Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1840 ]
�
� |
G.8032 ERP as a sub-type of G.8011.5 EPLAN and of G.8011.3 EVPLAN types 1, 2, and 3
�
� |
Alcatel-Lucent Bell N.V.
� |
Q10/15
� |
2011-11-22 |
|
[ 1839 ]
�
� |
Proposed modifications to draft G.8032v3
�
� |
AimValley BV
,
Alcatel-Lucent Bell N.V.
� |
Q9/15
� |
2011-11-22 |
|
[ 1838 ]
�
� |
G.8021 and G.8051 updates to support MI specified in G.8031v3 as corrected and G.8032v3
�
� |
Alcatel-Lucent Bell N.V.
� |
Q9/15, Q14/15
� |
2011-11-22 |
|
[ 1837 ]
�
� |
Withdrawn - Duplicate of C-1838
�
Forthcoming
� |
Alcatel-Lucent Bell N.V.
� |
Q9/15, Q14/15
� |
2011-11-22 |
|
[ 1836 ]
�
� |
Clarification on the meaning of "top priority local request" for CLEAR, clearance of SF(-P) (or of SD if applicable), or expiration of WTR in G.8031
�
� |
Alcatel-Lucent Bell N.V.
,
Orckit Corrigent
� |
Q9/15
� |
2011-11-22 |
|
[ 1835 ]
�
(Rev.1)� |
Statistical Analysis of MPI in Bend Insensitive Fibres
�
� |
Corning Incorporated
� |
Q5/15
� |
2011-11-22 |
|
[ 1834 ]
�
(Rev.1)� |
Updated proposal for Future revision to ITU-T Recommendation G.654
�
� |
Corning Incorporated
� |
Q8/15, Q5/15
� |
2011-11-22 |
|
[ 1833 ]
�
(Rev.1)� |
Future revision to ITU-T Recommendation G.657 (bend insensitive SMF)
�
� |
Corning Incorporated
� |
Q5/15
� |
2011-11-22 |
|
[ 1832 ]
�
(Rev.1)� |
Proposal to reference IETF RFCs in ITU-T Recommendations
�
� |
United Kingdom
� |
Q10/15
� |
2011-11-22 |
|
[ 1831 ]
�
(Rev.1)� |
Text proposal for clause 16 "Multiplexing/aggregation of Ethernet Connection signals" in new Recommendation G.8012.1
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1830 ]
�
(Rev.1)� |
Updated requirement description and proposed text for adaptive bandwidth scenario in G.808.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1829 ]
�
(Rev.1)� |
Proposal to add ETH CL-SNCG/I protection to G.8031
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1828 ]
�
(Rev.1)� |
G.sdapp ongrid frequencies up&down on decision 2 of G.sdapp decision tree
�
� |
Gemfire Europe Limited
,
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2011-11-22 |
|
[ 1827 ]
�
(Rev.1)� |
Proposal for refining the OSNR calculation with the impact of channel-dependent variation
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2011-11-22 |
|
[ 1826 ]
�
(Rev.1)� |
Proposal for ODB parameter values for 40G applications in G.698.2
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2011-11-22 |
|
[ 1825 ]
�
(Rev.1)� |
Proposal for modifying wording on Flexible Grid in revised G.694.1
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2011-11-22 |
|
[ 1824 ]
�
(Rev.1)� |
Proposal for modifying definition of OSNR in G.Sup39
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2011-11-22 |
|
[ 1823 ]
�
(Rev.1)� |
Proposal for eye mask related criteria for DQPSK time domain skew detection in G.698.2
�
� |
Huawei Technologies Co. Ltd.
� |
Q6/15
� |
2011-11-22 |
|
[ 1822 ]
�
(Rev.1)� |
Considerations about PTN and PSN applications for MPLS-TP
�
� |
Italy
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1821 ]
�
(Rev.2)� |
Considerations about collaboration between ITU-T and IETF on MPLS-TP
�
� |
Italy
� |
Q9/15, Q3/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1820 ]
�
(Rev.1)� |
Considerations for determination and approval of G.8113.1
�
� |
Italy
� |
Q10/15
� |
2011-11-22 |
|
[ 1819 ]
�
(Rev.1)� |
G.sdapp offgrid frequencies proposal on decision 3 of G.sdapp decision tree
�
� |
Alphion Corporation
,
Gemfire Europe Limited
,
Huawei Technologies Co. Ltd.
