Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 810 ]
�
� |
Update on activities in Region 2
�
� |
Region 2 Rapporteur
� |
� |
2018-01-22 |
|
[ 809 ]
�
� |
Proposals for further consideration in the framework of Recommendation ITU-R M.1036 the frequency bands not identified for IMT
�
� |
Russian Federation
� |
� |
2018-01-22 |
|
[ 808 ]
�
� |
Proposals on modifications into working document towards a preliminary draft new Report ITU-R M.[IMT.MTC]
�
� |
Russian Federation
� |
� |
2018-01-22 |
|
[ 807 ]
�
� |
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[IMT&BSS COMPATIBILITY] and the draft CPM text related to agenda item 9.1, issue 9.1.2 - WRC-19 agenda item 9.1, issue 9.1.2
�
� |
United States of America
� |
AI9.1
� |
2018-01-22 |
|
[ 806 ]
�
� |
Draft reply liaison statement to Working Party 1C - ACLR measurements for IMT technologies
�
� |
United States of America
� |
� |
2018-01-22 |
|
[ 805 ]
�
� |
Proposed update to the working document towards a preliminary draft new [RECOMMENDATION OR REPORT] ITU-R M.[MSS&IMT-ADVANCED SHARING] and proposed liaison statement from Working Party 4C to Working Party 5D
�
� |
United States of America
� |
� |
2018-01-22 |
|
[ 804 ]
�
� |
Proposed updates to the working document towards a preliminary draft CPM text for WRC-19 agenda item 9.1, issue 9.1.1
�
� |
United States of America
� |
AI9.1
� |
2018-01-22 |
|
[ 803 ]
�
� |
Working document towards draft CPM text - For WRC-19 issue 9.1.8 (MTC)
�
� |
United States of America
� |
� |
2018-01-22 |
|
[ 802 ]
�
� |
Working document towards a PDN Report [IMT.MTC] on the use of the terrestrial component of International Mobile Telecommunication (IMT) for narrowband and broadband Machine-Type Communication (MTC)
�
� |
United States of America
� |
� |
2018-01-22 |
|
[ 801 ]
�
� |
Draft reply liaison statement to Working Party 7A
�
� |
Russian Federation
� |
� |
2018-01-19 |
|
[ 800 ]
�
� |
Proposed modifications to working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]
�
� |
Russian Federation
� |
AI9.1
� |
2018-01-19 |
|
[ 799 ]
�
� |
Proposed updates to the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.2
�
� |
Russian Federation
� |
AI9.1
� |
2018-01-19 |
|
[ 798 ]
�
� |
Proposed update to the draft CPM text for WRC-19 agenda item 9.1, issue 9.1.1
�
� |
Russian Federation
� |
AI9.1
� |
2018-01-19 |
|
[ 797 ]
�
� |
Working document towards a preliminary draft new Report ITU-R M.[RADAR&IMT-ADVANCED SHARING] - Sharing and compatibility studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz
�
� |
Australia
� |
� |
2018-01-19 |
|
[ 796 ]
�
� |
Response to the Liaison Statement from ITU-R on "Availability of Addendum 3 to Circular Letter 5/LCCE/59 related to proposals for candidate radio interface technologies for the terrestrial components of the radio interface(s) for IMT-2020 and their subsequent evaluation"
�
� |
TSDS, India (TSDSI)
� |
� |
2018-01-17 |
|
[ 795 ]
�
� |
Evaluation activity update (TTA SPG33)
�
� |
Director, BR
� |
� |
2018-01-16 |
|
[ 794 ]
�
� |
Further information regarding Documents 1/108-1A/262-1C/122-5D/790, 5D/791 and 5D/792
�
� |
Director, BR
� |
� |
2018-01-12 |
|
[ 793 ]
�
� |
DECT information regarding the update of Recommendation ITU-R M.1457
�
� |
European Telecommunications Standards Institute
� |
Q229/5
� |
2017-12-27 |
|
[ 792 ]
�
� |
Liaison statement on new work item K.pim "Passive intermodulation test methods of array antenna systems in mobile communication systems"
�
� |
ITU-T SG 5
� |
� |
2017-12-19 |
|
[ 791 ]
�
� |
Liaison statement on EMI requirement study above 6 GHz for future 5G
�
� |
ITU-T SG 5
� |
� |
2017-12-19 |
|
[ 790 ]
�
� |
Liaison statement on proposals to Recommendation ITU-R SM.329 about unwanted emission test
�
� |
ITU-T SG 5
� |
� |
2017-12-19 |
|
[ 789 ]
�
� |
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 7B and 7C - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 788 ]
�
� |
Reply liaison statement to Working Parties 5D and 1C - Unwanted emissions of IMT-2020 systems utilizing active antenna systems and total radiated power
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 787 ]
�
� |
Reply liaison statement to ITU-T Study Group 15 (copy for information to Working Parties 5A, 5B, 5C, 5D and 6A) - Liaison Activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) Standards Overviews and Work Plans
�
� |
WP 1A
� |
� |
2017-12-12 |
|
[ 786 ]
�
� |
Liaison statement to Working Party 5D - Work on WRC-19 agenda item 9.1, issue 9.1.8
�
� |
WP 1B
� |
AI9.1
� |
2017-12-08 |
|
[ 785 ]
�
� |
Reply liaison statement to Working Party 5A (copy to Working Party 5D for information) - Work on WRC-19 agenda item 9.1, issue 9.1.8
