Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 131 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 4A, Working Party 5A, Working Party 5B, Working Party 6A)
�
� |
WP 5D
� |
� |
2012-10-16 |
|
[ 130 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1
�
� |
WP 5D
� |
� |
2012-10-16 |
|
[ 129 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1
�
� |
WP 5D
� |
� |
2012-10-16 |
|
[ 128 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 4C, 5A) - WRC-15 Agenda item 1.6
�
� |
WP 7B, WP 7C and WP 7D
� |
� |
2012-10-10 |
|
[ 127 ]
�
� |
Liaison statement to Working Party 4A - WRC-15 Agenda item 1.6
�
� |
WP 7B
� |
� |
2012-10-09 |
|
[ 126 ]
�
� |
Liaison statement to Working Party 4A and the Special Committee (copy for information to Working Parties 5A and 6A) - WRC-15 Agenda item 9.1.8
�
� |
WP 7B
� |
� |
2012-10-09 |
|
[ 125 ]
�
+Ann.1-22� |
Report on the meeting of Working Party 4A (Geneva, 19-27 September 2012)
�
� |
Chairman, WP 4A
� |
� |
2012-09-27 |
|
[ 124 ]
�
� |
Final List of Participants - Working Party 4A (Geneva, 19-27 September 2012)
�
� |
Director, BR
� |
� |
2012-09-27 |
|
[ 123 ]
�
� |
Liaison statement to Working Party 4A - Preliminary draft new Report on VSATS
�
� |
WP 4B
� |
� |
2012-09-21 |
|
[ 122 ]
�
� |
Liaison statement to Working Party 4A - Generic access procedure
�
� |
WP 4B
� |
� |
2012-09-21 |
|
[ 121 ]
�
� |
List of documents issued
�
� |
BR Study Groups Department
� |
� |
2012-09-18 |
|
[ 120 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5B, 5C, 7A, 7B, 7C and 7D
�
� |
WP 4C
� |
� |
2012-09-18 |
|
[ 119 ]
�
� |
Liaison statement to Working Party 4A - WRC-15 Agenda item 1.6
�
� |
WP 4C
� |
� |
2012-09-17 |
|
[ 118 ]
�
� |
Liaison statement to Working Parties 4A, 5A, 5C, 7B (copy for information to Working Parties 3M, 4B, 5B) - WRC-15 Agenda item 1.9.2
�
� |
WP 4C
� |
� |
2012-09-14 |
|
[ 117 ]
�
� |
Draft liaison statement to Working Party 5B - WRC-15 Agenda item 1.5
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2012-09-12 |
|
[ 116 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
�
� |
SES WORLD SKIES
� |
� |
2012-09-12 |
|
[ 115 ]
�
� |
Comment on Annex 18 to Working Party 4A Chairman's Report
�
� |
Iran (Islamic Republic of)
� |
� |
2012-09-12 |
|
[ 114 ]
�
� |
Proposed revision of the working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
�
� |
France
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2012-09-12 |
|
[ 113 ]
�
� |
Compatibility analysis between EESS(active) and FSS(Earth-to-Space) within the frequency band 13.25 13.75 GHz
�
� |
France
,
European Organisation for the Exploitation of Meteorological Satellites
,
European Space Agency (ESA)
,
Germany (Federal Republic of)
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2012-09-12 |
|
[ 112 ]
�
� |
Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the fixed-satellite service in Regions 2 and 3 (GSO)
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2012-09-12 |
|
[ 111 ]
�
� |
Primary consideration for a new allocation to the fixed-satellite service in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)
�
� |
China (People's Republic of)
� |
� |
2012-09-12 |
|
[ 110 ]
�
� |
WRC-15 Agenda item 9.1.2 - Studies on permissible interference level for coordination under No 9.7
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2012-09-12 |
|
[ 109 ]
�
� |
Proposed liaison statement to Working Party 5D - Techniques designed to increase the potential for sharing between IMT systems and FSS networks in the 3 400-3 600 MHz band
�
� |
Asia Satellite Telecommunications Co. Ltd. (AsiaSat)
� |
� |
2012-09-12 |
|
[ 108 ]
�
� |
Consideration of new allocations to the fixed-satellite service (FSS) in the range 10-17 GHz
�
� |
Intelsat, LLC
� |
� |
2012-09-11 |
|
[ 107 ]
�
� |
Proposal to re-examine Annex 3 of RR Appendix 30
�
� |
Slovenia (Republic of)
� |
� |
2012-09-11 |
|
[ 106 ]
�
� |
Working document towards a preliminary draft new Recommendation on the use of earth stations on mobile platforms operating with GSO FSS networks in bands within the frequency ranges 20/30 GHz
�
� |
United States of America
� |
70-1/4
� |
2012-09-11 |
|
[ 105 ]
�
� |
Initial evaluation of the applicability of the value of 6% ?T/T for triggering coordination between geostationary fixed-satellite service networks
