Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 59 ]
�
� |
Liaison statement on response to questions on the role of powerline telecommunications in home-networking
�
� |
ITU-T SG15
� |
� |
2024-07-18 |
|
[ 58 ]
�
� |
Reply liaison statement on the latest version of access network transport (ANT) and home network transport (HNT) standards overviews and work plans
�
� |
ITU-T SG15
� |
� |
2024-07-18 |
|
[ 57 ]
�
� |
Information on the preparation of texts for the draft CPM Report to WRC-27
�
� |
Chair, CPM-27
� |
� |
2024-07-09 |
|
[ 56 ]
�
� |
Liaison statement on collaboration matters related to EMF
�
� |
ITU-T SG5
� |
� |
2024-07-09 |
|
[ 55 ]
�
� |
Reply liaison statement to Working Parties 5A, 5B, 5C, 6A and 7A - Revision of Report ITU-R SM.2449-0 and Recommendation ITU-R SM.2129-0 regarding wireless power transmission for mobile and portable devices
�
� |
WP 1A
� |
� |
2024-07-03 |
|
[ 54 ]
�
� |
Reply liaison statement to Working Party 5B (copy to Working Parties 5C, 6A and 7A for information) - WRC-27 agenda item 1.9
�
� |
WP 3L
� |
AI1.9
� |
2024-06-13 |
|
[ 53 ]
�
� |
Reply liaison statement to Working Party 7C (copy to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D for information) - Relevant technical information to support studies under WRC-27 agenda item 1.17
�
� |
WPs 3L and 3M
� |
AI1.17
� |
2024-06-12 |
|
[ 52 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 4A, 4B, 5A, 5B, 5C, 5D, 6A,7B, 7C and 7D for information) - Studies under WRC-27 agenda items 1.11, 1.12, 1.13 and 1.14
�
� |
WPs 3L and 3M
� |
AI1.14, AI1.13, AI1.12, AI1.11
� |
2024-06-12 |
|
[ 51 ]
�
� |
Reply Liaison statement on draft ITU-T Technical Report J.TR.WiFiTV "Secondary distribution of digital television and audiovisual content to portable devices using wireless local area network"
�
� |
ITU-T SG9
� |
� |
2024-06-12 |
|
[ 50 ]
�
� |
Liaison statement on AAP consent of draft new Recommendation ITU-T J.153 "System architecture for cable television services to use IMT-2020 radio systems"
�
� |
ITU-R SG9
� |
� |
2024-06-12 |
|
[ 49 ]
�
� |
Reply liaison statement to Working Party 5C (copy to Working Parties 1A, 4A, 4B, 4C, 5A, 5B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
WPs 3J and 3M
� |
AI1.10
� |
2024-06-11 |
|
[ 48 ]
�
� |
Reply liaison statement to Working Party 4C (copy to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5D, 6A, 7B, 7C and 7D for information) - Fixed service characteristics for use in sharing studies under WRC-27 agenda item 1.13
�
� |
WP 5C
� |
AI1.13
� |
2024-05-29 |
|
[ 47 ]
�
� |
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 3J and 3M (copy to Working Parties 1A, 4B, 6A, 7C and 7D for information) - Studies under WRC-27 agenda item 1.10
�
� |
WP 5C
� |
AI1.10
� |
2024-05-29 |
|
[ 46 ]
�
� |
Liaison statement to ITU-R Working Parties 3L, 5C, 6A and 7A (copy to ICAO for information) - Request for relevant technical information to support studies under WRC-27 agenda item 1.9 in order to review Appendix 26 of the Radio Regulations to support modernization of high-frequency spectrum use in the aeronautical mobile (OR) service
�
� |
WP 5B
� |
AI1.9
� |
2024-05-28 |
|
[ 45 ]
�
� |
