International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5C : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5C� C�

ITU-R�WP5C

Fixed wireless systems; HF and other systems below 30 MHz in the fixed and land mobile services

Results:665 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 115 ]
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT) � WP 6A 210-3/1 2016-10-21
[ 114 ]
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5 � ITU-T SG 5 2016-10-18
[ 113 ]
Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and other antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz � ATDI 242-2/5, 110-3/5 2016-10-17
[ 112 ]
Extending to 100 GHz and revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz � ATDI 110-3/5 2016-10-17
[ 111 ]
Report on activity of Correspondence Group 5C-1 towards gathering technical characteristics of fixed service in the 30-470 MHz range for sharing studies � Chairman, CG 5C-1 2016-10-17
[ 110 ]
Reply liaison statement to Working Party 1B on infrastructure sharing (copy to Working Parties 4A, 4C, 5A and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum � WP 5D 2016-10-17
[ 109 ]
Liaison statement to ITU-D Study Group 1 Question 2/1, to ITU-R Coordination Committee for Vocabulary (CCV), Working Parties 4A, 4B, 4C, 5A, 5B, 5C and 6A on broadband definition - Broadband access technologies, including IMT, for developing countries - What is the definition of broadband? � WP 5D 2016-10-17
[ 108 ]
Liaison statement to Working Party 5C (copy to Working Party 4B for information) - FSS technical parameters for sharing studies under WRC-19 agenda item 1.14 � WP 4A AI1.14 2016-10-14
[ 107 ]
Liaison statement on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans � ITU-T SG 15 2016-10-06
[ 106 ]
Liaison statement to ITU-T Study Group 5, ITU-R Working Party 5A, Working Party 5C, Working Party 5D, IEEE 802.3 to respond to liaison statement to ITU-T Study Group 15 on the latest versions of the Access Network Transport (ANT) Standards Work Plan and Home Network Transport (HNT) Standards Overview and Work Plan (reply to Study Group 5-LS 151) � ITU-T SG 15 2016-10-06
[ 105 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Coordination Committee for Vocabulary (CCV); Working Parties 4A, 4B and 4C; Working Parties 5A, 5B, 5C and 5D; Working Party 6A, on broadband definition - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband? � ITU-D SG 1 2016-10-05
[ 104 ]
Liaison statement on Study Group 15 OTNT Standardization Work Plan � ITU-T SG 15 2016-10-05
[ 103 ]
Reply liaison statement to Working Party 1B on infrastructure sharing (copy to Working Parties 4A, 5A, 5C and 5D) - "Innovative" regulatory tools to support enhanced shared use of the spectrum � WP 4C 208-1/1 2016-09-27
[ 102 ]
Answer to liaison statement to External Organizations on Report ITU-R SM.[SMART_GRID] on the Smart Grid project � Telefon AB - LM Ericsson , Huawei Technologies Co. Ltd. , Intel Corporation , Ligado NETWORKS LLC , NEC Corporation , Nokia Solutions and Networks Oy , Qualcomm, Inc. , Samsung Electronics Co., Ltd. , Telecom Italia S.p.A. 2016-09-27
[ 101 ]
Information on the preparation of texts for the draft CPM Report to WRC-19 � Chairman, CPM-19 Q232/1 2016-09-19
[ 100 ]
Reply liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 4A, 5D, 6A, 7C and 7D) - Propagation characteristics in the frequency range 275-450 GHz in preparation for WRC-19 agenda item 1.15 � WPs 3K and 3M AI1.15 2016-07-06
[ 99 ]
(Rev.1)
Reply liaison statement to Working Party 7D (copied for information to Working Parties 1A, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and Task Group 5/1) - Propagation data and predictions for coexistence and compatibility studies above 50 GHz � WPs 3K and 3M 2016-07-04
[ 98 ]
Reply liaison statement to Working Party 5C (copied for information to Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and TG 5/1) - Propagation data and prediction methods required for coexistence and compatibility studies for High-Altitude Platform Stations (HAPS) � WP 3M 2016-07-04
[ 97 ]
Liaison statement to Working Parties 1A, 5A and 5C (copied for information to Working Parties 7C and 7D) - Initial considerations on candidate frequency bands for use by systems in the land mobile and fixed services in the range 275-450 GHz � WP 3M AI_1.15, 257/5, 256/5, 228/3 2016-07-04
[ 96 ]
