Union Internationale des T�l�communications UIT
EnglishEspa�ol
Plan du site Contactez-nous Copie Imprimable
Page d'accueil : UIT-R : WP1B : Contributions� Ajout�s r�cemment�-� Recherche de documents de r�union
UIT-R�WP1B� C�

UIT-R�WP1B

M�thodologies de la Gestion du Spectre et Strat�gies Economiques

Resultats:117 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 �-�Suivant Next
Contributions��Documents / Contributions

Num�ro
Titre Source AI/Question
Date
[ 67 ]
Liaison statement to CCV (copy to Study Group 7 and Working Parties 1B, 5A, 5C, 5D, 7B and 7C) - Symbols in Recommendation ITU-R V.431-8 inconsistent with SI Definitions � WP 7D 2022-05-02
[ 66 ]
Adding symbol to the ninth ITU Radio Regulations band and revising Recommendation ITU-R V.431-8 - Nomenclature: Number 12, THF 300 to 3 000 GHz, Decimillimetric waves � ATDI Q228/3 2022-04-06
[ 65 ]
Liaison statement on invitation to review artificial intelligence standardization roadmap and provide missing or updated information � ITU-T SG13 2021-12-15
[ 64 ]
+Ann.1-4
Report on the third 2019-2023 meeting of Working Party 1B (E-meeting, 3-10 November 2021) � Chairman, WP 1B 2021-11-10
[ 63 ]
Final List of Participants - Working Party 1B (E-meeting, 3-8 November 2021) � Director, BR 2021-11-10
[ 62 ]
List of documents issued (Documents 1B/50 - 1B/62) � BR, Study Groups Department 2021-11-02
[ 61 ]
Liaison statement to Working Party 1B (copied for information to Working Parties 5B and 7D) - Revision to Recommendation ITU-R SM.1896-1 � WP 4C 2021-10-27
[ 60 ]
Proposed modification to the working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] � China (People's Republic of) 2021-10-27
[ 59 ]
Factors need to be considered when developing the working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] � China (People's Republic of) Q241/1 2021-10-27
[ 58 ]
Proposed modification to working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-10-26
[ 57 ]
Proposed revision of Report ITU-R SM.2015-1 - Methods for determining national long-term strategies for spectrum utilization � Korea (Republic of) 2021-10-26
[ 56 ]
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1, Working Party 1B, Study Group 6, Working Party 6A and Working Party 6C, and ITU-T SG9 and SG16 on ITU-D SG1 Question 2/1 for discussions and final Report - Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and implementation of new services � ITU-D SG1 2021-10-25
[ 55 ]
Working document towards preliminary draft revision of Report ITU-R SM.2153-8 - Technical and operating parameters and spectrum use for short-range devices � United States of America 2021-10-22
[ 54 ]
Liaison statement on establishment of a new ITU-T Focus Group on Artificial Intelligence (AI) and Internet of Things (IoT) for digital agriculture (FG-AI4A) � ITU-T SG20 2021-10-22
[ 53 ]
Reply liaison statement to Working Party 1B - Revision to Recommendation ITU-R SM.1896-1 � WP 7D 2021-09-24
[ 52 ]
Reply liaison statement to ITU-R Working Party 1B on the work related to Report ITU-R SM.2423 � Asia-Pacific Telecommunity 2021-09-17
[ 51 ]
Reply liaison statement to Working Party 5D (copy to Working Parties 1B, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C and 7D for information) - WRC-23 agenda items 1.1 and 1.2 � WPs 3K and 3M AI1.2, AI1.1 2021-07-05
[ 50 ]
+Ann.1-5
Report on the second 2019-2023 meeting of Working Party 1B (e-meeting, 25-28 May 2021) � Chairman, WP 1B 2021-05-31
[ 49 ]
Final List of Participants - Working Party 1B (E-meeting, 25-28 May 2021) � Director, BR 2021-05-31
[ 48 ]
List of documents issued (Documents 1B/36 - 1B/48) � BR, Study Groups Department 2021-05-24
[ 47 ]
Reply liaison statement to Working Party 5D (copy for information to Working Parties 1B, 5C and 7B) - WRC-23 agenda item 1.1 - Characteristics of aeronautical systems and maritime systems operating in the frequency band 4 800-4 990 MHz � WP 5B 2021-05-24
[ 46 ]
Proposed revision of Report ITU-R SM.2093-3 - Guidance on the regulatory framework for national spectrum management � Brazil (Federative Republic of) 2021-05-17
[ 45 ]
Proposed modification to the elements of a working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] � China (People's Republic of) Q240/1 2021-05-17
[ 44 ]
Proposed working document towards a preliminary draft new Report ITU-R SM.[SPEC-AVAILABILITY] - Methodologies for assessing or predicting spectrum availability � Korea (Republic of) Q241/1 2021-05-14
[ 43 ]
Revisions to working document toward a preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices � United States of America 2021-05-13
[ 42 ]
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 1A, 1B and 7C) - Request for technical characteristics under Resolution 731 (Rev.WRC-19) � WP 7D 2021-04-19
[ 41 ]
Liaison statement to Working Party 1B (copy to Working Party 4C) - Draft revision of Recommendation ITU-R SM.1896-1 to include operation of assistive listening devices at 1 656.5-1 660.5 MHz � WP 7D 2021-04-16