,
Juniper Networks
� |
Q6/15
� |
2011-11-22 |
|
[ 1818 ]
�
(Rev.1)� |
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15
� |
2011-11-22 |
|
[ 1817 ]
�
(Rev.1)� |
G.8021 editors contribution: OAM extraction process
�
� |
Huawei Technologies Co. Ltd.
,
NEC Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1816 ]
�
(Rev.1)� |
ODU SMP signalling considerations
�
� |
Huawei Technologies Co. Ltd.
,
Infinera Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1815 ]
�
(Rev.1)� |
Interworking G.873.2 ODUk SRP with G.873.1 ODUk SNCP
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1814 ]
�
(Rev.1)� |
Proposal of ODU Shared Mesh Protection
�
� |
Huawei Technologies Co. Ltd.
,
Infinera Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1813 ]
�
(Rev.1)� |
Protection Switching Interwoirking
�
� |
Ericsson UK
,
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1812 ]
�
� |
Withdrawn, duplicate
�
Withdrawn
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1811 ]
�
(Rev.1)� |
[G.fast] TDD Framing Parameters for G.fast
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2011-11-22 |
|
[ 1810 ]
�
(Rev.1)� |
Comments on the draft G.7044
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q11/15
� |
2011-11-22 |
|
[ 1809 ]
�
(Rev.1)� |
Consideration of APS communication and protection architectures for Ethernet rooted multipoint connection protection
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1808 ]
�
(Rev.1)� |
Text proposal for clause 15 "Mapping of client signals" in new Recommendation G.8012.1
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1807 ]
�
(Rev.1)� |
A proposal of the modification for the draft G.7044
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q11/15
� |
2011-11-22 |
|
[ 1806 ]
�
(Rev.1)� |
G.fast: Requirements for a FTU-O transceiver operating in VDSL2 mode
�
� |
France T�l�com Orange
,
Telecom Italia S.p.A.
� |
Q4/15
� |
2011-11-22 |
|
[ 1805 ]
�
(Rev.1)� |
Introduction of the super timeslots for ODU5
�
� |
Huawei Technologies Co. Ltd.
� |
Q11/15
� |
2011-11-22 |
|
[ 1804 ]
�
� |
Avoiding an unsatisfactory outcome of the MPLS-TP OAM standardisation
�
� |
France
� |
QALL/15
� |
2011-11-22 |
|
[ 1803 ]
�
(Rev.1)� |
Multi-VID ETH MEP and MIP functions
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1802 ]
�
(Rev.1)� |
Progress on ICCP extension for the MSP application
�
� |
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1801 ]
�
(Rev.1)� |
Text proposal for Annex A "P2P, RMP, MP2MP, Hairpin Ethernet Connection Identifiers" of G.8012.1
�
� |
China Telecommunications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1800 ]
�
(Rev.1)� |
Propose to improve the throughput measurement defined in Y.1731
�
� |
China Mobile Communications Corporation
,
China Unicom
,
ZTE Corporation
� |
Q10/15
� |
2011-11-22 |
|
[ 1799 ]
�
(Rev.1)� |
Comments and proposals on G.8131.1 text
�
� |
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1798 ]
�
(Rev.1)� |
Assessing the use of existing optical fibre links
�
� |
Telecom Italia S.p.A.
� |
Q5/15, Q18/15, Q17/15
� |
2011-11-22 |
|
[ 1797 ]
�
(Rev.1)� |
Proposals on the conditions for dLOC and dUNP defined in G.8021
�
� |
China
,
China Mobile Communications Corporation
,
FiberHome Technologies Group
,
ZTE Corporation
� |
Q9/15
� |
2011-11-22 |
|
[ 1796 ]
�
(Rev.1)� |
Consideration of agenda items for p2mp protection switching
�
� |
Hitachi, Ltd.
� |
Q9/15
� |
2011-11-22 |
|
[ 1795 ]
�
(Rev.1)� |
G.8012 - G.8012.1 relationship
�
� |
Huawei Technologies Co. Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1794 ]
�
(Rev.1)� |
Comment on p2mp protection switching documentation
�
� |
Hitachi, Ltd.
� |
Q9/15, Q10/15
� |
2011-11-22 |
|
[ 1793 ]
�
(Rev.1)� |
Operator needs in the New Generation Network deployment
�
� |
Telecom Italia S.p.A.
� |
Q5/15, Q18/15, Q17/15
� |
2011-11-22 |
|
[ 1792 ]
�
(Rev.1)� |
Consideration of hierarchical EVPRM architecture
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
|
[ 1791 ]
�
(Rev.1)� |
Clarification of EVPRM service type description
�
� |
Hitachi, Ltd.
� |
Q10/15
� |
2011-11-22 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):