Contribuciones�� |
�
|
N�mero�
|
T�tulo
|
Origen
|
AI/Cuesti�n
|
Fecha
|
|
[ 852 ]
�
� |
Proposal of the update of the Appendixes I and II of the ITU-T Recommendation K.83
�
� |
Orange Polska S.A. (Poland)
� |
Q3/5
� |
2021-11-16 |
|
[ 851 ]
�
(Rev.1)� |
Proposed update of ITU-T Draft L.Suppl.resource_sav "Examples of resource saving by using ICT technologies"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q7/5
� |
2021-11-16 |
|
[ 850 ]
�
(Rev.1)� |
Proposal of the revision of the Appendix I of the Recommendation ITU-T K.70o
�
� |
Orange Polska S.A. (Poland)
� |
Q3/5
� |
2021-11-16 |
|
[ 849 ]
�
� |
Proposal of the first draft of the ITU-T Recommendation K.zones
�
� |
Orange Polska S.A. (Poland)
� |
Q3/5
� |
2021-11-16 |
|
[ 848 ]
�
� |
L.5G_sav - "Energy saving technologies and best practices for 5G RAN equipment" proposed the updated draft of the new ITU-T recommendation for discussion
�
� |
China Telecommunications Corporation
,
ZTE Corporation (China)
� |
Q6/5
� |
2021-11-16 |
|
[ 847 ]
�
(Rev.1)� |
China Telecom's proposal to 1st draft of ITU-T L.ESE "Evaluation method of safety operations and energy efficiency for power supply system in telecommunication room/building"
�
� |
China Telecommunications Corporation
� |
Q11/5
� |
2021-11-16 |
|
[ 846 ]
�
� |
Proposal to use QR code and Blockchain technologies for the efficient reuse of used batteries from electric vehicles (EVs)
�
� |
Korea (Rep. of)
� |
Q7/5
� |
2021-11-16 |
|
[ 845 ]
�
� |
EMF strength analysis of the 5G NR base station using the Ray-Tracing Method
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2021-11-16 |
|
[ 844 ]
�
(Rev.1-2)� |
Draft of K-Series Supplement-" EMF strength inside and outside of OLEV"
�
� |
Korea (Rep. of)
� |
Q3/5
� |
2021-11-16 |
|
[ 843 ]
�
(Rev.1)� |
Proposal new draft: L.Sup.RBS best practices to ITU-T L.1350 -series of Recommendations "Radio base station site best practices"
�
� |
Huawei Technologies Co., Ltd. (China)
,
Telecom Italia S.p.A. (Italy)
� |
Q6/5
� |
2021-11-15 |
|
[ 842 ]
�
(Rev.1)� |
Proposed A.1 justification for draft Recommendation ITU T L.ICT_PROCURE "Public procurement of ICTs to mitigate the adverse effects of e-waste"
�
� |
Huawei Technologies Co., Ltd. (China)
,
Telecom Italia S.p.A. (Italy)
� |
Q7/5
� |
2021-11-15 |
|
[ 841 ]
�
(Rev.1)� |
Initial baseline text of draft Recommendation ITU T L.ICT_PROCURE
"Public procurement of ICTs to mitigate the adverse effects of e-waste"
�
� |
Huawei Technologies Co., Ltd. (China)
,
Telecom Italia S.p.A. (Italy)
� |
Q7/5
� |
2021-11-15 |
|
[ 840 ]
�
� |
Input from e-meeting 14th of October - L.VirtualMeetings
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q9/5
� |
2021-11-15 |
|
[ 839 ]
�
(Rev.1)� |
Input from e-meeting 16th of September - L.VirtualMeetings outline
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q9/5
� |
2021-11-15 |
|
[ 838 ]
�
(Rev.1)� |
Input from e-meeting 16th of September - L.Enablement
�
� |
Telefon AB - LM Ericsson (Sweden)
� |
Q9/5
� |
2021-11-15 |
|
[ 837 ]
�
(Rev.1)� |
Proposal on emission limit to K.power_emc draft
�
� |
ZTE Corporation (China)
� |
Q4/5
� |
2021-11-15 |
|
[ 836 ]
�
� |
An interactive map showing results of 5G EMF surveys covering all frequency bands
�
� |
GSMA (United Kingdom)
,
Telstra Corporation Ltd. (Australia)
� |
Q3/5
� |
2021-11-15 |
|
[ 835 ]
�
� |
Discussion on exception conditions included in K.21, K.45 "Resistibility of telecommunication equipment installed in customer premises, access and trunk networks to over voltages and over currents"
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q2/5
� |
2021-11-15 |
|
[ 834 ]
�
� |
Discussion on future revision of K.Sup.24: "Rationale for setting resistibility requirements of telecommunication equipment installed in a telecommunication centre against lightning"
