Uni�n Internacional de Telecomunicaciones UIT
EnglishFran�ais
Mapa Cont�ctenos Copia Imprimible
P�gina principal : UIT-T : SG15 : Reuni�n�2011-02-14�: Contribuciones� Nuevo�-� Busque los documentos de la reuni�n
UIT-T�SG15� C�(2011-02-14)�

UIT-T�SG15

Transport network structures

Periodo de estudios 2009

Reuni�n� del 2011-02-14 al 2011-02-25

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-09-102012-05-112011-12-052011-09-162010-10-222010-05-312010-01-152009-09-282009-05-152008-12-01

Resultados :418 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Siguiente Next
Contribuciones��Documents / Contributions

N�mero
T�tulo Origen AI/Cuesti�n
Fecha
[ 1468 ]
Transitional Link attributes for optical transponders and 3R regenerators in the OTN � Alcatel-Lucent Q14/15, Q12/15 2011-02-02
[ 1467 ]
(Rev.1)
Allocation and assignment of experimental and non-standard code points � United States of America Q10/15 2011-02-02
[ 1466 ]
G.hnem: Proposal for the text update of Annex C � Lantiq AEG Q4/15 2011-02-02
[ 1465 ]
(Rev.1)
USA on Consent of Draft Recommendation G.tpoam � United States of America Q10/15 2011-02-02
[ 1464 ]
G.hnem: Informative Appendix to describe use cases and installation examples � Lantiq AEG Q4/15 2011-02-02
[ 1463 ]
Wavelength conversion in reconfigurable multi-degree optical nodes � Deutsche Telekom Q7/15 2011-02-02
[ 1462 ]
Considerations on transverse compatibility for systems according to G.698.2 � Deutsche Telekom Q6/15 2011-02-02
[ 1461 ]
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications" � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1460 ]
G.gen: G.vdsl: G.hn: On the feasibility of a low complexity G.hn based FTTdp solution � CopperGate Communications Q4/15 2011-02-02
[ 1459 ]
G.8260: comments on WD107 from Edinburgh interim meeting (PDV metrics) � France Telecom , Tellabs Q13/15 2011-02-02
[ 1458 ]
Network PDV accumulation study with "end-to-end" data traffic model � France Telecom Q13/15 2011-02-02
[ 1457 ]
G.8275.1: mapping of PTPv2 messages in the PTPv2 telecom profile phase/time-oriented � France Telecom Q13/15 2011-02-02
[ 1456 ]
G.8272: comments on PRTC limits proposal � France Telecom Q13/15 2011-02-02
[ 1455 ]
G.8263: testing methodology for the PDV tolerance of a packet slave clock � France Telecom Q13/15 2011-02-02
[ 1454 ]
G.8261.1: Hypothetical Reference Models proposal � France Telecom Q13/15 2011-02-02
[ 1453 ]
G.8261.1: Preliminary proposal of PDV network limits for the HRM-1 � France Telecom Q13/15 2011-02-02
[ 1452 ]
Possible locations of external phase/time interfaces in a phase/time distribution chain based on Boundary Clocks � France Telecom Q13/15 2011-02-02
[ 1451 ]
Analysis of phase/time distribution over OTN networks � France Telecom Q9/15, Q13/15, Q11/15 2011-02-02
[ 1450 ]
Proposal of a Working Document from Q13 to Q2, Q4 and Q11 reflecting the current status of the work in Q13 on phase/time synchronization � France Telecom Q13/15 2011-02-02
[ 1449 ]
Further consideration of requirements for on-demand segment monitoring in MPLS-TP � NTT , Telecom Italia Q12/15, Q10/15 2011-02-02
[ 1448 ]
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP � NTT Q12/15, Q10/15 2011-02-02
[ 1447 ]
Proposal for additional delay measurement functions in MPLS-TP OAM � NTT Q9/15, Q14/15, Q10/15 2011-02-02
[ 1446 ]
Proposal of adding topic of Timing and Synchronization Aspects of Packet Networks in OTNT SWP � NTT Q3/15, Q13/15 2011-02-02
[ 1445 ]
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions � ISOC Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1444 ]