[ 40 ]
APT Report on low power wide area network system for the Internet of things based on non-cellular technologies � Asia-Pacific Telecommunity 2021-04-07
[ 39 ]
Reply liaison statement from ITU-D SG1 to ITU-R WPs 1B, 6A and 6C on ITU-D Question 2/1 final Report "Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and implementation of new services" and on ITU-D Question 4/1 final Report "Economic policies and methods of determining the costs of services related to national telecommunication/ICT � ITU-D SG1 2021-03-30
[ 38 ]
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 5C, and 7B) - WRC-23 agenda item 1.1 � WP 5D AI1.1 2021-03-19
[ 37 ]
Preliminary position on WRC-23 agenda � World Meteorological organization 2021-03-17
[ 36 ]
+Ann.1-6
Report on the first 2019-2023 meeting of Working Party 1B (e-meeting, 24 November - 2 December 2020) � Chairman, WP 1B 2020-12-02
[ 35 ]
Final list of participants Working Party 1B (e-meeting, 24 November - 2 December 2020) � Director, BR 2020-12-02
[ 34 ]
List of Documents issued (Documents 1B/1 - 1B/34) � BR, Study Groups Department 2020-11-24
[ 33 ]
Proposed Correspondence Group on the editorial review and maintenance of ITU-R Recommendations and Reports assigned to Study Group 1 � Chairman, SG 1 2020-11-24
[ 32 ]
Liaison statement to ITU-T Study Group 11 (copy to ITU-D SG2 Q5/2, Inter-Sector Coordination Group and ITU R Working Parties 1B, 5A and 5D) - Disaster Relief Use Cases � WP 5B 2020-11-20
[ 31 ]
Reply liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 4C, 5A, 5B, 5D, 6A, and 7D for information) - WRC-23 agenda item 9.1, topic a) � WP 5C AI9.1A) 2021-01-26
[ 30 ]
Proposed modification to preliminary draft revision of Recommendation ITU-R SM.1896-1 - Frequency ranges for global or regional harmonization of short-range devices � China (People's Republic of) 2020-11-16
[ 29 ]
Proposed modification to Report ITU-R SM.2153-7 - Technical and operating parameters and spectrum use for short range radiocommunication devices � China (People's Republic of) 2020-11-16
[ 28 ]
Modification to working document towards a preliminary draft new Report ITU-R SM.[ASSESS-SPEC-EFFI-AND-ECON-VAL] - [Assessment of spectrum efficiency and economic value] � China (People's Republic of) 2020-11-16
[ 27 ]
Proposed revision of Report ITU-R SM.2153-7 [updating SRD related legislation in Korea] - Technical and operating parameters and spectrum use for short range radiocommunication devices � Korea (Republic of) 2020-11-13
[ 26 ]
Proposed revision of Report ITU-R SM.2153-7 - Technical Regulation for SRDs in Korea � Korea (Republic of) 2020-11-13
[ 25 ]
(Rev.1)
Proposed draft new ITU-R Question - Spectrum management framework for the introduction of Ground-and Wall-Penetrating Radar imaging systems � Korea (Republic of) 2020-11-13
[ 24 ]
Liaison statement to ITU-T Study Group 11 (copy to ITU-D SG2 Q5/2, Intersector Coordination Group, and ITU-R Working Parties 1B, 5A and 5B) - Disaster Relief Use Cases � WP 5D 2020-10-28
[ 23 ]
Liaison statement to Working Parties 1B, 5B, 5C and 7D - WRC-23 agenda item 1.1 � WP 5D AI1.1 2020-10-27
[ 22 ]
Liaison statement from ITU-D Study Group 2 Questions 5/2 to ITU-T SG 2, ITU-T SG 5, ITU-T SG 11, ITU-T SG 12, ITU-T SG 15, ITU-T SG 16, ITU-T SG 20, ITU-R Study Group 1, Working Parties 1B, 1C, 4A, 4B, 4C, 5A, 5D, Study Group 6, Working Party 6A, Study Group 7 on the final Report of ITU-D Q5/2 and draft future work of ITU-D Q5/2 to WTDC-21 � ITU-D SG2 2020-10-27
[ 21 ]
Liaison statement to Working Parties 1B, 5A and 5C - Review of Recommendation ITU-R BT.1871-2 and Report ITU-R BT.2344 with regard to Resolution ITU-R 59-2 � WP 6A 2020-10-26
[ 20 ]
(Rev.1)
List of assignments that the administration of Iran (Islamic Republic of) had notified to the Bureau and that are within the frequency bands subject to WRC-23 agenda items � Iran (Islamic Republic of) 2020-10-21
[ 19 ]
Reply liaison statement to ITU-R Working Parties 3K and 3M (copy to Working Parties 1B, 3J, 4A, 4B, 4C, 5A, 5B, 5C, 7B, 7C, and 7D for information) - Preparations for WRC-23 agenda items 1.1 and 1.2 � WP 5D AI1.2, AI1.1 2020-10-21
[ 18 ]
Liaison statement to Working Party 7C (copy to Working Parties 1B, 3J, 3K, 3L, 3M, 4A, 5A, 5B, 5C, 5D and 7D) - WRC-23 agenda item 9.1, topic a) � WP 6A AI9.1A) 2021-01-26
Resultats:117 documents
R�sultats :� Pr�c�dent�-� 1 - 2 - 3 �-�Suivant Next
T�l�chargement de multiples documents:�Cocher les cases correspondant aux documents s�lectionn�s, puis appuyer sur "T�l�charger"

Pr�f�rences utilisateur:
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):
Pages de navigation HTML
Formats �+�Autres formats
Langues (maximum 2) �+�Multilingue�
(E: Anglais - F: Fran�ais - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

D�but de page�-� Commentaires�-� Contactez-nous�-� Droits d'auteur � UIT�2008�Tous droits r�serv�s
Contact pour cette page :� Coordinateur du Web UIT-R
Mis � jour le :�2023-10-19