Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-T : SG15 : R�union�2011-02-14�: Documents Temporaires� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-T�SG15� TD-WP1�(2011-02-14)�

UIT-T�SG15

Transport network structures

P�riode d'�tudes 2009

R�union� du 2011-02-14 au 2011-02-25

Lieu : Suisse [Gen�ve]

Autres r�unions : 2012-09-10� 2012-05-11� 2011-12-052011-09-16� [ 2011-02-14 ]� 2010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultats:115 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 �-�Suivant Next
Documents Temporaires �(WP1) ��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 474-WP1 ]
iLS: VDSL Low Power Modes � BBF Q4/15 2011-02-03
[ 473-WP1 ]
iLS: Liaison report from ISO/IEC JTC 1/SC 25/WG 3 to ITU-T, IEC TC 100, TC 100/TA 5, ISO/IEC JTC 1/SC 6, ETSI ATTM; ATTM AT2, ATTM AT3 and EBU/CENELEC/ETSI JTC Broadcast � ISO/IEC JTC1/SC25/WG3 Q4/15 2011-02-03
[ 472-WP1 ]
(Rev.1)
Report: Full Q4/15 - Rapporteur Meeting covering DSL, G.hn, and G.hnem Hosted by Coppergate/Sigma in Kona, Hawaii � Rapporteur Q4/15 Q4/15 2011-02-02
[ 471-WP1 ]
iLS: Liaison to ITU-T Q4/15 Concerning VDSL2 Band Plans for Europe � ATTM TM6 Q4/15 2011-01-30
[ 470-WP1 ]
iLS: Regarding ITU-T standards for IP home networking and "Protocol for identifying home network topology", G.phnt � IETF IESG Q1/15 2011-01-28
[ 469-WP1 ]
iLS: Impact of PLT Systems on Radiocommunication systems operating in the VHF and UHF bands above 80 MHZ � ITU-R WP1A Q4/15 2011-01-21
[ 468-WP1 ]
Draft Recommendation ITU-T G.9980 - Resolution log � Editor G.9980 Q4/15, Q2/15, Q1/15 2011-02-23
[ 467-WP1 ]
iLS: Liaison to ITU-T Q4/15 on VDSL2 Band Plans for Europe � ETSI TC ATTM TM6 Q4/15 2011-01-19
[ 466-WP1 ]
(Rev.1)
WP1/15 interim activities � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2011-02-24
[ 465-WP1 ]
(Rev.1)
WP1/15 liaison statements � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2011-02-24
[ 464-WP1 ]
(Rev.1)
WP1/15 - Status of Recommendations � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2011-02-24
[ 463-WP1 ]
(Rev.1)
WP1/15 texts for consent and agreement at SG15 plenary � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2011-02-24
[ 462-WP1 ]
(Rev.1)
WP1/15 meeting report � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2011-02-24
[ 461-WP1 ]
(Rev.1-2)
WP1/15 Agenda � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2011-02-09
[ 460-WP1 ]
iLS: PAP15 NB PLC Standard Requirements � SGIP Q4/15 2010-12-15
[ 459-WP1 ]
iLS: Approval of TTC JJ-300.00, relevant document to G.phnt (former G.cmhn) � TTC Q1/15 2010-12-14
[ 458-WP1 ]
(Rev.1-2)
Draft Recommendation G.phnt "Protocol for identifying home network topology" � Editor G.phnt Q1/15 2010-12-10
[ 457-WP1 ]
iLS: Liaison statement to ITU-R Working Party 5D, ITU-T Study Groups 12, 15 and 16, and external organizations on "Quality of service requirements and objectives for wireless access systems" � ITU-R WP5A Q1/15 2010-12-07
[ 456-WP1 ]
(Rev.1-2)
Compendium of Meeting minutes from July 2010 to Jan 2011 � Rapporteur Q2/15 Q2/15 2011-02-03
[ 455-WP1 ]
Report of November 2010 Question 1/15 interim meeting � Rapporteur Q1/15 Q1/15 2010-12-02
[ 454-WP1 ]
iLS: Response to SG15 on "New versions of the access network transport (ANT) standardization overview and work plan" � ITU-T SG2 Q1/15 2010-11-30
[ 453-WP1 ]
