Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1790 ]
�
(Rev.1)� |
Consideration of Multi-root EVPRM architecture
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1789 ]
�
(Rev.1)� |
Ethernet NNI and UNI information containment relationships
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1788 ]
�
(Rev.1)� |
Consideration of the applicability of currently defined EVPRM architecture
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1787 ]
�
(Rev.1)� |
Proposal for the modification of EVPRM type classification
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1786 ]
�
(Rev.1)� |
Text proposal for Annex B "EVC <-> EC Peering and EVC <=> EC Client/Server Relationships" in new Recommendation G.8012.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1785 ]
�
(Rev.1)� |
Terms for rooted multipoint (RMP) tree
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1784 ]
�
(Rev.1)� |
Comments on Multi-root EVPRM service model in G.8011.4
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1783 ]
�
(Rev.1)� |
Proposed text for G.8011.4 clause 6.2
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1782 ]
�
� |
Withdrawn: reposted as TD240/WP2 - Characteristics of monitoring systems for optical fibre submarine cable systems
�
Withdrawn
� |
Huawei Technologies Co. Ltd.
� |
Q8/15
� |
2011-11-22 |
|
[ 1781 ]
�
� |
Withdrawn by author
�
Withdrawn
� |
Hitachi, Ltd.
� |
Q3/15
� |
2011-11-22 |
|
[ 1780 ]
�
(Rev.1)� |
Consideration on PTP over OTN solution options
�
� |
Huawei Technologies Co. Ltd.
� |
Q13/15, Q11/15
� |
2011-11-22 |
|
[ 1779 ]
�
(Rev.1)� |
Ethernet transport network node and port examples for inclusion in G.8021.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1778 ]
�
(Rev.1)� |
Update 1+1 SNC/N protection descriptions in clause 11.2/G.808.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1777 ]
�
(Rev.1)� |
Suggestion to improve existing CBTS back-off rules
�
� |
ZTE Corporation
� |
Q4/15
� |
2011-11-22 |
|
[ 1776 ]
�
� |
Multi layer optimization alternatives associated with Ethernet Service support
�
� |
Huawei Technologies Co. Ltd.
� |
Q12/15
� |
2011-11-22 |
|
[ 1775 ]
�
(Rev.1)� |
Proposal for the structure modification of G.8101
�
� |
Hitachi, Ltd.
� |
Q3/15
� |
2011-11-22 |
|
[ 1774 ]
�
(Rev.1)� |
Consideration of the relationship between G.8001 and G.8101
�
� |
Hitachi, Ltd.
� |
Q3/15
� |
2011-11-22 |
|
[ 1773 ]
�
(Rev.1)� |
Proposed alignment between G.8001 and G.8101
�
� |
Hitachi, Ltd.
� |
Q3/15
� |
2011-11-22 |
|
[ 1772 ]
�
(Rev.1)� |
Development of PTP time transport HRMs that encompass OTN
�
� |
Alcatel-Lucent Italia S.p.A.
,
Huawei Technologies Co. Ltd.
� |
Q13/15
� |
2011-11-22 |
|
[ 1771 ]
�
(Rev.1)� |
Comment list of G.multi
�
� |
Huawei Technologies Co. Ltd.
� |
Q2/15
� |
2011-11-22 |
|
[ 1770 ]
�
(Rev.1)� |
Modification to MPLS PW related MEs
�
� |
Huawei Technologies Co. Ltd.
� |
Q2/15
� |
2011-11-22 |
|
[ 1769 ]
�
(Rev.1)� |
Scope of G.smp
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1768 ]
�
(Rev.1)� |
Protection GEM Port for Port Correlation
�
� |
Huawei Technologies Co. Ltd.
� |
Q2/15
� |
2011-11-22 |
|
[ 1767 ]
�
� |
Withdrawn; Duplicate of C-1768 - Protection GEM Port for Port Correlation
�
Withdrawn
� |
Huawei Technologies Co. Ltd.
