Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : TSAG : R�union�2013-06-04�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�TSAG� TD�(2013-06-04)�

UIT-T�TSAG

Groupe Consultatif de la Normalisation des T�l�communications

P�riode d'�tudes 2013

R�union� du 2013-06-04 au 2013-06-07

Lieu : Suisse [Gen�ve]

Autres r�unions : 2016-07-182016-02-012015-06-022014-06-17� [ 2013-06-04 ]�

Resultats:87 documents
R�sultats :� Pr�c�dent�-� 1 - 2
Documents Temporaires �(GEN) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 0037 ]
LS/i on Report to TSAG from SG17 as the lead study group on identity management (IdM) � ITU-T SG17 2013-05-13
[ 0036 ]
LS/i on Report to TSAG from SG17 as the lead study group on languages and description techniques � ITU-T SG17 2013-05-13
[ 0035 ]
LS/i on the collaboration of cloud computing security work between SG13 and SG17 [to TSAG and ITU-T SG13] � ITU-T SG17 2013-05-10
[ 0034 ]
LS/i on Nomination of JCA-AHF representatives [to ITU-T Study Groups, TSAG and ITU-R Study Groups] � JCA-AHF 2013-05-10
[ 0033 ]
LS/i on Alignment of testing work between SG17 and SG11 to TSAG � ITU-T SG17 2013-05-03
[ 0032 ]
LS/i on the change of Question 8/17 text to TSAG � ITU-T SG17 2013-05-03
[ 0031 ]
Draft four-year Rolling Operational Plan for the 2014 to 2017 timeframe � Director, TSB 2013-05-03
[ 0030 ]
LS/i on the appointment of a new IETF Liaison Manager to the ITU-T for MPLS � IETF IAB 2013-05-01
[ 0029 ]
LS/i on Request to provide security contacts � ITU-T SG17 2013-05-01
[ 0028 ]
LS/i on Continuation of JCA-COP with revised ToR to TSAG � ITU-T SG17 2013-05-01
[ 0027 ]
LS/i on Continuation of JCA-IdM with revised ToR to TSAG � ITU-T SG17 2013-05-01
[ 0026 ]
Summary Report of the Workshop on ICT as an enabler for Smart Water Management, Luxor, Egypt, 14-15 April 2013 � Director, TSB 2013-05-01
[ 0025 ]
Summary of WTSA 2012 outcome for TSAG from ITU TSB Director � Director, TSB 2013-04-23
[ 0024 ]
(Rev.1-2)
Revised version of Rec. ITU-T A.23, Annex A � ITU-T Liaison Officer to JTC 1 2013-04-19
[ 0023 ]
LS/i on Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR) � ITU-T FG-DR&NRR 2013-04-17
[ 0022 ]
TSAG Remote Participation - Adobe Connect Guide � TSB 2013-04-16
[ 0021 ]
LS/i on the SG13 opinion on the separation of cloud computing security work between ITU-T SG13 and SG17 � ITU-T SG13 2013-04-11
[ 0020 ]
LS/i on the efforts taken and future plans on the separation of cloud computing security work between ITU-T SG13 and SG17 � ITU-T SG13 2013-04-11
[ 0019 ]
LS/i on Appointment of a new IETF Liaison Manager to the ITU-T � IETF IAB 2013-04-02
[ 0018 ]
LS/i on Plans for implementation of Resolution 77 and recommendations to TSAG � ITU-T SG13 2013-03-26
[ 0017 ]
LS/i on Study of signalling requirement and protocol on SDN � ITU-T SG11 2013-03-15
[ 0016 ]
LS/i on Alignment of testing work between SG11 and SG17 � ITU-T SG11 2013-03-15
[ 0015 ]
LS/i on Revised ToR of JCA-CIT � ITU-T SG11 2013-03-15
[ 0014 ]
LS/i on Continuation of JCA-Cloud with revised ToR � ITU-T SG13 2013-03-13
[ 0013 ]
(Rev.1)
Report of the ISO/IEC JTC 1 Plenary, 5-10 November 2012 � ITU-T Liaison Officer to JTC 1 2013-02-26
[ 0012 ]
LS/i on SG2, Lead Study Group on Service Definition, Numbering, and Routing; Lead Study Group for Telecommunication for Disaster Relief/Early Warning � ITU-T SG2 2013-02-19
[ 0011 ]
LS/i on Seeking Guidance on the implementation of exchanging work progress between SG2 and FG-DR&NRR � ITU-T SG2 2013-02-19
[ 0010 ]
LS/i on Creation of a new Focus Group on "Smart and Sustainable Cities" (FG-SSC) � ITU-T SG5 2013-02-13
[ 0009 ]
(Rev.1)
LS/i/r on Smart Grid and Home Networking (JCA-SG&HN) - OLS 2 - E about the Activities related to smart grid � ITU-T FG AVA 2013-02-11
[ 0008 ]
LS/i on Telecommunication Management and OAM Project Plan � ITU-T SG2 2013-02-05
[ 0007 ]
LS/i on Acknowledgement of contributors � ITU-T SG9 2013-02-05
[ 0006 ]
LS/i on Correction of title of Question 9/15 (QK/15) � ITU-T SG15 2013-01-30
[ 0005 ]
LS/i on Activities related to smart grid � Conveners, JCA-SG&HN ALL 2013-01-29
[ 0004 ]
LS/i on Invitation to participate in and provide input to the work of the Correspondence Group on the Elaboration of a Working Definition of the Term "ICT" � Chairman, ITU-D SG1 ALL 2013-01-29
[ 0003 ]
LS/i on Electronic Working Methods � ITU-T SG 15 ALL 2013-01-29
[ 0002 ]
LS/i to ITU-T Study Groups, ITU Sectors, TSAG, CWG-COP � JCA-COP ALL 2013-01-29
[ 0001 ]
LS/i to ITU-D Question 20-1 on funding persons with disabilities attending Focus Groups � Convener, JCA-AHF ALL 2013-01-29
Resultats:87 documents
R�sultats :� Pr�c�dent�-� 1 - 2
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2013-06-29