Liaison statement to Working Party 6A - Revision of Recommendation ITU-R BT./BO.1774-2
�
� |
WP 4B
� |
� |
2024-05-06 |
|
[ 44 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Technical information to support the studies for WRC-27 agenda item 1.13
�
� |
WP 4C
� |
AI1.13
� |
2024-05-01 |
|
[ 43 ]
�
� |
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)
�
� |
Chair, CCV
� |
� |
2024-04-22 |
|
[ 42 ]
�
� |
Liaison statement to Working Parties 3L, 3M, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B and 7D - Relevant technical information to support studies under WRC-27 agenda item 1.17
�
� |
WP 7C
� |
AI1.17
� |
2024-03-25 |
|
[ 41 ]
�
� |
Reply liaison statement to ITU-T Study Group 15 (copy to ITU-R Working Parties 6A and 6C)
�
� |
WP 6B
� |
� |
2024-03-25 |
|
[ 40 ]
�
+Ch.1-5� |
Report of the meeting of Working Party 6A (Geneva, 5-13 March 2024)
�
� |
Acting Chair, WP 6A
� |
� |
2024-03-13 |
|
[ 39 ]
�
� |
Final list of participants - Working Party 6A (Geneva, 5-13 March 2024)
�
� |
Director, BR
� |
� |
2024-03-13 |
|
[ 38 ]
�
� |
Preliminary position on WRC-27 agenda
�
� |
WMO
� |
� |
2024-03-06 |
|
[ 37 ]
�
(Rev.2)� |
List of documents issued (Documents 6A/1 - 6A/38)
�
� |
BR, Study Groups Department
� |
� |
2024-03-04 |
|
[ 36 ]
�
(Rev.4)� |
Proposed organization of the work of Study Group 6
�
� |
Chair, SG 6
� |
� |
2024-03-01 |
|
[ 35 ]
�
� |
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 6 and ITU-R Working Parties 6A, 6B and 6C - Strategies, policies, regulations and methods of migration to and adoption of digital technologies for broadcasting, including to provide new services for various environments
�
� |
ITU-D SG1
� |
� |
2024-03-01 |
|
[ 34 ]
�
� |
Update to Working Party 6A (March 2024)
�
� |
Chair, RG on RF Hazard issues
� |
� |
2024-02-27 |
|
[ 33 ]
�
� |
Report on the Rapporteur Group on the revision on the Handbook - HF Broadcasting System Design
�
� |
RG on Handbook
� |
� |
2024-02-26 |
|
[ 32 ]
�
� |
Proposal to progress the working document towards a preliminary draft new Report ITU-R BT.[ITCN] - Inter-Tower Communications Network (ITCN) for Terrestrial Broadcasting and Datacasting Systems
�
� |
Universidad Del Pa�s Vasco
� |
� |
2024-02-22 |
|
[ 31 ]
�
� |
Rapporteur Group - Future of Broadcasting Progress Report (October 2023 - February 2024)
�
� |
RG-FOB
� |
� |
2024-02-23 |
|
[ 30 ]
�
� |
Report of the Correspondence Group on the CISPR Radio Services Database
�
� |
CG on CISPR Radio Services Database
� |
� |
2024-02-23 |
|
[ 29 ]
�
� |
Comments on WRC-27 agenda items and draft template liaison statement
�
� |
United Kingdom
� |
� |
2024-02-22 |
|
[ 28 ]
�
� |
Update on EMC related interference issues
�
� |
Chair, RG on EMC and RF Noise
� |
� |
2024-02-22 |
|
[ 27 ]
�
� |
Working document toward preliminary draft revision of Recommendation ITU-R BT.2016-3 - Error-correction, data framing, modulation and emission methods for terrestrial multimedia broadcasting for mobile reception using handheld receivers in VHF/UHF bands
�
� |
China
� |
� |
2024-02-22 |
|
[ 26 ]
�
� |
Working document towards a preliminary draft revision of Report ITU-R BT.2526-0 - 5G NR MBS network planning and trial
�
� |
China
� |
� |
2024-02-22 |
|
[ 25 ]
�
(Rev.1)� |
