Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 315 ]
�
� |
Working document on WRC-19 agenda item 1.5 - Preliminary draft new Report on compatibility of maritime ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band
�
� |
United States of America
� |
AI1.5
� |
2017-04-26 |
|
[ 314 ]
�
� |
Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed and mobile services in the 27.5-29.5 GHz frequency band
�
� |
United States of America
� |
AI1.5
� |
2017-04-26 |
|
[ 313 ]
�
� |
Comments on the proposed harmonization of some of the provisions of Appendix 30B with those of Appendix 30/30A
�
� |
Canada
� |
AI7
� |
2017-04-26 |
|
[ 312 ]
�
� |
WRC-19 agenda item 1.6 - Considerations on non-GSO/GSO FSS sharing in the Q/V band
�
� |
Canada
� |
AI1.6
� |
2017-04-26 |
|
[ 311 ]
�
� |
Proposed updates to working document [TOWARDS A PRELIMINARY DRAFT NEW REPORT] on spectrum needs - WRC-19 agenda item 9.1, issue 9.1.9
�
� |
Canada
� |
AI9.1
� |
2017-04-26 |
|
[ 310 ]
�
� |
Bringing into use of frequency assignments to non-geostationary satellite networks or systems
�
� |
Canada
� |
AI7
� |
2017-04-26 |
|
[ 309 ]
�
� |
Proposed modifications to the preliminary draft CPM text for WRC-19 agenda item 7 - Issue D: Identification of those specific satellite networks and systems with which coordination needs to be effected under RR Nos. 9.12A and 9.13 or 9.21
�
� |
Canada
� |
AI7
� |
2017-04-26 |
|
[ 308 ]
�
� |
Proposed new issue under WRC-19 agenda item 7 - Issue XX: Modifications to Appendix 4 data elements to be provided for non-Geostationary satellite networks/systems
�
� |
Canada
� |
AI7
� |
2017-04-26 |
|
[ 307 ]
�
� |
Study between non-geostationary FSS systems and EESS (passive) systems in the bands 36-37 GHz and 50.2-50.4 GHz
�
� |
Canada
� |
AI1.6
� |
2017-04-26 |
|
[ 306 ]
�
� |
FSS protection criteria to be used in sharing and compatibility studies for WRC-19 agenda item 1.13
�
� |
GSMA
� |
AI1.13
� |
2017-04-26 |
|
[ 305 ]
�
� |
Issue[XX]: Application of Paragraph 6.6 and 6.16 of Article 6 of Appendix 30B - WRC-19 agenda item 7
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-04-26 |
|
[ 304 ]
�
� |
Issue[Y]: Extension of the date of bringing into use of assignments due to force-majeure - Under WRC-19 agenda item 7
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-04-26 |
|
[ 303 ]
�
� |
Issue[X]: Establishment a facility to the administrations in order to observe their comments/objections under No. 9.51 and No. 9.52 for coordination under Nos.9.7 - WRC-19 agenda item 7
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-04-26 |
|
[ 302 ]
�
� |
Comments on Annex 24 to Working Party 4A Chairman's Report - Working document - Enhancement of the regulatory provisions of RR Appendix 30B to observe the principles based on which it was initially established - WRC-19 agenda item 7 - Issue F
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-04-26 |
|
[ 301 ]
�
� |
Issue [Z]: Frequency bands submitted under Article 6 for additional use - Under WRC-19 agenda item 7
�
� |
Iran (Islamic Republic of)
� |
AI7
� |
2017-04-26 |
|
[ 300 ]
�
� |
Comments to Annex 17 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Preliminary study material for the case of airborne ESIMs and the fixed service in the 27.5-29.5 GHz frequency band
�
� |
Iran (Islamic Republic of)
� |
AI1.5
� |
2017-04-26 |
|
[ 299 ]
�
� |
Comments to Annex 16 to Working Party 4A Chairman's Report - Working document on WRC-19 agenda item 1.5 - Operation of earth stations in motion (ESIM) communicating with geostationary space stations in the fixed-satellite service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz
�
� |
Iran (Islamic Republic of)
� |
AI1.5
� |
2017-04-26 |
|
[ 298 ]
