Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP-7C : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP-7C� C�

UIT-R�WP-7C

Syst�mes de T�l�d�tection

Resultats:531 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 31 ]
Liaison statement to Working Party 7C - Protection of EESS (passive) systems operating in bands above 92 GHz and up to 174.8 GHz � WP 7C 2020-08-05
[ 30 ]
Reply liaison statement to Working Party 7C - Preparation for WRC-23 agenda item 1.14 - Radiodetermination and aeronautical characteristics in the frequency band 231.5-252 GHz � WP 5B AI1.14 2020-07-27
[ 29 ]
Reply liaison statement to Working Party 7C - Preparation for WRC-23 agenda item 1.12 - Radiodetermination characteristics in or adjacent to the frequency band 40-50 MHz � WP 5B AI1.12 2020-07-27
[ 28 ]
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups) � Chairman, CCV 2020-07-14
[ 27 ]
Reply liaison statement on work being carried out in ITU-T SG5 on human exposure to EMF from ICTS (reply to ITU-D Q7/2 -SG2RGQ/200) � ITU-T SG 5 2020-07-13
[ 26 ]
Relevance of the frequency band 10.6-10.7 GHz studies conducted under WRC-23 agenda item 1.15 � Germany (Federal Republic of) AI1.15 2020-07-06
[ 25 ]
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other Subordinate Groups � Director, BR 2020-06-25
[ 24 ]
Preliminary position on WRC-23 agenda � World Meteorological Organization 2020-05-13
[ 23 ]
Liaison statement to Working Parties 3M, 5A, 5C, 7C and 7D requesting characteristics for use in sharing studies under WRC-23 agenda item 1.13 (Working Party 5B for information and action if appropriate) � WP 7B AI1.13 2020-04-28
[ 22 ]
+Ann.1-14
Report of the meeting of Working Party 7C (e-Meeting, 21-24 April 2020) � Chairman, WP 7C 2020-04-24
[ 21 ]
Final List of Participants - Working Party 7C (E-meeting, 21-24 April 2020) � Director, BR 2020-04-24
[ 20 ]
Report of Study Group 7 outcome (20 April 2020) relevant to Working Part 7C � Chairman, WP 7C 2020-04-21
[ 19 ]
List of documents issued (Documents 7C/1 - 7C/20) � BR Study Groups Department 2020-04-17
[ 18 ]
Proposed liaison statement to Working Party 5D (copy to Working Parties 5B, 4A and 7B) � France 2020-04-13
[ 17 ]
Proposed draft reply liaison statement to Working Party 5D � Germany (Federal Republic of) , France 2020-04-14
[ 16 ]
Proposed liaison statement to Working Party 5C � France 2020-04-13
[ 15 ]
Working document toward a preliminary draft new Report ITU-R RS.[GROUND_PASS_SENSORS] � France , Switzerland (Confederation of) 2020-04-13
[ 14 ]
Proposed liaison statement to Working Party 6A � France 2020-04-13
[ 13 ]
Proposed liaison statement to Working Party 5A � France 2020-04-13
[ 12 ]
Views on the need to update the preliminary draft revision of Recommendation ITU-R RS.1861 - Typical technical and operational characteristics of Earth exploration-satellite service (passive) systems using allocations between 1.4 and 275 GHz � United States of America 2020-04-13
[ 11 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B and 5C (copy to Working Parties 3J and 3M for information) � United States of America 2020-04-13
[ 10 ]
Draft reply liaison statement to ITU-R Working Party 3J - Earth surface bistatic scattering coefficient prediction � European Space Agency 2020-04-14
[ 9 ]
Draft reply liaison to Working Party 3J - Earth surface bistatic scattering coefficient prediction � Institute of Electrical and Electronics Engineers, Inc. 2020-04-10
[ 8 ]
Lack of mutual planning between EESS (active) and RAS in design of the impending Earthcare 94 GHz cloud-profiling radar mission � Scientific Committee on Frequency Allocations for Radio Astronomy and Space Science 2020-04-08
[ 7 ]
Contribution to Working Parties 7A, 7B, 7C and 7D on relevant agenda item of WRC-23 � Iran (Islamic Republic of) 2020-03-23
[ 6 ]
(Rev.1)
Organisation of the work of Working Party 7C � Chairman, WP 7C 2020-03-19
[ 5 ]
Liaison statement to Working Parties 3K and 3M (for information to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D) - Preparations for WRC-23 agenda items 1.1 and 1.2 � WP 5D AI1.2, AI1.1 2020-03-06
[ 4 ]
Liaison statement to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 7B and 7C - Preparations for WRC-23 agenda item 1.2 � WP 5D AI1.2 2020-03-06
[ 3 ]
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, and 7D - Information for studies on WRC-23 agenda item 1.4 � WP 5D AI1.4 2020-03-06
[ 2 ]
Reply liaison statement to ITU-R Working Party 5B (copy for information to Working Party 7C) - Deployment of Foreign Object Debris detection radars in the 92-100 GHz frequency range at airports globally � International Civil Aviation Organization 2020-03-02
[ 1 ]
Documents to be carried over from the 2015-2019 study period � WP 7C 2019-10-31
Resultats:531 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2024-05-29