G.hn: corrections to Tunnel termination for a corrigendum to G.9961 � CopperGate Communications Q4/15 2011-02-02
[ 1443 ]
G.hn: Handling multicast traffic in G.hn � CopperGate Communications Q4/15 2011-02-02
[ 1442 ]
G.hn: Differentiate between DLL multicast traffic and PHY multicast traffic in G.hn � CopperGate Communications Q4/15 2011-02-02
[ 1441 ]
Withdrawn: MPLS-TP Standards � BT Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1440 ]
Second generation ETH MEP and MIP functions � Huawei Q9/15 2011-02-02
[ 1439 ]
Comments on differentiation of MPLS-TP environments � NSN Q9/15, Q14/15, Q12/15, Q10/15 2011-02-02
[ 1438 ]
G.gen: G.vdsl: G.ploam: Ambiguity of SES and UAS during re-initialization � Alcatel-Lucent Bell N.V. Q4/15 2011-02-02
[ 1437 ]
G.vdsl: Re-Initialization Policies: Proposed changes to working text for G.993.2 � Alcatel-Lucent Bell N.V. Q4/15 2011-02-02
[ 1436 ]
Control elements for BMCA in telecom � NSN Q13/15 2011-02-02
[ 1435 ]
MATIE, MTIE, and MAFE graphs into metrics definitions � NSN Q13/15 2011-02-02
[ 1434 ]
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications" � CopperGate Communications Q4/15 2011-02-02
[ 1433 ]
G.hn: Proposed Annex for extension of G.hn for optical transmission media � CopperGate Communications Q4/15 2011-02-02
[ 1432 ]
G.hn: Backup Domain master related corrigendum items for G.9961 � CopperGate Communications Q4/15 2011-02-02
[ 1431 ]
G.hn: Corrigendum items for G.9961 � CopperGate Communications Q4/15 2011-02-02
[ 1430 ]
G.hn: Update of the text for the "symbol boosting" mechanism � CopperGate Communications Q4/15 2011-02-02
[ 1429 ]
G.hn: Orthogonal preambles for the Neighbour domain interference mitigation (NDIM) mechanism � CopperGate Communications Q4/15 2011-02-02
[ 1428 ]
G.hn: MIMO transmission scheme for PHY frames and signals other than 'frames where the payload is intended only for MIMO receivers', for G.hn-MIMO � CopperGate Communications Q4/15 2011-02-02
[ 1427 ]
G.hn: Update of the "modulation of unloaded subcarriers" text of G.hn-MIMO � CopperGate Communications Q4/15 2011-02-02
[ 1426 ]
G.hn: Channel estimation protocol for G.hn-MIMO � CopperGate Communications Q4/15 2011-02-02
[ 1425 ]
G.hn: Update of the text of 'Tx ports mapping' for G.hn-MIMO � CopperGate Communications Q4/15 2011-02-02
[ 1424 ]
Treatment of delay jumps in PDV data � NSN Q13/15 2011-02-02
[ 1423 ]
Draft baseline text describing the Alternative Electrical Length Estimation Method (AELEM) � BT Q4/15 2011-02-01
[ 1422 ]
G.adsl: G.vdsl : Low Power Modes for Remote VDSL2 Nodes � BT Q4/15 2011-02-01
[ 1421 ]
G.VDSL: INM INPEQ Histogram � BT Q4/15 2011-02-01
[ 1420 ]
Functional model of HAO � Huawei Q9/15, Q11/15 2011-02-01
[ 1419 ]
G.VDSL: INM IAT Histogram � BT Q4/15 2011-02-01
Resultados :418 documentos
Resultados :� Anterior�-� 1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 �-�Siguiente Next
Telecarga de m�ltiples documentos:�Marcar las casillas correspondientes a los documentos seleccionados, a continuaci�n pulsar "Telecargar"

Preferencias del usuario:
Telecarga de m�ltiples documentos:�Formatos e idiomas que hay que tener en cuenta (si est�n disponibles):
P�ginas de navegaci�n HTML
Formatos �+�Otros formatos
Idiomas (m�ximo 2) �+�Multiling�e �
(E: ingl�s - F: franc�s - S: espa�ol - A: �rabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducci�n autom�tica de documentos
Comienzo de la p�gina�-� Comentarios�-� Cont�ctenos�-� Copyright � UIT�2008�Reservados todos los derechos
Contacto p�blico :� TSB EDH
Actualizado el :�2025-1-27