International Telecommunication Union ITU
Fran�aisEspa�ol
Site map Contact Us Print version
Home : ITU-R : WP5B : Contributions� Recently posted�-� Search Meeting Documents
ITU-R�WP5B� C�

ITU-R�WP5B

Maritime mobile service including Global Maritime Distress and Safety System (GMDSS); aeronautical mobile service and radiodetermination service

Results:731 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 �-�Next Next
Contributions��Documents / Contributions

Number
Title Source AI/Question
Date
[ 231 ]
Liaison statement to Working Parties 3M (for action) and Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A (for information) � WP 7B 2017-04-07
[ 230 ]
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A and Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 � WP 7B 2017-04-07
[ 229 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 4A, 4C, 5A, 5B, 6A, 7B, 7C) - Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunication services � WP 7D 2017-04-07
[ 228 ]
Liaison statement to Working Party 1B (copy to Working Parties 1A, 5B, 5C, 6A and 7A for information) - Studies on "Wireless power transmission (WPT)" � WP 7D AI1.9 2017-04-07
[ 227 ]
Liaison statement to Task Group 5/1 (copy to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Preparations for WRC-19 agenda item 1.13 � Chairman, WP 6A AI1.13 2017-04-05
[ 226 ]
+Ann.1
Additional information on the preparation of text for the draft CPM Report to WRC-19 � Director, BR 2017-04-04
[ 225 ]
Liaison statement to Working Party 1A (copied for information to Working Party 5B) - Proposed new Report ITU-R SM.[NAT-APR] � WP 6A 2017-04-03
[ 224 ]
Liaison statement to Working Parties 1A and 1B, and to their Rapporteur Group on WPT issues, to Working Party 5B, and to the Study Group 1 Rapporteur Group on liaison with CISPR and Rapporteur to CISPR on WPT issues (copy for information to Working Parties 5A, 5C, 7A & 7D) - Liaison between ITU-R and CISPR � WP 6A 2017-04-03
[ 223 ]
Liaison statement to Working Parties 1A, 1B and their Rapporteur Group on WPT issues (copy for information to Working Parties 5A, 5B, 5C, 7A & 7D) - Developments on Wireless Power Transfer under Question ITU-R 210-3/1 and issue 9.1.6 of WRC-19 � WP 6A Q210-3/1 2017-04-03
[ 222 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4 � WP 3M 2017-03-31
[ 221 ]
Liaison statement to Task Group 5/1 (copy for information to Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Guidance on the use of ITU-R P-Series Recommendations for interference prediction and sharing studies under WRC-19 agenda item 1.13 � WPs 3K, 3J & 3M AI1.13 2017-04-03
[ 220 ]
Preliminary position on WRC-19 agenda � World Meteorological Organization 2017-03-20
[ 219 ]
Liaison statement to Working Party 5B - AMS parameters and work progress on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz � WP 5D 2017-02-28
[ 218 ]
Liaison statement to Working Parties 4A, 5A, 5B and 5C - Technical and operational parameters and deployment characteristics for IMT-2020 for use in sharing studies under WRC-19 agenda items � WP 5D 2017-02-28
[ 217 ]
Liaison statement to ITU-R Coordination Committee for Vocabulary (CCV) and ITU-T Standardization Committee for Vocabulary (SCV) on broadband definition (copy to ITU-D Study Group 1 Question 2/1, ITU-R Working Parties 4A, 4B, 4C, 5A, 5C and 6A) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband? � WP 5D 2017-02-24
[ 216 ]
Reply liaison statement to ITU-R Working Party 1B (copy to Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means... � WP 5D 2017-02-24
[ 215 ]
Liaison statement to ITU-D Study Group 1 Question 2/1 on broadband definition (copy to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D and 6A for information) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband? � CCV and SCV 2017-01-30
[ 214 ]
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands... � WP 1B 2016-12-14
[ 213 ]
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group on WDTC Resolution 9 and ITU-D Study Group 1 for information) � WP 1B 2016-12-14
[ 212 ]
Liaison statement to Working Parties 1A, 5B, 5C, 6A, 7A and 7D - Studies on "Wireless power transmission (WPT)" � WP 1B 210/1 2016-12-14
[ 211 ]
Liaison statement to Working Parties 1A, 5B and 6A - Studies on WRC-19 agenda item 9.1, issue 9.1.6 (Resolution 958 (WRC-15) Annex item 1) "Wireless power transmission" � WP 1B AI9.1 2016-12-14
[ 210 ]
Reply liaison statement to Working Party 7D (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges fr wireless power transfer (WPT) � WP 1A Q210/1 2016-12-13
[ 209 ]
Reply liaison statement to Working Party 6A (copy to Working Parties 1B, 1C, 5A, 5B, 5C, 7A and 7D) - Radio frequency ranges for wireless power transmission (WPT) � WP 1A 2016-12-13
[ 208 ]
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges or wireless power transmission using technolgies other than Radio Frequency Beam � WP 1A Q210/1 2016-12-13