�
� |
Proposed liaison statement to Working Party 5A - Regarding WRC-19 agenda item 1.12
�
� |
Thailand
� |
AI1.12
� |
2017-04-25 |
|
[ 297 ]
�
� |
Characteristic for land earth stations in motion
�
� |
France
,
Germany (Federal Republic of)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-04-25 |
|
[ 296 ]
�
� |
ESIM coexistence with other satellite services
�
� |
France
,
Germany (Federal Republic of)
,
Luxembourg
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2017-04-25 |
|
[ 295 ]
�
� |
Draft CPM text for WRC-19 agenda item 1.5
�
� |
France
,
Germany (Federal Republic of)
,
Netherlands (Kingdom of the)
,
Norway
,
United Kingdom of Great Britain and Northern Ireland
� |
AI1.5
� |
2017-04-25 |
|
[ 294 ]
�
� |
Preliminary draft revision to Recommendation ITU-R S.1503: Functional description to be used in developing software tools for determining conformity of non-geostationary-satellite orbit fixed-satellite system networks with limits contained in Article 22 of the Radio Regulations
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2017-04-25 |
|
[ 293 ]
�
� |
Protection of existing BSS networks in the 37.2 W - 9E orbital arc implementing earth stations with antenna size smaller than 0.60 M
�
� |
Sweden
� |
� |
2017-04-25 |
|
[ 292 ]
�
� |
Some aspects of the proposed revision of paragraph 4.1.18 in Appendices 30 and 30A of the Radio Regulations
�
� |
Bulgaria (Republic of)
� |
AI7
� |
2017-04-25 |
|
[ 291 ]
�
� |
Examination results on reference antenna pattern for Regions 1 and 3 BSS receiving antennas in Annex 5 to Appendix 30 of the Radio Regulations
�
� |
Bulgaria (Republic of)
� |
Q293/4
� |
2017-04-25 |
|
[ 290 ]
�
� |
Protection criteria for sharing studies relating to WRC-19 - Agenda items 1.13 (IMT), 1.14 (HAPS) and 1.16 (RLAN)
�
� |
United Arab Emirates
� |
AI1.16, AI1.14, AI1.13
� |
2017-04-25 |
|
[ 289 ]
�
� |
Most sensitive and most interfering parameters for inter service sharing studies between FSS/BSS and other services - System parameters for FSS/BSS
�
� |
United Arab Emirates
� |
� |
2017-04-25 |
|
[ 288 ]
�
� |
Parameters for inter service sharing studies between FSS and RLAN services - System parameters for FSS
�
� |
United Arab Emirates
� |
� |
2017-04-25 |
|
[ 287 ]
�
� |
Revisions to working document [towards a preliminary draft new Report] on the protection of EESS (passive) and RAS systems from non-GSO satellite systems operating in the 37.5-42.5 GHz, 47.2-50.2 GHz and 50.4-51.4 GHz frequency bands under WRC-19 agenda item 1.6
�
� |
United States of America
� |
AI1.6
� |
2017-04-24 |
|
[ 286 ]
�
� |
Working document [towards a preliminary draft new Recommendation/Report] on a methodology to estimate the e.i.r.p. density levels of land-based earth stations in motion (ESIMs) to ensure compliance with coordination distance limits and power flux density limits with respect to fixed service stations operating in the 27.5-29.5 GHz frequency band
�
� |
United States of America
� |
AI1.5
� |
2017-04-24 |
|
[ 285 ]
�
� |
Proposed draft CPM text for WRC-19 agenda item 1.5
�
� |
United States of America
� |
AI1.5
� |
2017-04-24 |
|
[ 284 ]
�
� |
Revisions to Section 12 of the working document on WRC-19 agenda item 1.5, operation of earth stations in motion (ESIMs) communicating with geostationary space stations in the fixed-satellite service into other services operating in the 27.5-29.5 GHz frequency band
�
� |
United States of America
� |
AI1.5
� |
2017-04-24 |
|
[ 283 ]
�
� |
Proposed revisions to Annex 18 to Document 4A/196
�
� |
United States of America
� |
AI1.5
� |
2017-04-24 |
|
[ 282 ]
�
� |
Addressing the six month resubmission period in RR No. 11.46
�
� |
United States of America
� |
� |
2017-04-24 |
|
