Contributions�� |
�
|
Number�
|
Title
|
Source
|
Date
|
|
[ 165 ]
�
� |
Feasibility assessment for accomodation of mobile broadband long term evolution (LTE) systems in the 2 200-2 290 MHz band
�
� |
United States of America
� |
2013-07-12 |
|
[ 164 ]
�
� |
Information paper on 5 GHz sharing issues
�
� |
United States of America
� |
2013-07-12 |
|
[ 163 ]
�
� |
Proposal for modification of Attachment 4 of "Working document on sharing and compatibility studies under agenda item 1.2" (Annex 5 to Document 4-5-6-7/113)
�
� |
Rai Way S.p.A.
� |
2013-07-11 |
|
[ 162 ]
�
� |
Sharing and coexistence study between IMT systems networks and FSS space stations in the 5 925-6 425 MHz band
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 161 ]
�
� |
Proposals for the development of CPM text under WRC-15 agenda item 1.1
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 160 ]
�
� |
Possible approaches to define methods to satisfy WRC-15 agenda item 1.1
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 159 ]
�
� |
Proposals for modification of working document towards preliminary draft CPM text for WRC-15 Agenda item 1.2
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 158 ]
�
� |
Analysis of possible operation of IMT Systems in the frequency band 2 700-3 100 MHz
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 157 ]
�
� |
Proposals on modification of working document towards a preliminary draft new Report ITU-R M.[ARNS-MS]
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 156 ]
�
� |
Compatibility studies of IMT Systems with aeronautical telemetry in the frequency band 1 429-1 535 MHz
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 155 ]
�
� |
Compatibility studies of IMT Systems with radiolocation systems in the frequency band 1 300-1 400 MHz
�
� |
Russian Federation
� |
2013-07-11 |
|
[ 154 ]
�
� |
Sharing study on the effects of international mobile telecommunications-advanced systems on C-Band earth stations
�
� |
North American Broadcasters Association (NABA)
� |
2013-07-10 |
|
[ 153 ]
�
� |
Studies on frequency related matters for International Mobile Telecommunications and other terrestrial mobile broadband applications - Technical and regulatory framework in Australia to protect digital terrestrial television broadcasting below 694 MHz
�
� |
Australia
� |
2013-07-10 |
|
[ 152 ]
�
� |
Information on the usage of the 690 to 790 MHz band by SAB/SAP - Results of measurements during a number of recent major events in Germany
�
� |
Germany (Federal Republic of)
� |
2013-07-09 |
|
[ 151 ]
�
� |
APT views on WRC-15 Agenda item 1.1
�
� |
Asia-Pacific Telecommunity
� |
2013-07-09 |
|
[ 150 ]
�
� |
WRC-15 Agenda item 1.1 - Elements of sharing and compatibility studies between the broadcasting service and the mobile service
�
� |
C.B.S., Inc.
� |
2013-07-06 |
|
[ 149 ]
�
� |
WRC-15 Agenda item 1.1 - Technical and operational characteristics of terrestrial television broadcasting for sharing and compatibility studies under WRC-15 Agenda item 1.1
�
� |
C.B.S., Inc.
� |
2013-07-06 |
|
[ 148 ]
�
� |
Work on Agenda item 1.2
�
� |
ECOWAS
,
Cameroon (Republic of)
� |
2013-07-05 |
|
[ 147 ]
�
� |
Comment on Working Party 5D liaison statement to Joint Task Group 4-5-6-7 July meeting regarding suitable candidate bands under 1.1
�
� |
ECOWAS
,
Cameroon (Republic of)
� |
2013-07-03 |
|
[ 146 ]
�
� |
Technical Parameters of DTTB Systems C (ISDB-T) for sharing and compatibility studies between the broadcasting service and the mobile service under WRC-15 Agenda items 1.1 and 1.2
�
� |
Japan
� |
2013-07-02 |
|
[ 145 ]
�
� |
Considerations on compatibility between services in the 1 400-1 427 MHz band and IMT systems in the 1 427.9-1 462.9 MHz and 1 475.9-1 510.9 MHz bands under WRC-15 Agenda item 1.1
�
� |
Japan
� |
2013-07-02 |
|
[ 144 ]
�
� |
The result of sharing study between FSS and IMT-Advanced in the frequency band of 3400-3600 MHz considering geographical conditions
�
� |
Japan
� |
2013-07-02 |
|
[ 143 ]
�
� |
Considerations on 3 400-4 200 MHz and 4 400-4 900 MHz bands under WRC-15 Agenda item 1.1
�
� |
Japan
� |
2013-07-02 |
|
[ 142 ]
�
� |
Liaison statement to Working Party 6A (copy to Joint Task Group 4-5-6-7 for information) - Correlation of short-term interfering signals
�
� |
WP 3K
� |
2013-07-01 |
|
[ 141 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parites 6A, 5D and 5B for information) - Appropriate propagation information where a current Recommendation may not seem to be wholly applicable
�
� |
WPs 3K and 3M
� |
2013-07-01 |
|
[ 140 ]
�
� |
Progress Report to Joint Task Group 4-5-6-7
�
� |
Chairman, SWG2 Task 1.2.2 CG