[ 207 ]
Liaison statement to Working Parties 5B and 6A - Proposed revision of Recommendation ITU-R SM.1009-1 � WP 1A 2016-12-13
[ 206 ]
Liaison statement to Working Parties 1C, 3L, 5A, 5B, 5C, 6A, 7A and 7D - Assessment of the impact of unwanted radio frequency energy generated by non-radiocommunication equipment to radiocommunication services (Questions ITU-R 221-2/1 and ITU-R 236/1) � WP 1A 2016-12-13
[ 205 ]
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014) � WP 1A 2016-12-13
[ 204 ]
Reply liaison statement to Working Parties 3M and 3J (copied for information to Working Parties 4A, 5B and 5C) - Evaluation of the differences between Recommendations ITU-R P.620-6 and ITU-R P.620-4 � WP 1A 2016-12-13
[ 203 ]
Liaison statement to Working Party 5B - WRC-19 agenda item 9.1, issue 9.1.5 � WP 5A AI9.1 2016-11-29
[ 202 ]
Recommendation ITU-R P.681-9 - Propagation data required for the design of Earth-space land mobile telecommunication systems � SG 3 2016-11-24
[ 201 ]
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 AI 1.13 � WP 5A AI1.13 2016-11-23
[ 200 ]
Liaison statement to Working Party 7C (copied to Working Parties 3L, 5B, 5C and 6A for information) - Technical and operational characteristics for systems operating within the 40-50 MHz frequency range � WP 5A 2016-11-23
[ 199 ]
Liaison statement to Working Party 5B - WRC-19 agenda item 1.9.2 � WP 5A AI1.9.2 2016-11-23
[ 198 ]
Liaison statement to Working Party 5B - Wind profiler radar characteristics in the 50-54 MHz frequency band to be used in sharing studies with the amateur service under agenda item 1.1 � WP 5A AI1.1 2016-11-23
[ 197 ]
Liaison statement to Working Parties 1A and 1B (copy for information to Working Party 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use � WP 5A 2016-11-18
[ 196 ]
Liaison statement to ITU-D Study Group 1 (SG1), Question 2/1 (copy to ITU-R Coordination Committee for Vocabulary (CCV); Working Parties 4A, 4B and 4C; Working Parties 5B and 5D; Working Party 6A for information) - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband? � WPs 5A and 5C 2016-11-18
[ 195 ]
+Ann.1-39
Report on the meeting of Working Party 5B (Geneva, 7-18 November 2016) � Chairman, WP 5B 2016-11-18
[ 194 ]
Final list of participants - Working Party 5B (Geneva, 7-18 November 2016) � Director, BR 2016-11-18
[ 193 ]
Reply liaison statement to Working Party 1A (copy to Working Parties 1B, 5A, 5B, 6A, 7A and 7D for information) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam � WP 5C 2016-11-17
[ 192 ]
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz � WP 5C 2016-11-16
[ 191 ]
Reply liaison statement to Working Party 5B on technical characteristics for the fixed service for studies under WRC-19 agenda item 1.9.2 (copy to Working Parties 1A, 3M, 4C, 5A, 6A, 7B and 7D for information) � WP 5C 2016-11-16
[ 190 ]
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 3J, 3K, 3M, 4A, 4C, 5B and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16 � WP 5C 2016-11-16
[ 189 ]
Reply liaison statement to ITU-D Study Group 2, Working Party 1C (copy to Working Parties 1B, 3L, 4A, 5A, 5B, 6A for information) - ITU-D Question 7/2: strategies and policies concerning human exposure to electromagnetic fields � WP 5C 2016-11-16
[ 188 ]
Liaison statement to Working Party 5A (copy to Working Parties 1A, 1B, 4A, 5B and 5D for information) - Study of sharing schemes in the land mobile service on the basis of geographical use � WP 5C 2016-11-16
[ 187 ]
List of documents issued (Documents 5B/71 - 5B/187) � BR Study Groups Department 2016-11-04
[ 186 ]
Liaison statement to Working Party 1A (copy for information to Working Party 5B) - Proposed revision of Recommendation ITU-R SM.1009-1 � WP 6A 2016-11-04
[ 185 ]
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) WRC-19 agenda item 1.1 � WP 6A AI1.1 2016-11-04
[ 184 ] �
This document has been withdrawn � WP 6A 2016-11-04
[ 183 ]
Liaison statement to ITU-R Working Party 5B - UN/LOCODE � United Nations Economic Commission for Europe 2016-11-03
[ 182 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3J, 3K, 3M, 4C, 5A, 5B, 5C and 5D) - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz � WP 4A 2016-11-02
Results:731 total items.
Result page:� Previous�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 �-�Next Next
Multiple Document Download:�Check the boxes of the selected documents, then click "Zip and download"

User preferences:
Multiple Document Download:�Formats and Languages to be included (when available):
HTML Navigation Pages
Formats �+�Other formats
Languages (maximum 2) �+�Multilingual�
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top�-� Feedback�-� Contact Us�-� Copyright � ITU�2008�All Rights Reserved
Contact for this page :� ITU-R Web coordinator
Updated :�2019-10-18