Reply liaison statement to Working Parties 5B and 7B (copied to Working Parties 4A, 4C, 5A, 5C, 5D and 7D for information) - ITU-R propagation models for use in aeronautical propagation scenarios � WPs 3K and 3M 2016-07-01
[ 95 ]
Reply liaison statement to Working Party 1A (copied to Working Parties 1C, 5A, 5B, 5C, 6A, 7A and 7D) - Assessment of the impact of other emissions to radiocommunication services � WP 3L 2016-07-01
[ 94 ]
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 3J 2016-07-01
[ 93 ]
Liaison statement to Working Parties 4A, 5A, 5B, 5C & 7B - Request for information on anticipated draft CPM text deadlines by responsible groups for WRC-19 agenda items / issues where Working Party 5D is a contributing group � WP 5D 2016-06-29
[ 92 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information) � WP 5D 2016-06-28
[ 91 ]
Liaison statement to Working Party 7B (copied to Working Parties 1A, 3M, 4A, 4B, 4C, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.7 � WP 5D AI1.7 2016-06-24
[ 90 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5B and 5C) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] - A guiding methodology for providing compatibility between ubiquitously deployed earth stations of the fixed-satellite service and stations of the fixed and/or mobile services in adjacent areas for the cases ... � WP 5D 2016-06-23
[ 89 ]
Liaison statement to Working Party 7B (copied to Working Parties 3M, 4C, 5A, 5B, 5C and 6A for information) - Technical and operational characteristics for the work under WRC-19 agenda item 1.3 � WP 5D AI1.3 2016-06-23
[ 88 ]
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9 � WP 5D AI9.1 2016-06-23
[ 87 ]
Liaison statement to Working Parties 5A, 5C and 6A - Revision of Recommendation ITU-R SM.851 � WP 1A 2016-06-21
[ 86 ]
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services � WP 1A 210-3/1 2016-06-16
[ 85 ]
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B � WP 1A 210-3/1 2016-06-16
[ 84 ]
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 1A 210-3/1 2016-06-16
[ 83 ]
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 1A 210-3/1 2016-06-16
[ 82 ]
Liaison statement to Working Parties 1C & 3L (copy for information to Working Parties 5A, 5B, 5C, 6A, 7A & 7D) - Assessment of the impact of other emissions to Radiocommunication services � WP 1A 2016-06-15
[ 81 ]
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 1A 2016-06-13
[ 80 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-13
[ 79 ]
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans � WP 1A 2016-06-13
[ 78 ]
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-13
[ 77 ]
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO: fundamental safety principles for protection against non-ionizing radiation � SG 1 2016-06-13
[ 76 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing... � WP 1B 2016-06-13
[ 75 ]
Liaison statement to Working Parties 5A and 5C on infrastructure sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum � WP 1B 208-1/1 2016-06-13
[ 74 ]
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information) � WP 1B 2016-06-13
[ 73 ]
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15 � WP 1A AI1.15 2016-06-08
[ 72 ]
Liaison statement to Working Party 5D (copied for information to Task Group 5/1) - Propagation advice in support of agenda item 1.13: input requested from Working Party 5D � Chairmen, SG 3, WP 3J, WP 3K and WP 3M AI1.13 2016-06-01
[ 71 ]
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16 � WP 5A AI1.16 2016-05-25
[ 70 ]
Reply liaison statement to Working Party 6B on Global Platform for the Broadcasting Service (copy for information to ITU-R WPs 4A, 4B and 5B, 5C, 5D, ITU-T SGs 9 and 16) � WP 5A 2016-05-25
[ 69 ]
Liaison statement to Working Party 4A (copied to Working Parties 5B, 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA] � WP 5A 2016-05-25
[ 68 ]
Reply liaison statement to Working Party 7B (copy for information to Working Parties 1A, 3M 4A, 4B, 4C, 5B, 5C, 5D and 6A) - WRC-19 agenda item 1.7 � WP 5A AI1.7 2016-05-25
[ 67 ]
Liaison statement to Working Party 7B (copied for information to Working Parties 3M, 4C, 5B, 5C, 5D and 6A) - Technical characteristics for WRC-19 agenda item 1.3 � WP 5A AI1.3 2016-05-25
[ 66 ]
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications � WP 5A 2016-05-25
Results:665 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18