� |
Q2/15
� |
2011-11-22 |
|
[ 1766 ]
�
(Rev.1)� |
Proposed RFID tag experience for ODN in China
�
� |
ZTE Corporation
� |
Q17/15
� |
2011-11-22 |
|
[ 1765 ]
�
(Rev.1)� |
G.fast: Reverse powering over twisted pair
�
� |
ZTE Corporation
� |
Q4/15
� |
2011-11-22 |
|
[ 1764 ]
�
(Rev.1)� |
A protection switching method by re-using EqD values in GPON or XG-PON1
�
� |
ZTE Corporation
� |
Q2/15
� |
2011-11-22 |
|
[ 1763 ]
�
(Rev.1)� |
Consideration on the use of a new Ethertype for MPLS-TP
�
� |
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1762 ]
�
(Rev.1)� |
OTN SMP
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1761 ]
�
(Rev.1)� |
Consideration on scope of OTN SMP
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1760 ]
�
(Rev.1)� |
One service with multiple protection paths in SMP
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1759 ]
�
(Rev.1)� |
Race conditions in G.smp
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1758 ]
�
(Rev.1)� |
Automatic switch in G.smp
�
� |
China Unicom
,
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1757 ]
�
(Rev.1)� |
Consideration on the adaptation of OTU5 over multichannel parallel interfaces
�
� |
China Unicom
,
ZTE Corporation
� |
Q11/15
� |
2011-11-22 |
|
[ 1756 ]
�
(Rev.1)� |
MPLS-TP OAM Recommendations - Proposed way forward
�
� |
Japan
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1755 ]
�
(Rev.1)� |
Possible scenario and actions to allow progress on MPLS-TP
�
� |
Japan
� |
Q10/15
� |
2011-11-22 |
|
[ 1754 ]
�
(Rev.1)� |
Proposal of new recommendation on multi layer converged transport network (G.mlctn)
�
� |
ZTE Corporation
� |
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
� |
2011-11-22 |
|
[ 1753 ]
�
(Rev.1)� |
Draft of multi layer converged network informative document
�
� |
ZTE Corporation
� |
Q9/15, Q14/15, Q12/15, Q11/15, Q10/15
� |
2011-11-22 |
|
[ 1752 ]
�
(Rev.1)� |
JDSU Time Offset Measurement
�
� |
JDSU Deutschland GmbH
� |
Q13/15
� |
2011-11-22 |
|
[ 1751 ]
�
(Rev.1)� |
Draft document of G.epon
�
� |
Mitsubishi Electric Corporation
,
Nippon Telegraph and Telephone Corporation (NTT)
,
OKI Electric Industry Company Ltd. (OKI)
� |
Q2/15
� |
2011-11-22 |
|
[ 1750 ]
�
(Rev.1)� |
Proposal for change of jitter test parameters in O.174 amd.1
�
� |
Communications and Information network Association of Japan (CIA
� |
Q15/15
� |
2011-11-22 |
|
[ 1749 ]
�
(Rev.1)� |
Proposal for Jitter measurement linearity in Appendix VII/O.172
�
� |
Communications and Information network Association of Japan (CIA
� |
Q15/15
� |
2011-11-22 |
|
[ 1748 ]
�
(Rev.1)� |
Consideration on the node numbers and transmission distance of OTN SRP
�
� |
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1747 ]
�
(Rev.1)� |
Proposed text for the description of Extra Traffic in Draft Rec. G.873.2
�
� |
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1746 ]
�
(Rev.1)� |
Proposal of DC-DQPSK in G.sup39
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q6/15
� |
2011-11-22 |
|
[ 1745 ]
�
(Rev.1)� |
Parameter Definitions of delay line interferometer of DQPSK in G.671
�
� |
ZTE Corporation
� |
Q7/15
� |
2011-11-22 |
|
[ 1744 ]
�
(Rev.1)� |
Requirement for communication latency, latency variation and loss as traffic engineering performance metrics in ASON
�
� |
ZTE Corporation
� |
Q14/15, Q12/15
� |
2011-11-22 |
|
[ 1743 ]
�
(Rev.1-2)� |
Considerations on beyond 100G transmission for G.Sup 39
�
� |
China Unicom
,
ZTE Corporation
� |
Q6/15
� |
2011-11-22 |
|
[ 1742 ]
�
(Rev.1)� |
Proposal for studying constellation in G.Sup39
�
� |
ZTE Corporation
� |
Q6/15
� |
2011-11-22 |
|
[ 1741 ]
�
(Rev.1)� |
Considerations on EVM in G.698.2
�
� |
ZTE Corporation
� |
Q6/15
� |
2011-11-22 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):