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 104 ]
�
� |
Working document - Information related to Agenda item 9.1.2 - Size of the coordination arc for triggering coordination under RR No. 9.7
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 103 ]
�
� |
Preliminary draft new Report ITU-R S.[ESV] on the interference effect of transmissions from earth stations on board vessels operating in fixed-satellite service networks on co-frequency stations
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 102 ]
�
� |
Draft new Report on the technical and operational requirements for earth stations on mobile platforms operating in non-GSO FSS systems in the frequency bands from 17.3 to 19.3, 19.7 to 20.2, 27 to 29.1 and 29.5 to 30.0 GHz
�
� |
United States of America
� |
70-1/4
� |
2012-09-11 |
|
[ 101 ]
�
� |
Comments on the development of the epfd software
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 100 ]
�
� |
Expansion of working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the fixed-satellite service in Regions 2 and 3 (GSO)
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 99 ]
�
� |
Expansion of working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 98 ]
�
� |
Draft outline and preliminary material for the draft CPM Report to WRC-15 for Agenda items 1.6.1 and 1.6.2 in Chapter 4, Satellite services - Sub-Chapter 4.1, Fixed-satellite service, Agenda item 1.6
�
� |
United States of America
� |
� |
2012-09-11 |
|
[ 97 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[FSS 7/8 GHz] on the feasibility of a new FSS allocation in Region 7/8 GHz range
�
� |
France
� |
� |
2012-09-11 |
|
[ 96 ]
�
� |
Proposed liaison statement to Working Party 5C - Fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.9.1
�
� |
France
,
Luxembourg
,
Norway
,
Sweden
,
United Kingdom of Great Britain and Northern Ireland
� |
� |
2012-09-11 |
|
[ 95 ]
�
� |
Preliminary draft revision of Recommendation ITU-R S.1503-1
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2012-09-11 |
|
[ 94 ]
�
� |
Working document towards draft CPM text on WRC-15 Agenda item 1.7
�
� |
Canada
� |
� |
2012-09-10 |
|
[ 93 ]
�
� |
Draft liaison statement to Working Party 5B - WRC-15 Agenda item 1.7
�
� |
Canada
� |
� |
2012-09-10 |
|
[ 92 ]
�
� |
Examination under � 2.2 of Annex 4 of RR Appendix 30B
�
� |
Israel (State of)
� |
� |
2012-09-10 |
|
[ 91 ]
�
� |
Working document towards revision of the current ITU-R Recommendations which established criterion of the permissible interference between GSO satellite systems
�
� |
Russian Federation
� |
� |
2012-09-07 |
|
[ 90 ]
�
� |
Working document towards preliminary draft new Report ITU-R S.[FSS 7/8 GHz Compatibility] - Compatibility studies of the fixed satellite service with the existing and planned ground and space services in the frequency bands 7 150-7 250 MHz (space-to-Earth) and 8 400-8 500 MHz (Earth-to-space)
�
� |
Russian Federation
� |
� |
2012-09-07 |
|
[ 89 ]
�
� |
The publication of information on bringing into use of the satellite network on the ITU web site
�
� |
Russian Federation
� |
� |
2012-09-07 |
|
[ 88 ]
�
� |
Preliminary draft new Report ITU-R S.[SPECTRUM-ORBIT-RESOURCE] - Assessment of the orbital-frequency resource used by a GSO satellite communication system
�
� |
Russian Federation
� |
� |
2012-09-07 |
|
[ 87 ]
�
� |
Proposed modifications to working document towards a preliminary draft new Report ITU-R S.[R1.FSS]
�
� |
Russian Federation
� |
� |
2012-09-07 |
|
[ 86 ]
�
� |
Recommendation ITU-R BT.1833-2 to be brought to the attention of Study Group 4
�
� |
SG 6
� |
� |
2012-09-10 |
|
[ 85 ]
�
� |
Proposed modification to the working document - Technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7
�
� |
Japan
� |
� |
2012-09-05 |
|
[ 84 ]
�
� |
Preliminary draft new Report ITU-R S.[VSAT] - Use of very small aperture terminals (VSATs) operating in fixed satellite service networks
�
� |
Japan
� |
� |
2012-09-05 |
|
[ 83 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)
�
� |
Korea (Republic of)
� |
� |
2012-09-05 |
|
[ 82 ]
�
� |
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the fixed-satellite service in Regions 2 and 3 (GSO)
�
� |
Korea (Republic of)
� |
� |
2012-09-05 |
Results:681 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):