Contributions�� |
�
|
Num�ro�
|
Titre
|
Source
|
AI/Question
|
Date
|
|
[ 26 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2004-09-20 |
|
[ 25 ]
�
� |
Response to liaison statement from Task Group 1/8 to Working Parties 9A and 9D - Technical characteristics of Fixed Wireless Access (FWA) systems deploying indoor terminal stations (TS) operating around 3.5 GHz
�
� |
United Kingdom of Great Britain and Northern Ireland
� |
� |
2004-09-17 |
|
[ 24 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.1093-1 - Effects of multipath propagation on the design and operation of line-of-sight digital fixed wireless systems
�
� |
Brazil (Federative Republic of)
� |
� |
2004-09-24 |
|
[ 23 ]
�
� |
Additional allocation of Working Party 9B documents
�
� |
Chairman WP 9B
� |
� |
2004-09-15 |
|
[ 22 ]
�
� |
Preliminary draft revision of Recommendation ITU-R F.1330-1 - Performance limits for bringing into service of the parts of international plesiochronous digital hierarchy and synchronous digital hierarchy paths and sections implemented by digital radio-relay systems
�
� |
Russian Federation
� |
161/9
� |
2004-09-15 |
|
[ 21 ]
�
� |
Proposed revision of PDNR on availability objectives for real digital fixed wireless links used in 27 500 km hypothetical reference paths
�
� |
Canada
� |
102-4/9
� |
2004-09-14 |
|
[ 20 ]
�
� |
Recommendation ITU-R F.1093 - Effects of multipath propagation on the design and operation of line-of-sight digital radio-relay systems
�
� |
Australia
� |
122/9
� |
2004-09-03 |
|
[ 19 ]
�
� |
Possible consideration of DNR ITU-R F.[9B/TREND]
�
� |
Chairman, WP 9B
� |
� |
2004-07-09 |
|
[ 18 ]
�
� |
Liaison statement to Working Parties 9A and 9D - Fixed wireless access (FWA) systems - Deployment characteristics and protection requirements for indoor deployed terminal stations (TS)
�
� |
TG 1/8
� |
� |
2004-06-24 |
|
[ 17 ]
�
� |
Liaison statement to ITU-R Working Party 9A - Status of Recommendation ITU-R M.2301
�
� |
ITU-T SG4
� |
� |
2004-05-25 |
|
[ 16 ]
�
+Ann.1-5� |
Report of the meeting of Working Party 9A - Geneva, 19-26 February 2004
�
� |
Chairman, WP 9A
� |
� |
2004-03-01 |
|
[ 15 ]
�
� |
Final List of Participants - Working Party 9A
�
� |
Director, BR
� |
� |
2004-02-25 |
|
[ 14 ]
�
� |
List of documents issued
�
� |
BR Study Group Department
� |
� |
2004-02-18 |
|
[ 13 ]
�
� |
Additional allocation of a WP 9B document
�
� |
Chairman, WP 9B
� |
� |
2004-02-12 |
|
[ 12 ]
�
(Rev.1)� |
Contribution to the long-term interference objective for coexistence between ultra-wide band (UWB) short range radars (SRR) for automotive applications and the fixed service in the bands around 24 GHz
�
� |
Robert Bosch GMBH
,
Siemens AG
� |
� |
2004-02-10 |
|
[ 11 ]
�
� |
Preliminary draft new Recommendation - Availability objectives for real digital fixed wireless links used in 27 500 km hypothetical reference paths
�
� |
Russian Federation
� |
102/9
� |
2004-02-09 |
|
[ 10 ]
�
� |
Performance objectives for fixed wireless systems carrying Internet protocol communications services
�
� |
Canada
� |
� |
2004-01-29 |
|
[ 9 ]
�
� |
Liaison statement from Working Parties 3J and 3M - Impact of Recommendation ITU-R P.837-4 on FS link design using rain attenuation calculations in Recommendation ITU-R P.530-10
�
� |
WPs 3J and 3M
� |
� |
2003-12-22 |
|
[ 8 ]
�
� |
Liaison statement to Working Party 4-9S and Working Party 9A for information - Request for additional information concerning rain fade events and statistics in the bands 37.5-40.0 GHz and 42.0-42.5 GHz
�
� |
WPs 3J and 3M
� |
� |
2003-12-19 |
|
[ 7 ]
�
� |
Liaison statement to WP 9A - ITU-T Recommendations M.2110, M.2120 and M.2301
�
� |
ITU-T SG 4
� |
� |
2003-11-18 |
|
[ 6 ]
�
� |
Liaison statement to WPs 4A, 4-9S, 6E, 6S, 7B, 7C, 7D, 8A, 8B, 8D, 8F, 9A and 9D - Working material towards draft new Recommendation ITU-R SM.[ ] - Interference criteria for the evaluation of harmful effect of interference between radiocommunication networks operating in a shared frequency band
�
� |
WP 1B
� |
� |
2003-11-13 |
|
[ 5 ]
�
� |
Summary of results of RA-03, WRC-03 and CPM06-1
�
� |
Chairman, SG 9
� |
� |
2003-11-05 |
|
[ 4 ]
�
� |
Liaison statement to WP 9D (for action) and to WP 9A (for information) - Use of interference scenario occurrence probability (ISOP) on long-term interference objective and aggregate interference limits for coexistence between ultra-wideband short range radars for automotive applications and the fixed service in the bands around 24 GHz
�
� |
TG 1/8
� |
� |
2003-11-04 |
|
[ 3 ]
�
� |
Liaison statement on the NGN 2004 ITU-T project
�
� |
ITU-T SG 13
� |
� |
2003-08-25 |
|
[ 2 ]
�
� |
Liaison statement - Consent of draft revised Recommendation G.827
�
� |
ITU-T SG 13
� |
� |
2003-08-25 |
|
[ 1 ]
�
� |
Documents to be carried over from the 2000-2003 study period
�
� |
N/A
� |
� |
2003-07-21 |
Resultats:76 documents R�sultats :�
Pr�c�dent�-�
1 -
2
� |
T�l�chargement de multiples documents:�Formats et langues � prendre en compte (si disponibles):