iLS: Response to "Initiation of a new Recommendation "Configuration management for IP home networks" (G.cmhn)" � ITU-T SG2 Q1/15 2010-11-30
[ 452-WP1 ]
iLS: Liaison statement from ITU-T SG 15 on narrowband OFDM powerline communications and answer from ISO/IEC JTC 1/SC 25 � ISO/IEC JTC1/SC25 Q4/15 2010-11-29
[ 451-WP1 ]
iLS: Liaison from ETSI TC PLT to SG15 on "Coexistence on command and control" � ETSI TC PLT Q4/15 2010-11-26
[ 450-WP1 ]
iLS: WP 5C comments relating to PLT systems � ITU-R WP5C Q4/15 2010-11-23
[ 449-WP1 ]
iLS: ETSI TC PLT response to SG15 oLS 216 � ETSI TC PLT Q4/15, Q1/15 2010-11-23
[ 448-WP1 ]
iLS: OMCI for EPON Systems � IEEE P 1904.1 Q2/15 2010-11-04
[ 447-WP1 ]
iLS: Liaison from ETSI TISPAN WG5 to ITU-T regarding QoS and Mgt � ETSI TISPAN WG5 Q1/15 2010-11-02
[ 446-WP1 ]
oLS: G.hnem: Outgoing liaison to IEC � Editor G.hnem Q4/15 2010-10-22
[ 445-WP1 ]
oLS: G.hn: Outgoing liaison to IEEE NesCom � Editor G.hn Q4/15 2010-10-22
[ 444-WP1 ]
oLS: G.hn: Outgoing liaison to ETSI PLT � Editor G.hn Q4/15 2010-10-22
[ 443-WP1 ]
Report of the Q4/15 xDSL teleconference calls, October 4 and 7, 2010 � Editor G.adsl G.hs G.inp G.ploam G.vdsl Q4/15 2010-10-22
[ 442-WP1 ]
Report - October 2010 - Q4/15 - G.hn Rapporteur Meeting held in Geneva, Switzerland � Rapporteur Q4/15 Q4/15 2010-10-21
[ 441-WP1 ]
Report - October 2010 - Q4/15 - G.hnem Rapporteur Meeting held in Geneva, Switzerland � Rapporteur Q4/15 Q4/15 2010-10-21
[ 440-WP1 ]
Report - September 2010 - Q4/15 - G.hnem Rapporteur Meeting held in Geneva, Switzerland � Rapporteur Q4/15 Q4/15 2010-10-21
[ 439-WP1 ]
Report - August 2010 -Q4/15 - Rapporteur Meeting held in Mechelen, Beligum � Rapporteur Q4/15 Q4/15 2010-10-21
[ 438-WP1 ]
Report - July 2010 - Q4/15 - G.hn Rapporteur Meeting held in Geneva, Switzerland � Rapporteur Q4/15 Q4/15 2010-10-21
[ 437-WP1 ]
Report - July 2010 - Q4/15 - G.hnem Rapporteur Meeting held in Geneva, Switzerland � Rapporteur Q4/15 Q4/15 2010-10-21
[ 436-WP1 ]
oLS: Progress on G.987 series and on OMCI-EPON � TSB Q2/15 2010-10-19
[ 435-WP1 ]
A.5 justification information for draft new G.9980 (see also TD/PLEN 340) � Editor G.9980 Q4/15, Q2/15, Q1/15 2010-10-19
[ 434-WP1 ]
(Rev.1)
Interim rapporteur activity report for 22 October, 2010 WP1/15 meeting � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2010-10-21
[ 433-WP1 ]
(Rev.1)
Liaison activity for 22 October, 2010 WP1/15 meeting � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2010-10-22
[ 432-WP1 ]
WP1/15 texts for consent and agreement � Chairman WP1/15 Q4/15, Q2/15, Q1/15 2010-10-19
[ 431-WP1 ]
Report of WP1/15 meeting 22 October 2010 � TSB Q4/15, Q2/15, Q1/15 2010-10-19
[ 430-WP1 ]
Corrigendum 1 to Rec. G.992.5 (for consent) � Editor G.992.5 Q4/15 2010-10-19
[ 429-WP1 ]
Amendment 3 to Rec. G.992.3 (for consent) � Editor G.992.3 Q4/15 2010-10-19
[ 428-WP1 ]
(Rev.1)
List of participants - Working Party 1/15, Geneva, 18-22 October 2010 � TSB Q4/15, Q2/15, Q1/15 2010-10-19
[ 427-WP1 ]
Liaison statement to Working Party 1A (copy for information to Working Parties 3L, 4C, 5A, 5B, 5C, 6A and ITU-T Study Group 15): Developments on PLT systems � ITU-R WP7D Q4/15 2010-10-18
[ 426-WP1 ]
Draft G.997.1 Amendment 2 (for Consent) � Editor G.997.1 Q4/15 2010-10-14
[ 425-WP1 ]
Draft G.994.1 Amendment 6 (for Consent) � Editor G.994.1 Q4/15 2010-10-14
Resultats:115 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� TSB EDH
Mis � jour le :�2025-1-11