Contributions�� |
�
|
Number�
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 1890 ]
�
� |
G.8261.1: Notes on network equipments producing excessive PDV
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1889 ]
�
� |
G.8261.1: Editorial comments on latest draft
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1888 ]
�
� |
G.8260: Request for clarification about the MAFE corner point
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1887 ]
�
� |
G.8260: Comments on latest draft
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1886 ]
�
� |
Transport of CPRI interface over OTN
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1885 ]
�
� |
Proposal for reply to 3GPP liaison "Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization"
�
� |
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1884 ]
�
� |
G.8263: revised text for Appendix II dealing with Packet Delay Variation Noise Tolerance testing
�
� |
Calnex Solutions Limited
,
France T�l�com Orange
� |
Q13/15
� |
2011-11-22 |
|
[ 1883 ]
�
� |
Y.1731 extension for Throughput Measurement
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15, Q10/15
� |
2011-11-22 |
|
[ 1882 ]
�
� |
Model for Ethernet Remote Customer Service Interfaces
�
� |
Huawei Technologies Co. Ltd.
� |
Q12/15
� |
2011-11-22 |
|
[ 1881 ]
�
� |
Transport Entity Role Examples
�
� |
Huawei Technologies Co. Ltd.
� |
Q12/15
� |
2011-11-22 |
|
[ 1880 ]
�
� |
The proposal about service frame delivery in G.8011.4 and G.8011.2
�
� |
China Telecommunications Corporation
� |
Q10/15
� |
2011-11-22 |
|
[ 1879 ]
�
� |
Performance analysis of IEEE1588v2 time distribution through OTN Client signals when power restart and board reset
�
� |
China Telecommunications Corporation
� |
Q13/15
� |
2011-11-22 |
|
[ 1878 ]
�
(Rev.1)� |
Further Consideration of the Enhancement of LMM/LMR to support proactive LM
�
� |
Huawei Technologies Co. Ltd.
� |
Q9/15, Q10/15
� |
2011-11-22 |
|
[ 1877 ]
�
(Rev.1)� |
Another EOTN Equipment Type in G.798.1
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1876 ]
�
(Rev.1)� |
Correction of ODUkP_TT and ODUkT_TT function in G.798
�
� |
Electronics and Telecommunications Research Institute (ETRI)
� |
Q9/15
� |
2011-11-22 |
|
[ 1875 ]
�
� |
G.fast: On the Synchronous TDMA framing structure
�
� |
ADTRAN
� |
Q4/15
� |
2011-11-22 |
|
[ 1874 ]
�
(Rev.1)� |
G.vector: Initialization for Simultaneous Joining Lines
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1873 ]
�
(Rev.1)� |
G.fast: Proposal to create an annex for mobile backhaul application
�
� |
Telefon AB - LM Ericsson
� |
Q4/15
� |
2011-11-22 |
|
[ 1872 ]
�
(Rev.1)� |
G.fast: TDD Frame Structure and Timing Overhead
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1871 ]
�
� |
Comments on draft revised G.872
�
� |
Deutsche Telekom AG
� |
Q12/15
� |
2011-11-22 |
|
[ 1870 ]
�
� |
Hazard influence in telecommunications by VDSL2 technology
�
� |
Brazil
� |
Q4/15
� |
2011-11-22 |
|
[ 1869 ]
�
(Rev.1)� |
Proposal for a new recommendation G.wavereuse based on wavelength re-use
�
� |
Finisar Corporation
,
LG-Ericsson
,
Telefon AB - LM Ericsson
� |
Q6/15, Q2/15, Q12/15, Q11/15
� |
2011-11-22 |
|
[ 1868 ]
�
(Rev.1)� |
G.fast: Point-to-Point Distribution is the Right Choice for G.fast
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1867 ]
�
(Rev.1)� |
Ciena's views on Progressing work on Recs. G.8113.1 and G.8113.2
�
� |
Ciena Corporation
� |
Q12/15
� |
2011-11-22 |
|
[ 1866 ]
�
(Rev.1)� |
G.hnem: proposal of transmission parameters for extremely robust mode (ERM)
�
� |
Yitran Communications Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1865 ]
�
(Rev.1)� |
[G.fast] Clarification of BT requirement for SELT
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2011-11-22 |
|
[ 1864 ]
�
(Rev.1)� |
G.fast: Equal-Length FEXT Measurements on PE05 Cable
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1863 ]
�
(Rev.1)� |
G.hnem Proposal to update the PRBS seed values from which the preamble is generated
�
� |
Yitran Communications Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1862 ]
�
(Rev.1)� |
G.fast: Target Bit Error Rate of G.fast at Gamma Interface
�
� |
Huawei Technologies Co. Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1861 ]
�
� |
Withdrawn, duplicate - Superseded by C-1929
�
Withdrawn
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
� |
Q6/15
� |
2011-11-22 |
|
[ 1860 ]
�
� |
Withdrawn, duplicate of C-1863
�
Withdrawn
� |
Yitran Communications Ltd.
