International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP4A : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP4A� C�

ITU-R�WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 31 ]
Draft liaison statement to Working Party 5B - Attributes of the fixed satellite service to support safe operation of UAS in non-segregated air space � United States of America 2012-05-22
[ 30 ]
Examination under � 2.2 of Annex 4 of Appendix 30B � Luxembourg 2012-05-22
[ 29 ]
Propose modification to preliminary draft new Report ITU-R S.[ASYM.FSS] - Addressing the exciting asymmetry in the unplanned FSS uplink/downlink spectrum in the 10-15 GHz band � Asia Satellite Telecommunications Co. Ltd. (AsiaSat) 2012-05-22
[ 28 ]
Current and future usage of the frequency band 13.25-13.75 GHz by EESS (active) � France 2012-05-21
[ 27 ]
(Rev.1)
Summary of results of the RA-12 and CPM15-1 � Chairman, SG 4 2012-05-18
[ 26 ]
Application of Article 2A to Appendices 30 and 30A � Radiocommunication Bureau 2012-05-16
[ 25 ]
Examination under �2.2 of Annex 4 of Appendix 30B � Radiocommunication Bureau 2012-05-16
[ 24 ]
Working document towards a preliminary draft revision of Recommendation ITU-R BO.1898 - Power flux-density value required for the protection of receiving earth stations in the broadcasting-satellite service in Regions 1 and 3 from emissions by a station in the fixed and/or mobile services in the band 21.4-22 GHz � Korea (Republic of) 2012-05-15
[ 23 ]
Proposed revision of Report ITU-R S.2151 - Use and examples of systems in the fixed-satellite service in the event of natural disasters and similar emergencies for warning and relief operations (for Working Party 4A for information purpose only) � Japan 2012-05-15
[ 22 ]
Items to be studied in association with Resolution 756 (WRC-12) � Japan 2012-05-15
[ 21 ]
Preliminary draft new Report ITU-R S. [VSAT] - Use of very small aperture terminals (VSATs) � Japan 2012-05-15
[ 20 ]
Working document towards a preliminary draft new Report ITU-R S.[VSAT] Technical and operational requirements for use of very small aperture terminals (VSATs) � Russian Federation 2012-05-12
[ 19 ]
Assessment of the orbital-frequency resource occupied by the GSO satellite communication system � Russian Federation 2012-05-12
[ 18 ]
Consideration of possible frequency bands for a new primary allocation to the fixed-satellite service of 250 MHz in frequency bands between 10 and 17 GHz in Region 1 � Russian Federation 2012-05-12
[ 17 ]
On the revision of the value of the criterion of the permissible interference between GSO satellite systems � Russian Federation 2012-05-12
[ 16 ]
Future updating of the Recommendations and other ITU-R texts under joint responsibility of Study Groups 4 and 5 � Chairmen, SGs 4 and 5 2012-05-08
[ 15 ]
Liaison statement to ITU-R Study Group 4 � ITU-D SG 2 2012-05-07
[ 14 ]
Liaison statement - Resolution ITU-R 60 � ITU-T SG 5 2012-05-07
[ 13 ]
Working document on coordination arc for 20/30 GHz FSS � United States of America 2012-05-01
[ 12 ]
Working document towards a preliminary draft new Report or Recommendation ITU-R S.[FSS-5GHZ ARNS compatibility] � United States of America 2012-05-01
[ 11 ]
Preliminary draft revision of Recommendation ITU-R S.732 - Method for statistical processing of earth-station antenna side-lobe peaks � United States of America 2012-05-01
[ 10 ]
Draft liaison statement to JTG 4-5-6-7 - Compatibility of the fixed-satellite service (FSS) with broadband wireless access (BWA) in the band 3 400-4 200 MHz � United States of America 2012-05-01
[ 9 ]
(Rev.2)
WRC Resolutions and Recommendations related to the work of Study Group 4 � Chairman, SG 4 2012-04-25
[ 8 ]
(Rev.3)
Assignment of the Study Group 4 texts to the Working Parties � Chairman, SG 4 2012-04-25
[ 7 ]
Question ITU-R 212-4/5 to be brought to the attention of Study Groups 1, 4 and 7 � SG 5 2012-04-24
[ 6 ]
Recommendation ITU-R F.758-5 to be brought to the attention of Study Groups 4, 6 and 7 � SG 5 2012-04-24
[ 5 ]
Questions ITU-R 1-5/5 and 252/5 to be brought to the attention of Study Groups 1, 4, 6 and 7 � SG 5 2012-04-24
[ 4 ]
Development of epfd validation software in accordance with Recommendation ITU-R S.1503-1 � Director, BR 2012-04-19
[ 3 ]
Liaison statement to Study Groups 4, 5, 6 and 7, and Working Parties 4A, 4B, 4C, 5A, 5B, 5C 5D, 6A, 7B, 7C and 7D - Preparations for WRC-15 Agenda items 1.1 and 1.2 in response to decisions of CPM15-1 � Chairman, JTG 4-5-6-7 2012-03-26
[ 2 ]
Question 136/6 to be brought to the attention of Study Groups 4 and 5 � SG 6 2012-03-22
[ 1 ]
Documents to be carried over from the 2007-2011 study period � WP 4A 2012-01-26
Results:681 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2015-11-16