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q2/5
� |
2021-11-15 |
|
[ 833 ]
�
(Rev.1)� |
Proposed revision of Recommendation K.87 "Guide for the application of electromagnetic security requirements - Overview"
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 832 ]
�
(Rev.1-2)� |
Revision of K.138 "Quality estimation methods and application guidelines for mitigation measures based on particle radiation tests"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 831 ]
�
(Rev.1-2)� |
Revision of K.139 "Reliability requirements for telecommunication systems affected by particle radiation"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 830 ]
�
(Rev.1-2)� |
Revision of K.131 "Design methodologies for telecommunication systems applying soft error measures"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 829 ]
�
(Rev.1-2)� |
Revision of K.130 "Neutron irradiation test methods for telecommunication equipment"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 828 ]
�
� |
Proposed draft new Recommendation K.power_emc "Electromagnetic compatibility requirements for power equipment in telecommunication facilities"
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q4/5
� |
2021-11-15 |
|
[ 827 ]
�
(Rev.1-2)� |
Revision of K.124 "Overview of particle radiation effects on telecommunication systems"
�
� |
NEC Corporation (Japan)
,
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q1/5
� |
2021-11-15 |
|
[ 826 ]
�
(Rev.1)� |
Draft revision of Recommendation ITU-T K.123 "Electromagnetic compatibility requirements for electrical equipment in telecommunication facilities"
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q4/5
� |
2021-11-15 |
|
[ 825 ]
�
� |
Proposed discussion about emission limit from 9 kHz to 150 kHz
�
� |
Nippon Telegraph and Telephone Corporation (NTT) (Japan)
� |
Q4/5
� |
2021-11-15 |
|
[ 824 ]
�
(Rev.1)� |
AAP K.147 comments on Annex A, Annex B and Bibliography
�
� |
Bourns Limited (United Kingdom)
� |
Q2/5
� |
2021-11-14 |
|
[ 823 ]
�
(Rev.1)� |
AAP K.147 comments on Clause 9
�
� |
Bourns Limited (United Kingdom)
� |
Q2/5
� |
2021-11-14 |
|
[ 822 ]
�
(Rev.1)� |
AAP K.147 comments on Clause 7 and 8
�
� |
Bourns Limited (United Kingdom)
� |
Q2/5
� |
2021-11-14 |
|
[ 821 ]
�
(Rev.1)� |
AAP K.147 comments on Clause 6
�
� |
Bourns Limited (United Kingdom)
� |
Q2/5
� |
2021-11-14 |
|
[ 820 ]
�
(Rev.1)� |
AAP K.147 comments on Title, Scope, Normative References and Definitions
�
� |
Bourns Limited (United Kingdom)
� |
Q2/5
� |
2021-11-14 |
|
[ 819 ]
�
� |
L.5G_sav- "Energy saving technologies and best practices for 5G RAN equipment" proposed text for the section on "Luneburg lens antenna energy saving in 5G network"
�
� |
China Mobile Communications Co. Ltd.
� |
Q6/5
� |
2021-11-12 |
|
[ 818 ]
�
� |
Proposal of revision of K.83 "Monitoring of electromagnetic field levels"
�
� |
National Institute of Information and Communications Technology (NICT) (Japan)
� |
Q3/5
� |
2021-11-12 |
|
[ 817 ]
�
(Rev.1)� |
mmWave EME Field Testing Results - 50 Surveys of 5GmmWave
�
� |
Telstra Corporation Ltd. (Australia)
� |
Q3/5
� |
2021-11-11 |
|
[ 816 ]
�
(Rev.1)� |
Contribution for ITU-T Draft L.Suppl.resource_sav "Examples of resource saving by using ICT technologies" on semiconductor manufacturing technologies
�
� |
Orange (France)
� |
Q7/5
� |
2021-11-09 |
|
[ 815 ]
�
(Rev.1)� |
National survey on conformity of telecommunications base stations in Uganda to ICNIRP guidelines and ITU standards.
�
� |
Uganda Communications Commission (UCC)
� |
Q3/5
� |
2021-10-13 |
|
[ 814 ]
�
(Rev.1)� |
Revision of ITU-T Recommendation K.91(12/2020)
�
� |
Israel
� |
Q3/5
� |
2021-10-11 |
Resultados :89 documentos Resultados :�
Anterior�-�
1 -
2
� |
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):