� |
Q4/15
� |
2011-11-22 |
|
[ 1859 ]
�
(Rev.1)� |
[G.fast] G.fast start-up using G.994.1
�
� |
British Telecommunications Public Ltd. Co. (BT Plc)
� |
Q4/15
� |
2011-11-22 |
|
[ 1858 ]
�
� |
Black Link related amendments to G.872
�
� |
Deutsche Telekom AG
� |
Q12/15
� |
2011-11-22 |
|
[ 1857 ]
�
� |
Architectural models of OTN transport services
�
� |
Deutsche Telekom AG
� |
Q12/15
� |
2011-11-22 |
|
[ 1856 ]
�
� |
Strong FEC for 40 Gbit/s Black Link applications
�
� |
Deutsche Telekom AG
� |
Q11/15
� |
2011-11-22 |
|
[ 1855 ]
�
� |
Rational for new low bit rate interfaces for the OTN
�
� |
Deutsche Telekom AG
� |
Q6/15, Q11/15
� |
2011-11-22 |
|
[ 1854 ]
�
(Rev.1)� |
Clarification questions on MCC PDU definition in Y.1731
�
� |
Alcatel-Lucent Italia S.p.A.
� |
Q10/15
� |
2011-11-22 |
|
[ 1853 ]
�
(Rev.1)� |
Alignment on dUNP between Y.1731 and G.8021
�
� |
Alcatel-Lucent Italia S.p.A.
� |
Q9/15, Q14/15, Q10/15
� |
2011-11-22 |
|
[ 1852 ]
�
� |
Withdrawn
�
Withdrawn
� |
Electronics and Telecommunications Research Institute (ETRI)
,
KT Corporation
,
LG-Ericsson
� |
Q6/15
� |
2011-11-22 |
|
[ 1851 ]
�
(Rev.1)� |
Proposed clarifications for Ethernet CSF Description in Y.1731
�
� |
Alcatel-Lucent Italia S.p.A.
� |
Q10/15
� |
2011-11-22 |
|
[ 1850 ]
�
(Rev.1)� |
Proposed changes to G.8021 to avoid dLOC flapping
�
� |
Alcatel-Lucent Italia S.p.A.
� |
Q9/15
� |
2011-11-22 |
|
[ 1849 ]
�
� |
Draft document of G.multi
�
� |
Huawei Technologies Co. Ltd.
� |
Q2/15
� |
2011-11-22 |
|
[ 1848 ]
�
(Rev.1)� |
Proposed relationship of security related ME/attributes and OMCI MIB audit/sync increment
�
� |
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
� |
Q2/15
� |
2011-11-22 |
|
[ 1847 ]
�
� |
China Propose to make progress on MPLS-TP OAM Standardization
�
� |
China
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1846 ]
�
� |
Some parameters consideration in G.sup39
�
� |
China
� |
Q6/15
� |
2011-11-22 |
|
[ 1845 ]
�
� |
Create a new recommendation about "Field Mountable optical fibre Connector"
�
� |
China
� |
Q7/15
� |
2011-11-22 |
|
[ 1844 ]
�
� |
Requirements for L0/L1/L2 Multi-layer Convergence Network
�
� |
China
,
China Mobile Communications Corporation
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1843 ]
�
� |
G.8113.1 MPLS-TP OAM and G.8131.1 APS interoperability test activities and results
�
� |
China
,
China Mobile Communications Corporation
� |
Q9/15, Q14/15, Q12/15, Q10/15
� |
2011-11-22 |
|
[ 1842 ]
�
� |
Providing experience and information for ITU-T new recommendation L.xxx
�
� |
China
� |
Q16/15
� |
2011-11-22 |
|
[ 1841 ]
�
� |
Proposal of RS422 1PPS time/phase as a time measurement interface
�
� |
China
,
China Mobile Communications Corporation
,
Huawei Technologies Co. Ltd.
,
ZTE Corporation
� |
Q13/15
� |
2011-11-22 |
Results:2390 total items. Result page:�
Previous�-�
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
32 -
33 -
34 -
35 -
36 -
37 -
38 -
39 -
40 -
41 -
42 -
43 -
44 -
45 -
46 -
47 -
48
�-�Next
� |
Multiple Document Download:�Formats and Languages to be included (when available):