Report for Working Party 6A block meeting of March 2024
�
� |
RG on SAB/SAP Issues
� |
� |
2024-02-22 |
|
[ 24 ]
�
� |
Proposed actions on working document towards a preliminary draft new Report ITU-R BT.[IMPLEMENT TMMB SYSTEM-L] - Terrestrial Multimedia Mobile Broadcasting: Planning and implementation of System-L networks
�
� |
European Broadcasting Union (EBU)
,
Broadcast Networks Europe
� |
� |
2024-02-21 |
|
[ 23 ]
�
� |
Proposed revision to Report ITU-R BT.2049, Report ITU-R BT.2295 and Recommendation ITU-R BT.2016 related to the terrestrial multimedia mobile broadcasting System L
�
� |
European Broadcasting Union (EBU)
,
Broadcast Networks Europe
� |
� |
2024-02-21 |
|
[ 22 ]
�
� |
Proposal for a new ITU-R Report - Usage Scenarios and Key Technologies of 5G-based UHD/HD Contribution and Production
�
� |
China
� |
� |
2024-02-21 |
|
[ 21 ]
�
� |
Working document towards a preliminary draft revision of Report ITU-R BT.2468-1 - Guidance for selection of system parameters and implementation of second generation DTTB systems
�
� |
RG on ATSC 3.0
� |
� |
2024-02-21 |
|
[ 20 ]
�
� |
Report on activities between September 2023 and February 2024
�
� |
RG on ATSC 3.0
� |
� |
2024-02-21 |
|
[ 19 ]
�
� |
Draft liaison statement to Working Party 5B - Protection requirements for the HF Broadcasting Service relative to WRC-27 agenda item 1.9
�
� |
HFCC-International Broadcasting Delivery
� |
AI1.9
� |
2024-02-20 |
|
[ 18 ]
�
� |
Proposed revision of Report ITU-R BT.2526 - Field trials of terrestrial multimedia mobile broadcasting systems
�
� |
Rai Way S.p.A.
� |
� |
2024-02-20 |
|
[ 17 ]
�
� |
Proposed revision of Report ITU-R BT.2140-14 - Transition from analogue to digital terrestrial television broadcasting
�
� |
Brazil
� |
� |
2024-02-20 |
|
[ 16 ]
�
� |
Proposed revision of Report ITU-R BT.2526-0 - Field trials of terrestrial multimedia mobile broadcasting systems
�
� |
France
� |
� |
2024-02-19 |
|
[ 15 ]
�
� |
[Preliminary] draft revision of Report ITU-R BT.2526 - Field trials of terrestrial multimedia mobile broadcasting systems (Evaluation of ATSC 3.0 System)
�
� |
Korea (Republic of)
,
RG on ATSC 3.0
� |
� |
2024-02-21 |
|
[ 14 ]
�
� |
[Preliminary] draft revision of Report ITU-R BT.2526 - Field trials of terrestrial multimedia mobile broadcasting systems (Evaluation of 3GPP Rel-17 5G broadcasting system)
�
� |
Korea (Republic of)
,
RG on ATSC 3.0
� |
� |
2024-02-21 |
|
[ 13 ]
�
� |
Preliminary draft revision of Report ITU-R BT.2343-8 - Collection of field trials of UHDTV over DTT networks
�
� |
Korea (Republic of)
,
RG on ATSC 3.0
� |
Q133-1/6
� |
2024-02-21 |
|
[ 12 ]
�
� |
Revision of Recommendation ITU-R BS.705 to include Yagi antennas
�
� |
United States
� |
� |
2024-02-16 |
|
[ 11 ]
�
� |
Brazilian next-generation Digital Terrestrial Television (Information document)
�
� |
Brazil
� |
� |
2024-02-16 |
|
[ 10 ]
�
� |
Proposed revision of Report ITU-R BT.2485-2 - Advanced network planning and transmission methods for enhancements of digital terrestrial television broadcasting
�
� |
Japan
� |
Q133-2/6, Q132-7/6
� |
2024-02-16 |
Resultats:109 documents R�sultats :�
Pr�c�dent�-�
1 -
2 -
3
�-�Suivant
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):