� |
2013-06-24 |
|
[ 139 ]
�
(Rev.1)� |
Progress Report to Joint Task Group 4-5-6-7
�
� |
Chairman, Rapporteur Group
� |
2013-06-24 |
|
[ 138 ]
�
� |
Reply liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 5A, 5C and 5D for information) - Preparations for WRC-15 Agenda item 1.1 - Additional technical and operational characteristics
�
� |
WP 5B
� |
2013-06-11 |
|
[ 137 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 Agenda item 1.1
�
� |
WP 5A
� |
2013-06-04 |
|
[ 136 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Party 5D) - Update of fixed service characteristics, protection criteria and modelling for WRC-15 Agenda item 1.1
�
� |
WP 5C
� |
2013-06-04 |
|
[ 135 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Party 5D) - Update of fixed service antenna modelling characteristics
�
� |
WP 5C
� |
2013-06-04 |
|
[ 134 ]
�
� |
Reply liaison statement to Joint Task Group 4-5-6-7 - Compatibility studies of the mobile service (except aeronautical mobile) with the aeronautical radionavigation service in the frequency band 694-790 MHz in Region 1
�
� |
WP 5B
� |
2013-06-04 |
|
[ 133 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 - Considerations on suitability of 3 400-4 200 MHz, 4 500-4 800 MHz and 5 850-6 700 MHz bands for possible identification for IMT, if appropriate
�
� |
WP 4A
� |
2013-05-27 |
|
[ 132 ]
�
� |
Liaison statement to Working Party 5D (copy to Joint Task Group 4-5-6-7) - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments
�
� |
WP 4A
� |
2013-05-27 |
|
[ 131 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to working Party 5D) - Suitable frequency ranges for IMT above 6 GHz
�
� |
WP 4A
� |
2013-05-27 |
|
[ 130 ]
�
� |
Further consideration of the coexistence of radar systems in the frequency band 2 700-3 100 MHz - Rationalisation of the band for potential future sharing with IMT systems under WRC-15 Agenda item 1.1
�
� |
Telstra Corporation Ltd.
� |
2013-05-13 |
|
[ 129 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2
�
� |
WP 6A
� |
2013-05-09 |
|
[ 128 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 Agenda item 1.2
�
� |
WP 6A
� |
2013-05-09 |
|
[ 127 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - SAB/SAP parameters for sharing studies under WRC-15 Agenda item 1.2
�
� |
WP 6A
� |
2013-05-20 |
|
[ 126 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Technical and operational characteristics of terrestrial television broadcasting for sharing and compatibility studies between the broadcasting service and the mobile service under WRC-15 Agenda item 1.1
�
� |
WP 6A
� |
2013-05-09 |
|
[ 125 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Spectrum requirements for the broadcasting service under WRC-15 Agenda item 1.2
�
� |
WP 6A
� |
2013-05-09 |
|
[ 124 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Technical and operational characteristics for the radio astronomy service for WRC-15 Agenda item 1.1
�
� |
WP 7D
� |
2013-04-16 |
|
[ 123 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - Technical and operational considerations of EESS (active) systems in the 5 350-5 470 MHz band
�
� |
WP 7C
� |
2013-04-16 |
|
[ 122 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Paty 5D) - Relevant ITU-R Recommendations and Reports pertaining to protection criteria and system characteristics of the science services allocated in certain bands above 6 GHz
�
� |
WPs 7B and 7C
� |
2013-04-15 |
|
[ 121 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 - EESS (passive) protection criteria in the 1 400-1 427 MHz band to be considered under WRC-15 Agenda item 1.1
�
� |
WP 7C
� |
2013-04-11 |
|
[ 120 ]
�
+Corr.1� |
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Commitee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)
�
� |
World Meteorological Organization
� |
2013-03-06 |
|
[ 119 ]
�
� |
Liaison statement to ITU-R Working Parties 5A, 5B, 5D and Joint Task Group 4-5-6-7 - WRC-15 Agenda item 1.1 - IMO's concerns in relation to the wide range of frequency bands identified by ITU-R for future assessment of the suitability for IMT
�
� |
International Maritime Organization
� |
2013-02-28 |
|
[ 118 ]
�
� |
Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)
�
� |
WP 5D
� |
2013-02-18 |
|
[ 117 ]
�
� |
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz
�
� |
WP 5D
� |
2013-02-18 |
|
[ 116 ]
�
� |
Liaison statement to JTG 4-5-6-7 on adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 Agenda item 1.2 (copy to Working Party 1A and Working Party 6A for information)
�
� |
WP 5D
� |
2013-02-18 |
Results:715 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):