�
� |
WP 1B
� |
� |
2017-12-08 |
|
[ 784 ]
�
� |
Liaison statement on unwanted emissions of IMT-2020
�
� |
Director, BR
� |
� |
2017-12-07 |
|
[ 783 ]
�
� |
Liaison statement to Working Party 5D - IMT-2020 technologies for broadband PPDR
�
� |
WP 5A
� |
� |
2017-12-06 |
|
[ 782 ]
�
� |
Liaison statement on Setting Environmental requirements for 5G/IMT-2020
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 781 ]
�
� |
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D
�
� |
ITU-T SG 5
� |
� |
2017-11-23 |
|
[ 780 ]
�
� |
Liaison statement to Working Party 5D - Work on WRC-19 agenda item 9.1, issue 9.1.8
�
� |
WP 5A
� |
� |
2017-11-22 |
|
[ 779 ]
�
� |
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C, 7D and Task Group 5/1 (and copy to Working Parties 3M and 5B for information) - WRC-19 agenda item 1.14
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 778 ]
�
� |
Liaison statement to Working Parties 5A, 5D and 6A - Draft revision of Report ITU-R F.2323-0
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 777 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5D, Task Group 5/1, 6A, 7B, 7C and 7D - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz
�
� |
WP 5C
� |
� |
2017-11-22 |
|
[ 776 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5C, 5D, 6A, 7C, 7B, 7D and 3M - Draft documents including draft CPM text related to WRC-19 agenda item 1.10, Resolution 426 (WRC-15)
�
� |
WP 5B
� |
AI1.10
� |
2017-11-20 |
|
[ 775 ]
�
� |
Liaison statement to Working Party 5D - Studies between IMT-Advanced systems in 3 300-3 400 MHz and radiolocation systems in 3 100-3 400 MHz
�
� |
WP 5B
� |
� |
2017-11-20 |
|
[ 774 ]
�
� |
Reply liaison statement to ITU-R Working Party 1B (copy to Workking Party 5D for informaiton) - Work on WRC-19 agenda item 9.1, Issue 9.1.8
�
� |
WP 5A
� |
� |
2017-11-17 |
|
[ 773 ]
�
� |
Reply liaison statement to Working Party 1A (copied to Working Parties 5B, 5C and 5D for information) - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services
�
� |
WP 5A
� |
� |
2017-11-17 |
|
[ 772 ]
�
� |
Reply liaison statement to Working Party 5D (copy for information to Working Party 6A) - WRC-19 agenda item 9.1, issue 9.1.2
�
� |
WP 4A
� |
AI9.1
� |
2017-11-07 |
|
[ 771 ]
�
� |
Reply liaison statement to Working Party 1A (copy for information to Working Parties 4C, 5A, 5B, 5C, 5D, 7B and 7C) - System parameter tables in Recommendation ITU-R SM.1448 and Appendix 7 (Rev. WRC-15) of the Radio Regulations
�
� |
WP 4A
� |
� |
2017-11-01 |
|
[ 770 ]
�
� |
Liaison statement to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 6B, 6C, 7B, 7C and 7D - Study on Resolution 655 (WRC-15) �Definition of time scale and dissemination of time signals via radiocommunication systems�
�
� |
WP 7A
� |
� |
2017-11-01 |
|
[ 769 ]
�
� |
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI1.3
� |
2017-11-01 |
|
[ 768 ]
�
� |
Liaison statement to Working Party 6A (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
� |
2017-11-03 |
|
[ 767 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7C and 7D concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7
�
� |
WP 7B
� |
AI.1.7
� |
2017-11-01 |
|
[ 766 ]
�
� |
Liaison statement to Working Party 4A (copy to Working Parties 5A, 5C, 5D) - WRC-19 agenda items 1.6 and 9.1 (issue 9.1.9)
�
� |
WP 7C
� |
� |
2017-10-31 |
|
[ 765 ]
�
(Rev.1)� |
Liaison statement to ITU-R Working Parties 1A and 1C (copy to Working Parties 5D and 6A) - Interference to EESS (passive) sensors operating in the 1 400-1 427 MHz band caused by radiations at the intermediate frequency of satellite broadcast receiver equipment
�
� |
WP 7C
� |
� |
2017-10-31 |
|
[ 764 ]
�
� |
Liaison statement to ITU-R Working Party 5D (copy to ITU-R WPs 5A, 5C, 6A and 6B) - Draft revision of Report ITU-R M.2373
�
� |
WP 6C
� |
� |
2017-10-24 |
|
[ 763 ]
�
� |
Liaison statement to Working Party 7B (copy to Working Parties 4A, 4C, 5A, 5B, 5C and 5D) - WRC-19 agenda item 1.7
�
� |
WP 6A
� |
AI1.7
� |
2017-10-24 |
|
[ 762 ]
�
� |
Liaison statement to ITU-R Working Party 5D (copy to ITU-R WPs 6A and 6C) - Comments on working document towards draft revision of Report ITU-R M.2373
�
� |
WP 6B
� |
� |
2017-10-23 |
|
[ 761 ]
�
� |
Liaison statement to Working Party 5D - Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect to systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz
�
� |
WP 4C
� |
� |
2017-10-23 |
Resultados :1310 documentos Resultados :�
Anterior�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27
�-�Siguiente
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):