
2006-10-20 |
|
[ 244 ]
�
� |
Ethernet Ring Protection
�
� |
Siemens
� |
Q9/15
� |
2006-10-20 |
|
[ 243 ]
�
� |
Proposal to continue work on 10GbE bit rates
�
� |
Cisco Systems
� |
Q14/15, Q12/15, Q11/15
� |
2006-10-20 |
|
[ 242 ]
�
� |
Impact of T-MPLS on a carrier operations group
�
� |
Cisco Systems
� |
Q14/15, Q12/15, Q11/15, Q9/15
� |
2006-10-20 |
|
[ 241 ]
�
� |
Two customer needs of 10GbE LAN PHY transport: one can be fulfilled by using existing standards and the other needs new standards
�
� |
Japan
� |
Q11/15
� |
2006-10-20 |
|
[ 240 ]
�
� |
Engagement of ITU-T SG15 with IEEE 802.3 Higher Speed Study Group (802.3 HSSG) in consideration of current 802.3 HSSG efforts to define objectives for Higher Speed Ethernet
�
� |
AT&T
,
Sprint Nextel
,
Verizon
� |
Q12/15, Q11/15, Q9/15, Q6/15
� |
2006-10-20 |
|
[ 239 ]
�
� |
Proposal of wavelength-selective-switch-based photonic cross-connect for transparent optical network systems in G.otf
�
� |
NTT
� |
Q6/15
� |
2006-10-20 |
|
[ 238 ]
�
� |
Proposals for Definitions and Appendix to support revision of G.666 (ex G.PMDC)
�
� |
Alcatel
� |
Q7/15
� |
2006-10-20 |
|
[ 237 ]
�
� |
Proposal to discuss on OSNR sensitivity data at applications for narrow spectral excursion at new G.dapp2
�
� |
Alcatel
� |
Q6/15
� |
2006-10-20 |
|
[ 236 ]
�
� |
Proposals for application code with wide spectral excursion at G.dapp2
�
� |
Alcatel
� |
Q6/15
� |
2006-10-20 |
|
[ 235 ]
�
� |
Ethernet protection and physical constraints
�
� |
BT
� |
Q9/15
� |
2006-10-20 |
|
[ 234 ]
�
(Rev.1)� |
All-Japan interoperability trial of full-transparent 10GbE LAN PHY transport
�
Rev1: Correction of a template issue causing the seventh contact not to appear
� |
Japan
� |
Q11/15
� |
2006-10-20 |
|
[ 233 ]
�
� |
Proposal for T-MPLS MIP Identification
�
� |
Alcatel
� |
Q12/15, Q9/15
� |
2006-10-20 |
|
[ 232 ]
�
� |
100 Gbit/s interface
�
� |
Alcatel
� |
Q11/15, Q9/15
� |
2006-10-20 |
|
[ 231 ]
�
� |
Multi-layer T-MPLS network architecture and layer network signal formats
�
� |
Alcatel
� |
Q12/15, Q11/15
� |
2006-10-20 |
|
[ 230 ]
�
� |
Comments on and proposals for G.650.2
�
� |
Deutsche Telekom
� |
Q5/15
� |
2006-10-20 |
|
[ 229 ]
�
� |
Definitions in G.666
�
� |
Deutsche Telekom
� |
Q7/15
� |
2006-10-20 |
|
[ 228 ]
�
� |
Work Load of Q12/15 - Proposal for advanced working methods
�
� |
Alcatel
� |
Q12/15
� |
2006-10-20 |
|
[ 227 ]
�
� |
Protocol extension for automatic discovery in OTN networks
�
� |
ETRI
� |
Q14/15
� |
2006-10-20 |
|
[ 226 ]
�
� |
Time distribution in synchronization networks
�
� |
Nortel Networks (USA)
� |
Q13/15
� |
2006-10-20 |
|
[ 225 ]
�
� |
SSM behaviour for packet networks
�
� |
Nortel Networks (USA)
� |
Q13/15
� |
2006-10-20 |
|
[ 224 ]
�
� |
Network limits for 1544 kbit/s interface description in G.8261
�
� |
USA
� |
Q13/15
� |
2006-10-20 |
|
[ 223 ]
�
� |
Additional Information on Virtual Synchronous Ethernet Method
�
� |
Adtran
� |
Q13/15
� |
2006-10-20 |
|
[ 222 ]
�
� |
SBS measurement: Proposal for text in G.650.2, Appendix II.5
�
� |
Corning Incorporated
� |
Q5/15
� |
2006-10-20 |
|
[ 221 ]
�
� |
Relationship of bend radius to reliability
�
� |
Corning Incorporated
� |
Q10/15
� |
2006-10-20 |
|
[ 220 ]
�
� |
G.VDSL2: Proposal on INM functionality for G.993.2 Amendment 1
�
� |
Ikanos Communications
,
Conexant Systems
� |
Q4/15
� |
2006-10-20 |
|
[ 219 ]
�
� |
Supporting Time synchronization (time-of-day) across a transmission network
�
� |
Tellabs Oy
� |
Q13/15
� |
2006-10-20 |
|
[ 218 ]
�
� |
Proposed mechanisms of Loop Free Ethernet Rings Protection
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 217 ]
�
� |
The influence of loops on frame forwarding
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 216 ]
�
� |
Comparison of Y.1731with IEEE802.1ag
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 215 ]
�
� |
Proposal for Initial Draft of Ethernet Rings Protection
�
� |
NTT
� |
Q9/15
� |
2006-10-20 |
|
[ 214 ]
�
� |
Proposal of operation scenarios for VCAT and LCAS management in ASON
�
� |
NTT
� |
Q12/15
� |
2006-10-20 |
Resultats:913 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):