[ 281 ]
�
� |
A regulatory question concerning satellite-to-satellite links certain FSS (Earth-to-space) bands from LEO/MEO non-GSO systems to FSS space stations in the geostationary arc
�
� |
United States of America
� |
� |
2017-04-24 |
|
[ 280 ]
�
� |
Input on working document - Updating the reference situation for networks under RR Appendices 30 and 30A when provisionally recorded assignments are converted into definitive recorded assignments - WRC-19 agenda item 7 - Issue G
�
� |
United States of America
� |
AI7
� |
2017-04-21 |
|
[ 279 ]
�
� |
Proposal related to WRC-19 agenda item 7 - Issue F
�
� |
United States of America
� |
AI7
� |
2017-04-21 |
|
[ 278 ]
�
� |
Proposal related to WRC-19 agenda item 7 - Issue E
�
� |
United States of America
� |
AI7
� |
2017-04-21 |
|
[ 277 ]
�
� |
Working document towards a preliminary draft new Recommendation/Report on interference considerations for Bi-Directional use of the 6 725-7 025 MHz band by non-geostationary Fixed-Satellite Service systems
�
� |
United States of America
� |
AI9.1
� |
2017-04-21 |
|
[ 276 ]
�
� |
Working document toward a preliminary draft new Report ITU-R S.[NGSO_FSS_BIU] - Studies relating to the bringing into use of frequency assignments to non-GSO FSS satellite networks/systems
�
� |
United States of America
� |
� |
2017-04-21 |
|
[ 275 ]
�
� |
Updates to working document [towards a preliminary draft new Recommendation/Report] ITU-R S.[NGSO_6/4GHz] on technical and regulatory studies for 6/4 GHz GSO/non-GSO FSS sharing - WRC-19 agenda item 9.1, issue 9.1.3
�
� |
United States of America
� |
AI9.1
� |
2017-04-21 |
|
[ 274 ]
�
� |
Proposed updates to working document [towards a preliminary draft new Report/Recommendation] on sharing between 50/40 GHz GSO and non-GSO systems - WRC-19 agenda item 1.6
�
� |
United States of America
� |
� |
2017-04-21 |
|
[ 273 ]
�
� |
Proposed preliminary CPM text for WRC-19 agenda item 1.6
�
� |
United States of America
� |
� |
2017-04-21 |
|
[ 272 ]
�
� |
Proposed working document towards a preliminary draft new Recommendation ITU-R S.[50/40 GHz FSS SHARING]
�
� |
United States of America
� |
AI1.6
� |
2017-04-21 |
|
[ 271 ]
�
� |
Work document toward a draft new Report ITU-R S.[ESIM] - Operation of Earth Stations In Motion (ESIM) in Fixed-Satellite Service allocations at 17.7-19.7 GHz and 27.5-29.5 GHz - Protection criteria for feeder links of the MSS in the bands 19.3-19.7 GHz and 29.1-29.5 GHz
�
� |
United States of America
� |
� |
2017-04-21 |
|
[ 270 ]
�
� |
Proposed revisions to the working document towards a preliminary draft new Report ITU-R BO.[AP30.ANNEX7] - Assessment on limitations mentioned in Annex 7 to RR Appendix 30 (Rev. WRC-12) in the 11.7-12.7 GHz band for the GSO broadcasting -satellite service in all Regions
�
� |
United States of America
� |
� |
2017-04-21 |
|
[ 269 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[INTRF MGMT VSAT IN 27.5-30 GHz] - Uplink interference associated with closely separated GSO FSS VSAT networks in the 27.5-30 GHz frequency band
�
� |
Australia
� |
� |
2017-04-21 |
|
[ 268 ]
�
� |
Updating the reference situation for networks under Appendix 30 and 30A when provisional recording is used - WRC-19 agenda item 7
�
� |
Netherlands (Kingdom of the)
� |
AI7
� |
2017-04-20 |
|
[ 267 ]
�
� |
FSS/BSS technical parameters for sharing studies under WRC-19 agenda items 1.13 and 1.14
�
� |
United States of America
� |
AI1.14, AI1.13
� |
2017-04-20 |
|
[ 266 ]
�
� |
List of affected frequency assignments for satellite networks identified under No. 9.36.2 of the Radio Regulations (agenda item 7, issue D)
�
� |
Director, BR
� |
� |
2017-04-20 |
Results:915 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):